[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-447618":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},447618,207,2,"多选题","单件产品工序、工时定额应包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","非生产工作时间",false,{"key":16,"text":17,"correct":18},"B","作业时间",true,{"key":20,"text":21,"correct":18},"C","作业宽放时间",{"key":23,"text":24,"correct":18},"D","个人需要与休息宽放时间",{"key":26,"text":27,"correct":18},"E","准备与结束时间 确认答案","BCDE","单件产品工序、工时定额应包括：①作业时间；②作业宽放时间；③个人需要与休息宽放时间；③准备与结束时间。A项属于非定额时间的种类。",{"id":6,"name":31,"category":32,"favorite":33},"人力资源类 (电网)","公务员",0]