[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-418809":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},418809,196,1,"单选题","运用零基预算法编制预算，需要按照费用项目的轻重缓急分析的费用项目是( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","可避免费用",false,{"key":16,"text":17,"correct":14},"B","不可避免费用",{"key":19,"text":20,"correct":21},"C","可延级费用",true,{"key":23,"text":24,"correct":14},"D","不可延缓费用","",{"id":6,"name":27,"category":28,"favorite":29},"财务会计类 (电网)","公务员",0]