[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-419433":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},419433,196,1,"单选题","甲公司于2012年5月接受一项产品安装任务，采用完工百分比法确认劳务收入，预计安装期为10个月，合同总收入为300万元，合同预计总成本为200万元。至2012年年底，甲公司已预收款项240万元，余款在安装完成时收回；至2012年12月31日，实际发生的成本为176万元，预计还将发生54万元，则甲公司2012年应确认的收入为()万元。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","176",false,{"key":16,"text":17,"correct":18},"B","229.57",true,{"key":20,"text":21,"correct":14},"C","264",{"key":23,"text":24,"correct":14},"D","240","甲公司2012年应确认的收入=176÷(176+54)×300-0=229.57(万元)。",{"id":6,"name":27,"category":28,"favorite":29},"财务会计类 (电网)","公务员",0]