[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-409111":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},409111,190,1,"单选题","根据《建设项目安全设施“三同时”监督管理办法》，在建设项目可行性研究阶段，下列建设项目中，需要进行安全预评价的建设项目是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","省级建材重点建设项目",false,{"key":16,"text":17,"correct":18},"B","国家金属冶炼建设项目",true,{"key":20,"text":21,"correct":14},"C","省级烟草重点建设项目",{"key":23,"text":24,"correct":14},"D","国家体育场馆建设项目","",{"id":6,"name":27,"category":28,"favorite":29},"安全生产法律知识","职业资格",0]