[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-429732":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},429732,200,1,"单选题","用动态规划求解工程线路问题时，什么样的网络问题可以转化为定步数问题求解（ ）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","任意网络",false,{"key":16,"text":17,"correct":18},"B","无回路有向网络",true,{"key":20,"text":21,"correct":14},"C","混合网络",{"key":23,"text":24,"correct":14},"D","容量网络","",{"id":6,"name":27,"category":28,"favorite":29},"管理科学与工程类 (电网)","公务员",0]