[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-409292":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},409292,190,1,"单选题","依据《建设项目安全设施“三同时”监督管理暂行办法》，对已经受理的建设项目安全设施设计审查申请，安全生产监督管理部门应当自受理之日起（ ）工作日内作出是否批准的决定，并书面告知申请人。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","10个",false,{"key":16,"text":17,"correct":14},"B","15个",{"key":19,"text":20,"correct":21},"C","20个",true,{"key":23,"text":24,"correct":14},"D","30个","",{"id":6,"name":27,"category":28,"favorite":29},"安全生产法律知识","职业资格",0]