[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-436372":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},436372,203,1,"单选题","现有四级指令流水线，分别完成取指、取数、运算、传送结果4步操作。若完成上述操作的时间依次为9ns、10ns、6ns、8ns。则流水线的操作周期应设计为()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","6ns",false,{"key":16,"text":17,"correct":14},"B","8ns",{"key":19,"text":20,"correct":14},"C","9ns",{"key":22,"text":23,"correct":24},"D","10ns",true,"如果流水线每步操作时间不一样，应选最慢的一步的操作时间作为操作周期。",{"id":6,"name":27,"category":28,"favorite":29},"计算机 (电网)","公务员",0]