[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-492690":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},492690,219,1,"单选题","某机构于春节前在A社区托儿所开办了日间托老所。3个月来很少有人入住。在评估项目时，居民们反映托老所收费太贵，还不如住在家里舒服。根据居民反映的意见，该项目在策划过程中存在的主要问题是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","开办时间不合理",false,{"key":16,"text":17,"correct":14},"B","服务内容不明确",{"key":19,"text":20,"correct":14},"C","服务地方不舒适",{"key":22,"text":23,"correct":24},"D","服务与需求不匹配",true,"服务（活动）策划过程中的第一步是确认社区需求。即可以通过规范性需求、比较性需求、表达性需求和感觉性需要来界定社区需求。题中，项目策划过程中存在的主要问题就是服务与需求不匹配。",{"id":6,"name":27,"category":28,"favorite":29},"管理学与服务 (军队文职)","公务员",0]