[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":609},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,9,50,1856,[13,34,46,58,70,82,94,106,118,128,140,152,164,176,188,200,212,224,236,248,260,272,284,296,308,320,332,344,356,368,380,392,402,414,422,434,445,457,469,481,493,504,516,528,540,552,564,575,585,597],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},388609,1,"单选题","项目经理小李依据当前技术发展趋势和所掌握的技术能否支撑该项目的开发，进行 可行性研究。小李进行的可行性研究属于 （ ） 。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","经济可行性分析",false,{"key":24,"text":25,"correct":26},"B","技术可行性分析",true,{"key":28,"text":29,"correct":22},"C","运行环境可行性分析",{"key":31,"text":32,"correct":22},"D","其他方面的可行性分析","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},388610,"在招标文件要求提交投标文件截止时间至少（ ）日前，招标人可以以书面形式对已发出的招标文件进行必要的澄清或者修改",[38,40,42,44],{"key":20,"text":39,"correct":22},"10",{"key":24,"text":41,"correct":26},"15",{"key":28,"text":43,"correct":22},"20",{"key":31,"text":45,"correct":22},"30",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},388611,"以下不属于项目可行性研究内容的是：",[50,52,54,56],{"key":20,"text":51,"correct":26},"项目的详细管理计划",{"key":24,"text":53,"correct":22},"项目的风险因素及其对策",{"key":28,"text":55,"correct":22},"项目的社会影响性分析",{"key":31,"text":57,"correct":22},"项目的财务盈利能力评价",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},388612,"某企业针对“新一代网络操作系统”开发项目进行可行性论证。在论证的最初阶段，一般情况下不会涉及到 （ ） 。",[62,64,66,68],{"key":20,"text":63,"correct":22},"调研了解新一代网络操作系统的市场需求",{"key":24,"text":65,"correct":22},"分析论证是否具备相应的开发技术",{"key":28,"text":67,"correct":26},"详细估计系统开发周期",{"key":31,"text":69,"correct":22},"结合企业财务经济情况进行论证分析",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},388613,"关于项目的可行性研究，以下论述中不正确的是 （ ） 。",[74,76,78,80],{"key":20,"text":75,"correct":22},"项目的初步可行性研究和详细可行性研究的主要内容基本相同",{"key":24,"text":77,"correct":22},"初步可行性研究的结论包括四种：肯定，立即上马；肯定，进入详细可行性研究；展开专题研究；否定，项目下马",{"key":28,"text":79,"correct":26},"初步可行性研究的方法很多，如经济评论法、市场预测法、投资估算法、增量净效益法等",{"key":31,"text":81,"correct":22},"详细可行性分析的内容包含有项目的经济和社会效益分析",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},388614,"立项管理是项目管理中的一项重要内容。从项目管理的角度看，立项管理主要是解决项目的（ ）问题。",[86,88,90,92],{"key":20,"text":87,"correct":22},"技术可行性",{"key":24,"text":89,"correct":26},"组织战略符合性",{"key":28,"text":91,"correct":22},"高层偏好",{"key":31,"text":93,"correct":22},"需求收集和确认",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},388615,"以下项目的招标过程中， （ ） 的做法是正确的。",[98,100,102,104],{"key":20,"text":99,"correct":22},"某市计划投资建设大型轨道交通地铁项目，经多方专家论证，确定了项目的可行性并落实了资金来源。 由于该市的第一条地铁项目的主要控制系统是系统集成商A建设的，经过投资方和专家委员会的共同评审，确定继续由集成商A承担此地铁项目的主要控制系统建设",{"key":24,"text":101,"correct":26},"某政府采购项目，招标人编制了招标文件，由于此项目涉及政府的重要数据，因此招标文件中对投标人资质要求为具备涉密系统集成资质",{"key":28,"text":103,"correct":22},"招标人在制定招标的评分标准时，设定其中一项评标项为“内部管理”，给出的评分细则是：“好”得5分，“较好”得4分，“一般”得3分，“较差”得2分，“差”得1分",{"key":31,"text":105,"correct":22},"招标人收到投标方的标书后应该签收，并当面开启进行初审，确定提交的标书形式上是否完整",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},388616,"以下关于项目可行性研究内容的叙述， （ ） 是不正确的。",[110,112,114,116],{"key":20,"text":111,"correct":22},"技术可行性是从项目实施的技术角度，合理设计技术方案，并进行评审和评价",{"key":24,"text":113,"correct":22},"经济可行性主要是从资源配置的角度衡量项目的价值，从项目的投资及所产生的经济效益进行分析",{"key":28,"text":115,"correct":26},"可行性研究不涉及合同责任、知识产权等法律方面的可行性问题",{"key":31,"text":117,"correct":22},"社会可行性主要分析项目对社会的影响，包括法律道德、民族宗教、社会稳定性等",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},388617,"项目可行性分析是立项前的重要工作，包括技术、物资、资源、人员的可行性。在进行项目可行性分析时，需要在（ ）过程中分析人力资源的可行性。",[122,123,124,126],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":125,"correct":22},"运行环境可行分析",{"key":31,"text":127,"correct":22},"法律可行性析",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":24,"analysis":33},388618,"在可行性研究报告中，可行性研究的结论包括 （ ） 。",[132,134,136,138],{"key":20,"text":133,"correct":22},"项目的目标、规模，详细技术方案及特点，项目的建设进度计划，投资估价和资金筹措计划，项目财务和经济评价。项目综合评价结论",{"key":24,"text":135,"correct":26},"项目的目标、规模，技术方案概述及特点，项目的建设进度计划，投资估价和资金筹措计划，项目财务和经济评价。项目综合评价结论",{"key":28,"text":137,"correct":22},"项目的目标、规模，技术方案概述及特点，项目的建设进度计划，投资估价和风险分析，项目财务和经济评价。项目综合评价结论",{"key":31,"text":139,"correct":22},"项目的目标、规模，技术方案概述及特点，项目人力资源计划，投资估价和资金筹措计划，项目财务和经济评价。项目综合评价结论",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":24,"analysis":33},388619,"在我国境内进行的工程建设项目，可以不进行招标的环节是 （ ）",[144,146,148,150],{"key":20,"text":145,"correct":22},"监理",{"key":24,"text":147,"correct":26},"可研",{"key":28,"text":149,"correct":22},"勘察设计",{"key":31,"text":151,"correct":22},"施工",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":31,"analysis":33},388620,"项目论证是一个连续的过程，一般包括以下几个步骤，正确的执行顺序是（ ）。①收集并分析相关资料②明确项目范围和业主目标③拟定多种可行的实施方案并分析比较④选择最优方案进行详细论证⑤编制资金筹措计划和项目实施进度计划⑥编制项目论证报告",[156,158,160,162],{"key":20,"text":157,"correct":22},"①②③④⑤⑥",{"key":24,"text":159,"correct":22},"②①③⑤④⑥",{"key":28,"text":161,"correct":22},"①②③④⑥⑤",{"key":31,"text":163,"correct":26},"②①③④⑥⑤",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":31,"analysis":33},388621,"项目论证是指对拟实施项目技术上的先进性、适用性，经济上的合理性、盈利性，实施上的可能性、风险可控性进行全面科学的综合分析，为项目决策提供客观依据的一种技术经济研究活动。以下关于项目论证的叙述，错误的是（）。",[168,170,172,174],{"key":20,"text":169,"correct":22},"项目论证的作用之一是作为筹措资金、向银行贷款的依据",{"key":24,"text":171,"correct":22},"项目论证的内容之一是国民经济评价，通常运用影子价格、影子汇率、影子工资等工具或参数",{"key":28,"text":173,"correct":22},"数据资料是项目论证的支柱",{"key":31,"text":175,"correct":26},"项目财务评价是从项目的宏观角度判断项目或不同方案在财务上的可行性的技术经济活动",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":28,"analysis":33},388622,"系统方法论是项目评估方法论的理论基石。系统方法论的基本原则不包括（ ） 。",[180,182,184,186],{"key":20,"text":181,"correct":22},"整体性原则",{"key":24,"text":183,"correct":22},"相关性原则",{"key":28,"text":185,"correct":26},"易用性原则",{"key":31,"text":187,"correct":22},"有序性原则",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":31,"analysis":33},388623,"通常在 （ ） 任命项目经理比较合适。",[192,194,196,198],{"key":20,"text":193,"correct":22},"可研过程之前",{"key":24,"text":195,"correct":22},"签订合同之前",{"key":28,"text":197,"correct":22},"招投标之前",{"key":31,"text":199,"correct":26},"开始制订项目计划前",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":24,"analysis":33},388624,"在项目收尾阶段，召开项目总结会议，总结项目实施中的成功和尚需改进之处。属于项目管理中的 （ ） 。",[204,206,208,210],{"key":20,"text":205,"correct":22},"合同收尾",{"key":24,"text":207,"correct":26},"管理收尾",{"key":28,"text":209,"correct":22},"会议收尾",{"key":31,"text":211,"correct":22},"组织过程资产收尾",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":20,"analysis":33},388625,"（ ） 不属于项目监控工作的成果。",[216,218,220,222],{"key":20,"text":217,"correct":26},"进度预测",{"key":24,"text":219,"correct":22},"项目文件更新",{"key":28,"text":221,"correct":22},"工作绩效报告",{"key":31,"text":223,"correct":22},"项目管理计划更新",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":28,"analysis":33},388626,"甲公司拟收购乙公司以扩充自身的业务范围，张工被甲公司指定为此次收购的项目经理，首席财务官给了张工一份项目章程，介绍这次收购将如何改进公司产品的市场渗透和打开一条新的销售渠道。张工使用这份项目章程，定义了可交付成果和主要项目目标，包括成本、进度和质量测量指标。则张工准备的是（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":22},"范围管理计划",{"key":24,"text":231,"correct":22},"项目计划",{"key":28,"text":233,"correct":26},"范围说明书",{"key":31,"text":235,"correct":22},"工作分解结构",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},388627,"小王正在负责为一家水厂开发MIS系统，虽然他没有管理类似项目的经验，但其团队的一名成员做过类似的项目。该成员的这些经历为准确估算项目的成本做出了贡献，这一点对实现赢利很有帮助。上述情况表明 （ ） 。",[240,242,244,246],{"key":20,"text":241,"correct":22},"专业成本建议总是需要的",{"key":24,"text":243,"correct":26},"团队里每个项目干系人都可能具有对制订项目管理计划有用的技能和知识",{"key":28,"text":245,"correct":22},"参数模型应该与专家的判断一起用，作为一次性付款合同理想的成本估计方法",{"key":31,"text":247,"correct":22},"一个人要提供精确的信息，并不一定要知道当地的环境等情况",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":24,"analysis":33},388628,"（）反映了信息系统集成项目的技术过程和管理过程的正确顺序。",[252,254,256,258],{"key":20,"text":253,"correct":22},"制定业务发展计划、实施项目、项目需求分析",{"key":24,"text":255,"correct":26},"制定业务发展计划、项目需求分析、制定项目管理计划",{"key":28,"text":257,"correct":22},"制定业务发展计划、制定项目管理计划、项目需求分析",{"key":31,"text":259,"correct":22},"制定项目管理计划、项目需求分析、制定业务发展计划",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":28,"analysis":33},388629,"项目章程应在项目计划之前公布，通常项目章程由（ ）发布。",[264,266,268,270],{"key":20,"text":265,"correct":22},"项目经理",{"key":24,"text":267,"correct":22},"项目调研小组",{"key":28,"text":269,"correct":26},"项目发起人",{"key":31,"text":271,"correct":22},"项目监理",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":20,"analysis":33},388630,"项目章程应在项目计划之前公布。以下关于项目章程的叙述中，不正确的是：（ ）。",[276,278,280,282],{"key":20,"text":277,"correct":26},"项目章程不是正式批准的项目文档",{"key":24,"text":279,"correct":22},"项目章程包含产品需求和产品的商业需求",{"key":28,"text":281,"correct":22},"项目章程将项目与执行组织的日常运营联系起来",{"key":31,"text":283,"correct":22},"项目章程为项目经理使用组织资源进行项目活动提供授权",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":24,"analysis":33},388631,"项目章程的制定过程主要关注记录建设方的 （ ） 、项目立项的理由与背景、对客户需求的现有理解和满足这些需求的新产品、服务或成果。",[288,290,292,294],{"key":20,"text":289,"correct":22},"合同规定",{"key":24,"text":291,"correct":26},"商业需求",{"key":28,"text":293,"correct":22},"功能需求",{"key":31,"text":295,"correct":22},"产品需求",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":20,"analysis":33},388632,"项目整体评估是把项目看成一个整体，权衡各种要素之间关系的评估，整体性体现在对 （ ） 等方面的集成",[300,302,304,306],{"key":20,"text":301,"correct":26},"经济、技术运行、环境、风险",{"key":24,"text":303,"correct":22},"沟通、计划、变更",{"key":28,"text":305,"correct":22},"资源、管理、人员",{"key":31,"text":307,"correct":22},"文档、说明、软件、硬件",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":28,"analysis":33},388633,"下列关于项目整体管理的表述中，正确的是 （ ） 。",[312,314,316,318],{"key":20,"text":313,"correct":22},"项目绩效评价就是指项目建成时的成果评价",{"key":24,"text":315,"correct":22},"整体管理强调的是管理的权威性，沟通只能作为辅助手段",{"key":28,"text":317,"correct":26},"工作绩效信息是形成绩效报告的重要依据",{"key":31,"text":319,"correct":22},"项目绩效评价就是对项目经济效益的评价",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":28,"analysis":33},388634,"项目整体管理要综合考虑项目各个相关过程，围绕整体管理特点，以下说法中，（ ）是不正确的。",[324,326,328,330],{"key":20,"text":325,"correct":22},"项目的各个目标和方案可能是冲突的，项目经理要进行统一权衡",{"key":24,"text":327,"correct":22},"项目经理要解决好过程之间的重叠部分的职责问题",{"key":28,"text":329,"correct":26},"对项目中可能不需要的过程，项目经理就不用考虑",{"key":31,"text":331,"correct":22},"项目经理要把项目的可交付物与公司的运营结合起来",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":24,"analysis":33},388635,"某系统集成商现正致力于过程改进，打算为过去的项目建立历史档案，现阶段完成该工作的最好方法是（）",[336,338,340,342],{"key":20,"text":337,"correct":22},"建立项目计划",{"key":24,"text":339,"correct":26},"总结经验教训",{"key":28,"text":341,"correct":22},"绘制网络图",{"key":31,"text":343,"correct":22},"制定项目状态报告",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":20,"analysis":33},388636,"项目进入到执行阶段后，项目经理、项目组成员为了完成项目范围说明书定义的工作，还需执行的是（ ） 。 （1）实施己批准的预防措施以降低潜在负面结果出现的可能性（2）管理已分配到项目或阶段中的项目团队成员（3）为项目选择生命周期模型（4）监管项目总投入情况（5）管理供应商",[348,350,352,354],{"key":20,"text":349,"correct":26},"（1）（2）（5）",{"key":24,"text":351,"correct":22},"（1）（2）（3）（4）",{"key":28,"text":353,"correct":22},"（1）（2）（4）（5）",{"key":31,"text":355,"correct":22},"（1）（2）（3）（4）（5）",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":20,"analysis":33},388637,"组织过程资产在项目管理中扮演很重要的角色， （ ） 不属于组织过程资产。",[360,362,364,366],{"key":20,"text":361,"correct":26},"基础设施",{"key":24,"text":363,"correct":22},"组织的经验学习系统",{"key":28,"text":365,"correct":22},"产品组件标准",{"key":31,"text":367,"correct":22},"招聘、培养、使用和解聘技术人员的指导方针",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":20,"analysis":33},388638,"（ ）是正式批准一个项目的文档，或者是批准现行项目是否进入下一阶段的文档。",[372,374,376,378],{"key":20,"text":373,"correct":26},"项目章程",{"key":24,"text":375,"correct":22},"项目合同",{"key":28,"text":377,"correct":22},"项目启动文档",{"key":31,"text":379,"correct":22},"项目工作说明书",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":20,"analysis":33},388639,"在项目计划阶段，项目计划方法论是用来指导项目团队制定项目计划的一种结构化方法。 （）属于方法论的一部分",[384,386,388,390],{"key":20,"text":385,"correct":26},"标准格式和模板",{"key":24,"text":387,"correct":22},"上层管理者的介入",{"key":28,"text":389,"correct":22},"职能工作的授权",{"key":31,"text":391,"correct":22},"项目干系人的技能",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":20,"analysis":33},388640,"制订项目管理计划的输入包含____",[396,397,398,400],{"key":20,"text":373,"correct":26},{"key":24,"text":235,"correct":22},{"key":28,"text":399,"correct":22},"风险管理计划",{"key":31,"text":401,"correct":22},"质量计划",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":31,"analysis":33},388641,"发布项目章程，标志着项目的正式启动。以下围绕项目章程的叙述中，不正确的是：",[406,408,410,412],{"key":20,"text":407,"correct":22},"制定项目章程的工具和技术包括专家判断",{"key":24,"text":409,"correct":22},"项目章程要为项目经理提供授权，方便其使用组织资源进行项目活动",{"key":28,"text":411,"correct":22},"项目章程应当由项目发起人发布",{"key":31,"text":413,"correct":26},"项目经理应在制定项目章程后再任命",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":28,"analysis":33},388642,"项目整体管理要综合考虑项目各个相关过程，围绕整体管理特点，以下说法中，（ ） 是不正确的。",[418,419,420,421],{"key":20,"text":325,"correct":22},{"key":24,"text":327,"correct":22},{"key":28,"text":329,"correct":26},{"key":31,"text":331,"correct":22},{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":28,"analysis":33},388643,"项目经理在编制项目管理计划时，应：",[426,428,430,432],{"key":20,"text":427,"correct":22},"越简单越好",{"key":24,"text":429,"correct":22},"越详细越好",{"key":28,"text":431,"correct":26},"逐步细化",{"key":31,"text":433,"correct":22},"按照公司的模板编制，不能变更",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":20,"analysis":33},388644,"项目计划方法是在项目计划阶段，用来指导项目团队制订计划的一种结构化方法。______是这种方法的例子",[438,440,442,443],{"key":20,"text":439,"correct":26},"工作指南和模板",{"key":24,"text":441,"correct":22},"上层管理介入",{"key":28,"text":389,"correct":22},{"key":31,"text":444,"correct":22},"项目干系人的技能分析",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":20,"analysis":33},388645,"以下关于项目管理计划编制的理解中，正确的是（ ） 。",[449,451,453,455],{"key":20,"text":450,"correct":26},"项目经理应组织并主要参与项目管理计划的编制，但不应独立编制",{"key":24,"text":452,"correct":22},"项目管理计划的编制不能采用迭代的方法",{"key":28,"text":454,"correct":22},"让项目干系人参与项目计划的编制，增加了沟通成本，应尽量避免",{"key":31,"text":456,"correct":22},"项目管理计划不能是概括的，必须是详细、具体的",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":24,"analysis":33},388646,"下面针对项目整体变更控制过程的叙述不正确的是 （ ） 。",[461,463,465,467],{"key":20,"text":462,"correct":22},"配置管理的相关活动贯穿整体变更控制始终",{"key":24,"text":464,"correct":26},"整体变更控制过程主要体现在确定项目交付成果阶段",{"key":28,"text":466,"correct":22},"整体变更控制过程贯穿于项目的始终",{"key":31,"text":468,"correct":22},"整体变更控制的结果可能引起项目范围、项目管理计划、项目交付成果的调整",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":20,"analysis":33},388647,"《项目质量管理计划》经评审后进入批准流程。由于项目前期已拖期两周，该文件应尽快报监理审批，那么对于该文件的批准活动，正确的是 （ ） 。",[473,475,477,479],{"key":20,"text":474,"correct":26},"由建设方技术总监对内容、范围审核后送交监理方批准",{"key":24,"text":476,"correct":22},"由承建方项目经理对内容、范围审核后送交监理方批准",{"key":28,"text":478,"correct":22},"由监理工程师对内容、范围审核后送交总监理工程师批准",{"key":31,"text":480,"correct":22},"先和批准人打声招呼，走监理批准流程，事后再补发签字",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":31,"analysis":33},388648,"每一个项目阶段都以一个或数个 （ ） 为其标志。",[485,487,489,491],{"key":20,"text":486,"correct":22},"文档",{"key":24,"text":488,"correct":22},"产品",{"key":28,"text":490,"correct":22},"阶段总结",{"key":31,"text":492,"correct":26},"可交付成果的完成",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":24,"analysis":33},388649,"经项目各有关干系人同意的 _____ 就是项目的基准，为项目的执行、监控和变更提供了基础",[497,499,501,502],{"key":20,"text":498,"correct":22},"项目合同书",{"key":24,"text":500,"correct":26},"项目管理计划",{"key":28,"text":373,"correct":22},{"key":31,"text":503,"correct":22},"项目范围说明书",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":28,"analysis":33},388650,"以下关于项目整体管理的叙述，正确的是 （ ） 。",[508,510,512,514],{"key":20,"text":509,"correct":22},"项目整体管理把各个管理过程看成是完全独立的",{"key":24,"text":511,"correct":22},"项目整体管理过程是线性的过程",{"key":28,"text":513,"correct":26},"项目整体管理是对项目管理过程组中的不同过程和活动进行识别、定义、整合、统一和协调的过程",{"key":31,"text":515,"correct":22},"项目整体管理不涉及成本估算过程",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":31,"analysis":33},388651,"项目结束后要进行项目绩效审计，项目绩效审计不包括 （ ） 。",[520,522,524,526],{"key":20,"text":521,"correct":22},"经济审计",{"key":24,"text":523,"correct":22},"效率审计",{"key":28,"text":525,"correct":22},"效果审计",{"key":31,"text":527,"correct":26},"风险审计",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":24,"analysis":33},388652,"关于项目目标的描述，不正确的是： （ ） 。",[532,534,536,538],{"key":20,"text":533,"correct":22},"项目可以有一个目标，也可以有多个目标",{"key":24,"text":535,"correct":26},"项目目标可以量化，也可以不量化",{"key":28,"text":537,"correct":22},"项目的成果目标与约束目标可能会冲突",{"key":31,"text":539,"correct":22},"项目目标应该是具体的、可实现的",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":31,"analysis":33},388653,"绩效报告一般不包括 （ ） 方面的内容。",[544,546,548,550],{"key":20,"text":545,"correct":22},"项目的进展情况",{"key":24,"text":547,"correct":22},"成本支出情况",{"key":28,"text":549,"correct":22},"项目存在的问题及解决方案",{"key":31,"text":551,"correct":26},"干系人沟通需求",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":20,"analysis":33},388654,"现代项目管理过程中，一般会将项目的进度、成本、质量和范围作为项目管理的目标，这体现了项目管理的 （ ） 特点。",[556,558,560,562],{"key":20,"text":557,"correct":26},"多目标性",{"key":24,"text":559,"correct":22},"层次性",{"key":28,"text":561,"correct":22},"系统性",{"key":31,"text":563,"correct":22},"优先性",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":20,"analysis":33},388655,"在项目计划阶段由于各种约束条件搞不清晰，所以在计划过程中会遵循基本的方法论以指导项目计划的规定（ ） 属于项目管理方法论的一部分。",[568,570,572,573],{"key":20,"text":569,"correct":26},"计划的标准格式和模板",{"key":24,"text":571,"correct":22},"项目相关授权",{"key":28,"text":391,"correct":22},{"key":31,"text":574,"correct":22},"初步范围说明书",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":31,"analysis":33},388656,"项目经理张工带领团队编制项目管理计划， （ ） 不属于编制项目管理计划过程的依据。",[579,580,582,584],{"key":20,"text":373,"correct":22},{"key":24,"text":581,"correct":22},"事业环境因素",{"key":28,"text":583,"correct":22},"组织过程资产",{"key":31,"text":235,"correct":26},{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":31,"analysis":33},388657,"（ ） 不是影响制定项目章程过程的环境和组织因素。",[589,591,593,595],{"key":20,"text":590,"correct":22},"政府或行业标准",{"key":24,"text":592,"correct":22},"组织的基础设施",{"key":28,"text":594,"correct":22},"市场条件",{"key":31,"text":596,"correct":26},"合同",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":20,"analysis":33},388658,"（ ） 不属于项目章程的组成内容。",[601,603,605,607],{"key":20,"text":602,"correct":26},"工作说明书",{"key":24,"text":604,"correct":22},"指定项目经理并授权",{"key":28,"text":606,"correct":22},"项目概算",{"key":31,"text":608,"correct":22},"项目需求",[610,614,617,620,623,626],{"id":611,"name":612,"category":7,"favorite":613},136,"法律职业试卷二(客观题 )",2,{"id":615,"name":616,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":618,"name":619,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":621,"name":622,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":624,"name":625,"category":7,"favorite":8},28,"安全工程师",{"id":627,"name":628,"category":7,"favorite":8},112,"安全生产法律知识"]