[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-209-34":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":507},{"id":5,"name":6,"category":7,"favorite":8},209,"土木建筑类 (电网)","公务员",0,34,50,2713,[13,30,38,50,58,66,74,82,94,104,111,118,130,142,150,162,174,186,194,206,214,226,238,250,260,272,282,294,306,316,324,336,344,352,359,367,375,387,395,403,415,427,434,441,452,459,471,483,491,499],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":29},450951,1,"单选题","如图所示的结构中，B支座发生支座移动，D点水平位移（向右为正）为（ ）。",[19,22,24,26],{"key":20,"text":20,"correct":21},"A",false,{"key":23,"text":23,"correct":21},"B",{"key":25,"text":25,"correct":21},"C",{"key":27,"text":27,"correct":28},"D",true,"",{"id":31,"libraryId":5,"type":15,"typeLabel":16,"stem":32,"options":33,"answer":25,"analysis":29},450952,"如图所示的刚架，各杆EI相同，C点竖向位移（向下为正）等于（ ）。",[34,35,36,37],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":28},{"key":27,"text":27,"correct":21},{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":25,"analysis":29},450953,"如图所示组合结构，梁式杆件EI＝常数，桁架杆件EA＝常数，C点竖向位移为（ ）。",[42,44,46,48],{"key":20,"text":43,"correct":21},"向上",{"key":23,"text":45,"correct":21},"向下",{"key":25,"text":47,"correct":28},"为零",{"key":27,"text":49,"correct":21},"需计算确定",{"id":51,"libraryId":5,"type":15,"typeLabel":16,"stem":52,"options":53,"answer":27,"analysis":29},450954,"如图所示，等截面梁的1\u002F3跨度处挠度为（ ）。",[54,55,56,57],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":21},{"key":27,"text":27,"correct":28},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":23,"analysis":29},450955,"如图所示的一三铰刚架，其右支座发生了位移，位移的水平分量为Δ1，竖向分量为Δ2，则右半部的转角为（ ）。",[62,63,64,65],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":28},{"key":25,"text":25,"correct":21},{"key":27,"text":27,"correct":21},{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":23,"analysis":29},450956,"设各杆的EA值相同，在图所示的桁架中，节点C的竖向位移为（ ）。",[70,71,72,73],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":28},{"key":25,"text":25,"correct":21},{"key":27,"text":27,"correct":21},{"id":75,"libraryId":5,"type":15,"typeLabel":16,"stem":76,"options":77,"answer":25,"analysis":29},450957,"如图所示结构，支座A发生了位移θA＝α，铰C左、右两侧的相对转角θ为（ ）。",[78,79,80,81],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":28},{"key":27,"text":27,"correct":21},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":29},450958,"如图所示，该体系的超静定次数为（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":28},"5",{"key":23,"text":89,"correct":21},"6",{"key":25,"text":91,"correct":21},"7",{"key":27,"text":93,"correct":21},"8",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":23,"analysis":29},450959,"如图所示，该体系的多余联系个数为（ ）。",[98,99,100,102],{"key":20,"text":91,"correct":21},{"key":23,"text":93,"correct":28},{"key":25,"text":101,"correct":21},"10",{"key":27,"text":103,"correct":21},"11",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":29,"options":106,"answer":25,"analysis":29},450960,[107,108,109,110],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":28},{"key":27,"text":27,"correct":21},{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":29,"options":113,"answer":23,"analysis":29},450961,[114,115,116,117],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":28},{"key":25,"text":25,"correct":21},{"key":27,"text":27,"correct":21},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":29},450962,"如图所示，桁架a杆的内力是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":28},"－3F",{"key":23,"text":125,"correct":21},"－2F",{"key":25,"text":127,"correct":21},"2F",{"key":27,"text":129,"correct":21},"3F",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":25,"analysis":29},450963,"如图所示的结构，CF杆的轴力为（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":21},"2P（拉）",{"key":23,"text":137,"correct":21},"P\u002F3（拉）",{"key":25,"text":139,"correct":28},"4P（拉）",{"key":27,"text":141,"correct":21},"4P（压）",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":29},450964,"图示结构，EI为常数。结点B处弹性支撑刚度系数k=3EI\u002FL3，C点的竖向位移为（ ）。",[146,147,148,149],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":21},{"key":27,"text":27,"correct":28},{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":20,"analysis":29},450965,"图示平面体系，多余约束的个数是（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":28},"1个",{"key":23,"text":157,"correct":21},"2个",{"key":25,"text":159,"correct":21},"3个",{"key":27,"text":161,"correct":21},"4个",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":25,"analysis":29},450966,"图示结构，A支座提供的约束力矩是（ ）。",[166,168,170,172],{"key":20,"text":167,"correct":21},"60kN·m，下表面受拉",{"key":23,"text":169,"correct":21},"60kN·m，上表面受拉",{"key":25,"text":171,"correct":28},"20kN·m，下表面受拉",{"key":27,"text":173,"correct":21},"20kN·m，上表面受拉",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":25,"analysis":29},450967,"桁架受力如图，下列杆件中，非零杆是（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":21},"杆4-5",{"key":23,"text":181,"correct":21},"杆5-7",{"key":25,"text":183,"correct":28},"杆1-4",{"key":27,"text":185,"correct":21},"杆6-7",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":20,"analysis":29},450968,"图示刚架，EI为常数，忽略轴向变形。当D支座发生支座沉降时，B点转角为（ ）。",[190,191,192,193],{"key":20,"text":20,"correct":28},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":21},{"key":27,"text":27,"correct":21},{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":23,"analysis":29},450969,"图所示静定三铰拱，拉杆AB的轴力等于（ ）。",[198,200,202,204],{"key":20,"text":199,"correct":21},"6kN",{"key":23,"text":201,"correct":28},"8kN",{"key":25,"text":203,"correct":21},"10kN",{"key":27,"text":205,"correct":21},"12kN",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":20,"analysis":29},450970,"图所示结构，EI=常数，截面高h=常数，线膨胀系数为α，外侧环境温度降低t℃，内侧环境温度升高t℃，引起的C点竖向位移大小为（ ）。",[210,211,212,213],{"key":20,"text":20,"correct":28},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":21},{"key":27,"text":27,"correct":21},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":25,"analysis":29},450971,"下面方法中，不能减小静定结构弯矩的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":21},"在简支梁的两端增加伸臂段，使之成为伸臂梁",{"key":23,"text":221,"correct":21},"减小简支梁的跨度",{"key":25,"text":223,"correct":28},"增加简支梁的梁高，从而增大截面惯性矩",{"key":27,"text":225,"correct":21},"对于拱结构，根据荷载特征，选择合理拱轴曲线",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":27,"analysis":29},450972,"图所示体系是几何（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":21},"不变的体系",{"key":23,"text":233,"correct":21},"不变且无多余约束的体系",{"key":25,"text":235,"correct":21},"瞬变的体系",{"key":27,"text":237,"correct":28},"不变，有一个多余约束的体系",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":23,"analysis":29},450973,"图所示梁截面C右截面的弯矩为（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":21},"M／3",{"key":23,"text":245,"correct":28},"M／2",{"key":25,"text":247,"correct":21},"3M／4",{"key":27,"text":249,"correct":21},"3M／2",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":23,"analysis":29},450974,"图所示桁架有几根零杆？（ ）",[254,256,258,259],{"key":20,"text":255,"correct":21},"3",{"key":23,"text":257,"correct":28},"9",{"key":25,"text":87,"correct":21},{"key":27,"text":89,"correct":21},{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":25,"analysis":29},450975,"图所示结构为EI常数，若B点水平位移为零，则P1\u002FP2应为（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":21},"10／3",{"key":23,"text":267,"correct":21},"9／2",{"key":25,"text":269,"correct":28},"20／3",{"key":27,"text":271,"correct":21},"17／2",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":23,"analysis":29},450976,"图所示结构各杆温度均升高t℃，且已知EI和EA均为常数，线膨胀系数为α，则点D的竖向位移△Dn为（ ）。",[276,278,280],{"key":20,"text":277,"correct":21},"-αta",{"key":23,"text":279,"correct":28},"αta",{"key":25,"text":281,"correct":21},"2αta",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":25,"analysis":29},450977,"图所示结构两个状态的反力互等定理，和的量纲为（ ）。",[286,288,290,292],{"key":20,"text":287,"correct":21},"力",{"key":23,"text":289,"correct":21},"无量纲",{"key":25,"text":291,"correct":28},"力／长度",{"key":27,"text":293,"correct":21},"长度／力",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":23,"analysis":29},450978,"所示刚架支座A下移量为a，转角为α则B端竖向位移（ ）。",[298,300,302,304],{"key":20,"text":299,"correct":21},"与h、l、El均有关",{"key":23,"text":301,"correct":28},"与h、l有关，与El无关",{"key":25,"text":303,"correct":21},"与l有关，与h、El均无关",{"key":27,"text":305,"correct":21},"与EI有关，与h、l均无关",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":308,"answer":20,"analysis":29},450979,[309,311,312,314],{"key":20,"text":310,"correct":28},"不变，有两个多余约束的体系",{"key":23,"text":233,"correct":21},{"key":25,"text":313,"correct":21},"瞬变体系",{"key":27,"text":315,"correct":21},"有一个多余约束的体系",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":318,"answer":23,"analysis":29},450980,[319,321,322,323],{"key":20,"text":320,"correct":21},"可变的体系",{"key":23,"text":233,"correct":28},{"key":25,"text":235,"correct":21},{"key":27,"text":237,"correct":21},{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":23,"analysis":29},450981,"若荷载作用在静定多跨梁的基本部分上，附属部分上无荷载作用，则（ ）。",[328,330,332,334],{"key":20,"text":329,"correct":21},"基本部分和附属部分均有内力",{"key":23,"text":331,"correct":28},"基本部分有内力，附属部分无内力",{"key":25,"text":333,"correct":21},"基本部分无内力，附属部分有内力",{"key":27,"text":335,"correct":21},"不经计算无法判定",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":20,"analysis":29},450982,"图所示结构，各杆，当支座B发生图示的移动时，结点E的水平位移为（ ）。",[340,341,342,343],{"key":20,"text":20,"correct":28},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":21},{"key":27,"text":27,"correct":21},{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":20,"analysis":29},450983,"图所示结构A、B两点相对水平位移（以离开为正）为（ ）。",[348,349,350,351],{"key":20,"text":20,"correct":28},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":21},{"key":27,"text":27,"correct":21},{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":354,"answer":25,"analysis":29},450984,[355,356,357,358],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":28},{"key":27,"text":27,"correct":21},{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":20,"analysis":29},450985,"图所示梁C点竖向位移为（ ）。",[363,364,365,366],{"key":20,"text":20,"correct":28},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":21},{"key":27,"text":27,"correct":21},{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":23,"analysis":29},450986,"图体系是几何（ ）。",[371,372,373,374],{"key":20,"text":231,"correct":21},{"key":23,"text":233,"correct":28},{"key":25,"text":235,"correct":21},{"key":27,"text":237,"correct":21},{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":20,"analysis":29},450987,"在建立虚功方程时，力状态与位移状态的关系是（ ）。",[379,381,383,385],{"key":20,"text":380,"correct":28},"彼此独立无关",{"key":23,"text":382,"correct":21},"位移状态必须是由力状态产生的",{"key":25,"text":384,"correct":21},"互为因果关系",{"key":27,"text":386,"correct":21},"力状态必须是由位移状态引起的",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":27,"analysis":29},450988,"图所示桁架杆l的轴力为（ ）。",[391,392,393,394],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":21},{"key":27,"text":27,"correct":28},{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":27,"analysis":29},450989,"图所示结构取图（b）为力法基本体系，El为常数，下列哪项是错误的[A8] ?（ ）",[399,400,401,402],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":21},{"key":27,"text":27,"correct":28},{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":25,"analysis":29},450990,"图所示刚架中，Μ?c等于（ ）。",[407,409,411,413],{"key":20,"text":408,"correct":21},"2kN·m（右拉）",{"key":23,"text":410,"correct":21},"2kN·m（左拉）",{"key":25,"text":412,"correct":28},"4kN·m（右拉）",{"key":27,"text":414,"correct":21},"6kN·m（左拉）",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":20,"analysis":29},450991,"力法的基本未知力是通过变形协调条件确定的，而其余未知量是通过下列哪项条件确定的？（ ）",[419,421,423,425],{"key":20,"text":420,"correct":28},"平衡",{"key":23,"text":422,"correct":21},"物理",{"key":25,"text":424,"correct":21},"图乘",{"key":27,"text":426,"correct":21},"变形协调",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":29,"options":429,"answer":23,"analysis":29},450992,[430,431,432,433],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":28},{"key":25,"text":25,"correct":21},{"key":27,"text":27,"correct":21},{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":29,"options":436,"answer":25,"analysis":29},450993,[437,438,439,440],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":28},{"key":27,"text":27,"correct":21},{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":29,"options":443,"answer":25,"analysis":29},450994,[444,446,448,450],{"key":20,"text":445,"correct":21},"0.429，0.571",{"key":23,"text":447,"correct":21},"0.5，0.5",{"key":25,"text":449,"correct":28},"0.571，0.5",{"key":27,"text":451,"correct":21},"0.6，0.4",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":29,"options":454,"answer":25,"analysis":29},450995,[455,456,457,458],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":28},{"key":27,"text":27,"correct":21},{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":27,"analysis":29},450996,"如图所示结构的超静定次数是（ ）。",[463,465,467,469],{"key":20,"text":464,"correct":21},"33",{"key":23,"text":466,"correct":21},"34",{"key":25,"text":468,"correct":21},"35",{"key":27,"text":470,"correct":28},"36",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":23,"analysis":29},450997,"如图a所示桁架，EA为常数，取图b为力法基本体系，则力法方程系数间的关系为（ ）。",[475,477,479,481],{"key":20,"text":476,"correct":21},"δ22＜δ11，δ12＞0",{"key":23,"text":478,"correct":28},"δ22＞δ11，δ12＞0",{"key":25,"text":480,"correct":21},"δ22＜δ11，δ12＜0",{"key":27,"text":482,"correct":21},"δ22＞δ11，δ12＜0",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":27,"analysis":29},450998,"图中，用力法求解图（a）所示结构，取图（b）所示力法基本体系，则力法典型方程δ11X1+Δ1p=0中的Δ1P之值为（ ）。",[487,488,489,490],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":21},{"key":27,"text":27,"correct":28},{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":23,"analysis":29},450999,"如图所示，两跨连续梁的中间支座B及右端支座C分别产生竖向沉陷2Δ及Δ，由此引起的截面A的弯矩MAB之值为（ ）。",[495,496,497,498],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":28},{"key":25,"text":25,"correct":21},{"key":27,"text":27,"correct":21},{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":27,"analysis":29},451000,"如图所示，用力法且采用图（b）所示的基本体系计算图（a）所示梁，Δ1P为（ ）。",[503,504,505,506],{"key":20,"text":20,"correct":21},{"key":23,"text":23,"correct":21},{"key":25,"text":25,"correct":21},{"key":27,"text":27,"correct":28},[508,512,516,519,522,526],{"id":509,"name":510,"category":7,"favorite":511},256,"综合应用能力",6,{"id":513,"name":514,"category":7,"favorite":515},194,"《公安》基础知识+专业",5,{"id":517,"name":518,"category":7,"favorite":515},195,"政法干警",{"id":520,"name":521,"category":7,"favorite":515},255,"职业能力倾向测验",{"id":523,"name":524,"category":7,"favorite":525},212,"国家公务员-行政能力测试",4,{"id":527,"name":528,"category":7,"favorite":525},254,"公共基础知识"]