[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-500645":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},500645,223,1,"单选题","某企业月初结存甲材料的计划成本为500万元，材料成本差异为超支90万元，当月入库甲材料的计划成本为1100万元，材料成本差异为节约差异170万元，当月生产车间领用甲材料的计划成本为1200万元，则当月生产车间领用甲材料的实际成本为( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1005万元",false,{"key":16,"text":17,"correct":18},"B","1140万元",true,{"key":20,"text":21,"correct":14},"C","1260万元",{"key":23,"text":24,"correct":14},"D","1395万元","材料成本差异率=（90-170）\u002F（500+1100）＝-0.05，当月生产领用甲材料的实际成本＝1200×（1-0.05）＝1140万元。",{"id":6,"name":27,"category":28,"favorite":29},"会计学 (军队文职)","公务员",0]