[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-420605":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},420605,197,1,"单选题","电力电缆停电时间超过试验周期的，必须做（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","交流耐压试验",false,{"key":16,"text":17,"correct":14},"B","直流耐压试验",{"key":19,"text":20,"correct":14},"C","接地电阻试验",{"key":22,"text":23,"correct":24},"D","标准预防性试验",true,"",{"id":6,"name":27,"category":28,"favorite":29},"电工类 (电网)","公务员",0]