[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-418984":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},418984,196,1,"单选题","产品成本计算不定期，一般也不存在完工产品与在产品之间费用分配问题的成本计算方法是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","平行结转分步法",false,{"key":16,"text":17,"correct":14},"B","逐步结转分步法",{"key":19,"text":20,"correct":21},"C","分批法",true,{"key":23,"text":24,"correct":14},"D","品种法","",{"id":6,"name":27,"category":28,"favorite":29},"财务会计类 (电网)","公务员",0]