[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-418375":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},418375,196,1,"单选题","以历史期实际经济活动及其预算为基础，结合预算期经济活动及相关影响因素的变动情况，通过调整历史期经济活动项目及金额形成预算的预算编制方法，称为()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","弹性预算法",false,{"key":16,"text":17,"correct":14},"B","零基预算法",{"key":19,"text":20,"correct":21},"C","增量预算法",true,{"key":23,"text":24,"correct":14},"D","滚动预算法","",{"id":6,"name":27,"category":28,"favorite":29},"财务会计类 (电网)","公务员",0]