[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-445470":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},445470,207,1,"单选题","下列属于绩效管理系统设计前期准备工作的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设计企业层面的KPI",false,{"key":16,"text":17,"correct":18},"B","制作工作说明书",true,{"key":20,"text":21,"correct":14},"C","建立考评组织",{"key":23,"text":24,"correct":14},"D","设计绩效管理运作体系","绩效管理体系设计的前期准备工作主要有：明确企业的战略目标，进行工作分析形成工作说明书，进行岗位胜任特征模型设计。",{"id":6,"name":27,"category":28,"favorite":29},"人力资源类 (电网)","公务员",0]