[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-501055":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},501055,223,1,"单选题","可能导致无效费用开支项目无法得到有效控制，造成预算上的浪费的预算编制方法是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","固定预算",false,{"key":16,"text":17,"correct":14},"B","定期预算",{"key":19,"text":20,"correct":21},"C","增量预算",true,{"key":23,"text":24,"correct":14},"D","弹性预算","增量预算是指以基期成本费用水平为基础，结合预算期业务量水平及有关降低成本的措施，通过调整有关费用项目而编制预算的方法。缺点是可能导致无效费用开支项目无法得到有效控制，造成预算上的浪费。",{"id":6,"name":27,"category":28,"favorite":29},"会计学 (军队文职)","公务员",0]