[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-412124":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},412124,192,1,"单选题","拆除工程开工前必须进行安全技术交底，下列关于安全技术交底的做法中，正确的是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","项目经理向各工总施工负责人进行安全技术交底",false,{"key":16,"text":17,"correct":14},"B","作业班组长向施工技术负责人进行安全技术交底",{"key":19,"text":20,"correct":21},"C","项目专项技术负责人向作业人员进行安全技术交底",true,{"key":23,"text":24,"correct":14},"D","项目专职安全管理人员向作业人员进行安全技术交底","",{"id":6,"name":27,"category":28,"favorite":29},"安全生产技术基础","职业资格",0]