[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-477302":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},477302,214,1,"单选题","项目控制是保证工程在一定资源情况下能如期完成的技术手段，下面（ ）不属于项目控制所涉及的方面。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","进度控制",false,{"key":16,"text":17,"correct":14},"B","资源保证",{"key":19,"text":20,"correct":21},"C","系统设计",true,{"key":23,"text":24,"correct":14},"D","统计费用","项目控制是保证工程在一定资源情况下能如期完成的技术手段，项目控制所涉及的因素一般包括以下几个方面：（1）资源保证。资源一般包括人力、资金和物资。要保证计划进度的完成，首先必须保证资源的按时提供。（2）进度控制。必须定期检查信息系统开发中各项任务的实际执行情况，并制定各种具体的办法和措施以保证计划的执行或调整。（3）计划调整。在计划执行过程中，由于某种原因，当某项任务不能完成时，应及时采取措施，对计划和进度进行必要的调整，从而保证整体计划的按时完成。（4）审核批准。按照计划和进度已完成的项目必须有必要的审核和实施批准的手续。（5）费用统计。",{"id":6,"name":27,"category":28,"favorite":29},"档案专业 (军队文职)","公务员",0]