[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-419185":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},419185,196,1,"单选题","某企业生产A产品需两道工序，第一道工序的定额工时为20小时，第二道工序的定额工时为30小时，在各个工序内在产品完工程度均为本步骤的50%，第二道工序在产品的完工程度为()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","40%",false,{"key":16,"text":17,"correct":14},"B","50%",{"key":19,"text":20,"correct":14},"C","60%",{"key":22,"text":23,"correct":24},"D","70%",true,"第二生产步骤在产品的完工程度=(20+30×50%)\u002F(20+30)×100%=70%。",{"id":6,"name":27,"category":28,"favorite":29},"财务会计类 (电网)","公务员",0]