[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-418376":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},418376,196,1,"单选题","下列各项中，可能会使预算期与会计期间相分离的预算方法是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","弹性预算法",false,{"key":16,"text":17,"correct":14},"B","零基预算法",{"key":19,"text":20,"correct":14},"C","增量预算法",{"key":22,"text":23,"correct":24},"D","滚动预算法",true,"",{"id":6,"name":27,"category":28,"favorite":29},"财务会计类 (电网)","公务员",0]