[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-409130":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},409130,190,1,"单选题","根据《建筑法》，获取施工许可证后因故不能按期开工的，建设单位应当申请延期，延期的规定是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","以两次为限，每次不超过6个月",false,{"key":16,"text":17,"correct":14},"B","以一次为限，延期不超过3个月",{"key":19,"text":20,"correct":21},"C","以两次为限，每次不超过3个月",true,{"key":23,"text":24,"correct":14},"D","以一次为限，延期不超过6个月","",{"id":6,"name":27,"category":28,"favorite":29},"安全生产法律知识","职业资格",0]