[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-420974":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},420974,197,1,"单选题","新投运或改造后的Ⅰ、Ⅱ、Ⅲ、Ⅳ类高压电能计量装置应（ ）内进行首次现场检验。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","15天",false,{"key":16,"text":17,"correct":18},"B","一个月",true,{"key":20,"text":21,"correct":14},"C","20天",{"key":23,"text":24,"correct":14},"D","二个月","",{"id":6,"name":27,"category":28,"favorite":29},"电工类 (电网)","公务员",0]