[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-438682":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},438682,203,1,"单选题","作业的周转时间与该作业的执行时间比值称为（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","带权周转时间",true,{"key":16,"text":17,"correct":18},"B","响应时间",false,{"key":20,"text":21,"correct":18},"C","等待时间",{"key":23,"text":24,"correct":18},"D","运行时间","作业的周转时间与该作业的执行时间之比称为带权周转时间。",{"id":6,"name":27,"category":28,"favorite":29},"计算机 (电网)","公务员",0]