[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-501164":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},501164,223,1,"单选题","企业按弹性预算法编制费用预算，预算直接人工工时为100000小时，变动成本为60万元，固定成本为30万元，总成本费用为90万元。如果预算直接人工工时达到120000小时，则总成本费用为()万元。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","96",false,{"key":16,"text":17,"correct":14},"B","108",{"key":19,"text":20,"correct":21},"C","102",true,{"key":23,"text":24,"correct":14},"D","90","单位变动成本=60\u002F10=6(元\u002F小时)，固定成本为30万元，则总成本费用y=30+6x，如果直接人工工时为12万小时，则总成本费用=30+612=102(万元)。",{"id":6,"name":27,"category":28,"favorite":29},"会计学 (军队文职)","公务员",0]