[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-411434":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},411434,191,1,"单选题","如改变经过安全监管部门批准的工程建设项目安全设施设计，可能降低安全性能的，应经设计单位书面同意．并由生产经营单位报（ ）批准。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","企业上级部门",false,{"key":16,"text":17,"correct":14},"B","原设计单位",{"key":19,"text":20,"correct":21},"C","原批准单位",true,{"key":23,"text":24,"correct":14},"D","建设部门","",{"id":6,"name":27,"category":28,"favorite":29},"安全生产管理","职业资格",0]