[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-477599":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},477599,214,1,"单选题","以下各因素中，（ ）对项目沟通要求影响最大。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","项目干系人职责关系",false,{"key":16,"text":17,"correct":14},"B","外部信息需求",{"key":19,"text":20,"correct":14},"C","技术可利用性",{"key":22,"text":23,"correct":24},"D","项目的组织结构",true,"",{"id":6,"name":27,"category":28,"favorite":29},"档案专业 (军队文职)","公务员",0]