[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-477740":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},477740,214,1,"单选题","项目的投资回收期是指（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","还清项目所有贷款所需的时间",false,{"key":16,"text":17,"correct":18},"B","从项目开始到项目获得的累计利润等于项目成本所需的时间",true,{"key":20,"text":21,"correct":14},"C","公司为启动项目而取得足够的资金所需要的时间",{"key":23,"text":24,"correct":14},"D","在项目投产后，公司收回股权投资所需的时间","",{"id":6,"name":27,"category":28,"favorite":29},"档案专业 (军队文职)","公务员",0]