[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":612},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,8,50,1856,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,509,521,533,545,556,568,579,588,600],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},388559,1,"单选题","（）按时间顺序统计被发现缺陷的数量分布。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","缺陷分布密度",false,{"key":24,"text":25,"correct":22},"B","缺陷修改质量",{"key":27,"text":28,"correct":29},"C","缺陷趋势分析",true,{"key":31,"text":32,"correct":22},"D","缺陷存活时间","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},388560,"（）不是量化管理的基本要素。",[38,40,42,44],{"key":20,"text":39,"correct":22},"对预测有信心（能够准确地预测项目在多大程度上满足其质量与过程性能目标的能力）",{"key":24,"text":41,"correct":22},"理解在过程性能中遇到的偏差本质和程度，并且察觉项目的实际绩效何时可能不足以达成项目的质量与过程性能目标",{"key":27,"text":43,"correct":22},"基于对可预测过程性能的需要，选择将使用统计与其他量化技术管理的子过程",{"key":31,"text":45,"correct":29},"建立并维护项目的功能与成本过程目标",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},388561,"量化管理项目涉及使用统计与其他量化技术执行以下活动,但不包括（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"使用统计与其他的量化技术监督所选子过程",{"key":24,"text":53,"correct":22},"确定项目的质量与过程性能目标是否正在得到满足",{"key":27,"text":55,"correct":22},"对所选问题执行根本原因分析以解决不足",{"key":31,"text":57,"correct":29},"确定项目是否制订了量化的计划",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},388562,"准备量化管理主要工作是进行量化管理的准备工作。准备活动不包括（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"建立项目的量化目标",{"key":24,"text":65,"correct":22},"组成有助于达成那些目标的项目已定义过程",{"key":27,"text":67,"correct":29},"选择对达成目标起作用的过程与属性",{"key":31,"text":69,"correct":22},"选择支持量化管理的度量项与分析技术",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},388563,"关于招投标的描述，不正确的是:（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"招标人采用邀请招标方式的，应当向三个以上具备承担项目的能力、资信良好的特定法人或者其他组织发出投标邀请书",{"key":24,"text":77,"correct":22},"招标人对已发出的招标文件进行必要的澄清或者修改的，应当在招标文件要求提交投标文件截止时间至少十五日前，以书面形式通知所有招标文件接受人",{"key":27,"text":79,"correct":22},"投标人在招标文件要求提交投标文件的截止时间前，可以补充、修改或者撤回已提交的投标文件，并书面通知招标人",{"key":31,"text":81,"correct":29},"依法必须进行招标的项目，其评标委员会由招标人的代表和有实力经济等方面的专家组成，成员人数为五人以上单数，其中技术、经济等方面的人员不得少于成员总数的一半",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},388564,"根据GB\u002FT 11457 2006《软件工程术语》，由某人、某小组或借助某种工具对源代码进行的独立的审查，以验其是否符合软件设计文件和程序设计标准，称为（）",[86,88,90,92],{"key":20,"text":87,"correct":22},"桌面检查",{"key":24,"text":89,"correct":22},"代码评审",{"key":27,"text":91,"correct":22},"代码走查",{"key":31,"text":93,"correct":29},"代码审计",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},388565,"根据GB\u002FT 16260.12006《软件工程产品质量》，软件产品使用质量特性中的可靠性，是指与软件在规定的段时间内和规定的条件下维持其性能水平的一组软件属性，（）不属于可靠性质量特性。",[98,100,102,104],{"key":20,"text":99,"correct":29},"安全性",{"key":24,"text":101,"correct":22},"成熟性",{"key":27,"text":103,"correct":22},"容错性",{"key":31,"text":105,"correct":22},"可恢复性",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},388566,"战略管理包含3个层次， （ ） 不属于战略管理的层次。",[110,112,114,116],{"key":20,"text":111,"correct":22},"目标层",{"key":24,"text":113,"correct":29},"规划层",{"key":27,"text":115,"correct":22},"方针层",{"key":31,"text":117,"correct":22},"行为层",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},388567,"某软件系统交付后，开发人员发现系统的性能可以进一步优化和提升，由此产生的软件维护属于（ ） 。",[122,124,126,128],{"key":20,"text":123,"correct":22},"更正性维护",{"key":24,"text":125,"correct":22},"适应性维护",{"key":27,"text":127,"correct":29},"完善性维护",{"key":31,"text":129,"correct":22},"预防性维护",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},388568,"某大型种植企业今年要建设一个构建在公有云上的企业招投标信息系统，项目经理称现在正在进行软件采购，按照信息系统的生命周期5阶段划分法，当前处于 （ ） 阶段。",[134,136,138,140],{"key":20,"text":135,"correct":22},"系统规划",{"key":24,"text":137,"correct":22},"系统分析",{"key":27,"text":139,"correct":22},"系统设计",{"key":31,"text":141,"correct":29},"系统实施",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},388569,"（ ） 不属于项目经理的岗位职责。",[146,148,150,152],{"key":20,"text":147,"correct":29},"为严格控制项目成本，可不全面执行所在单位的技术规范标准",{"key":24,"text":149,"correct":22},"对项目的全生命周期进行有效控制，确保项目质量和工期",{"key":27,"text":151,"correct":22},"在工作中主动采用项目管理理念和方法",{"key":31,"text":153,"correct":22},"以合作和职业化方式与团队和项目干系人打交道",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},388570,"存储转发是网络传输的一种形式，其问题是不确定在每个结点上的延迟时间。克服该问题最有效的方式是（ ） 。",[158,160,162,164],{"key":20,"text":159,"correct":22},"设计更有效的网络缓冲区分配",{"key":24,"text":161,"correct":22},"设置更大的缓冲区",{"key":27,"text":163,"correct":29},"提高传输介质的传输能力",{"key":31,"text":165,"correct":22},"减少分组的长度",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},388571,"（ ） 不是V模型的特点。",[170,172,174,176],{"key":20,"text":171,"correct":22},"体现了开发和测试同等重要的思想",{"key":24,"text":173,"correct":22},"测试是开发生命周期中的阶段",{"key":27,"text":175,"correct":22},"针对每个开发阶段，都有一个测试级别与之相对应",{"key":31,"text":177,"correct":29},"适用于用户需求不明确或动态变化的情形",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},388572,"组织过程资产在项目管理中扮演很重要的角色， （ ） 不属于组织过程资产。",[182,184,186,188],{"key":20,"text":183,"correct":29},"基础设施",{"key":24,"text":185,"correct":22},"组织的经验学习系统",{"key":27,"text":187,"correct":22},"产品组件标准",{"key":31,"text":189,"correct":22},"招聘、培养、使用和解聘技术人员的指导方针",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},388573,"信息系统集成项目完成验收后要进行一个综合性的项目后评估，评估的内容一般包括 （ ） 。",[194,196,198,200],{"key":20,"text":195,"correct":22},"系统目标评价，系统质量评价，系统技术评价，系统可持续评价",{"key":24,"text":197,"correct":22},"系统社会效益评价，系统过程评价，系统技术评价，系统可用性评价",{"key":27,"text":199,"correct":29},"系统目标评价，系统过程评价，系统效益评价，系统可持续性评价",{"key":31,"text":201,"correct":22},"系统责任评价，系统环境影响评价，系统效益评分，系统可持续性评价",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},388574,"某公司准备将运行在本地局域网上的CRM系统迁移到集团云平台上并做适当的功能扩展，从信息系统生命周期的角度看，该CRM系统处于 （ ） 阶段。",[206,208,210,212],{"key":20,"text":207,"correct":22},"立项",{"key":24,"text":209,"correct":22},"开发",{"key":27,"text":211,"correct":29},"运维",{"key":31,"text":213,"correct":22},"消亡",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},388575,"以下关于项目章程的概述中，正确的是 （） 。",[218,220,222,224],{"key":20,"text":219,"correct":22},"项目章程与合同内容是一致的",{"key":24,"text":221,"correct":22},"项目章程要由项目经理发布",{"key":27,"text":223,"correct":29},"项目章程要明确项目在组织中的地位",{"key":31,"text":225,"correct":22},"项目章程就是一个程序文件",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":27,"analysis":33},388576,"系统方法论是项目评估方法论的理论基石。系统方法论的基本原则不包括 （ ）",[230,232,234,236],{"key":20,"text":231,"correct":22},"整体性原则",{"key":24,"text":233,"correct":22},"相关性原则",{"key":27,"text":235,"correct":29},"易用性原则",{"key":31,"text":237,"correct":22},"有序性原则",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},388577,"某系统开发项目邀请第三方进行项目评估， （ ） 不是项目评估的依据。",[242,244,246,248],{"key":20,"text":243,"correct":22},"项目建议书及其批准文件",{"key":24,"text":245,"correct":22},"项目可行性研究报告",{"key":27,"text":247,"correct":22},"报送单位的申请报告及主管部门的初审意见",{"key":31,"text":249,"correct":29},"项目变更管理策略",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},388578,"在项目计划阶段由于各种约束条件搞不清晰，所以在计划过程中会遵循基本的方法论以指导项目计划的规定 （ ） 属于项目管理方法论的一部分。",[254,256,258,260],{"key":20,"text":255,"correct":29},"计划的标准格式和模板",{"key":24,"text":257,"correct":22},"项目相关授权",{"key":27,"text":259,"correct":22},"项目干系人的技能",{"key":31,"text":261,"correct":22},"初步范围说明书",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},388579,"项目工作说明书是对项目所需要提供的产品、成果或服务的描述。其内容一般不包括 （ ） 。",[266,268,270,272],{"key":20,"text":267,"correct":22},"业务要求",{"key":24,"text":269,"correct":22},"产品范围描述",{"key":27,"text":271,"correct":22},"项目目标",{"key":31,"text":273,"correct":29},"技术可行性分析",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":31,"analysis":33},388580,"承建方的立项管理与建设方的立项管理相比，更加关注 ，以保证在招投标过程中获得与竞争对手的比较优势。",[278,280,282,284],{"key":20,"text":279,"correct":22},"客户关系",{"key":24,"text":281,"correct":22},"项目采购管理过程",{"key":27,"text":283,"correct":22},"项目的市场需求",{"key":31,"text":285,"correct":29},"组织资源与项目的匹配程度",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":27,"analysis":33},388581,"自招标文件开始发出之日起至提交投标文件截止之日止，最短不得少于（ ）日",[290,292,294,296],{"key":20,"text":291,"correct":22},"10",{"key":24,"text":293,"correct":22},"15",{"key":27,"text":295,"correct":29},"20",{"key":31,"text":297,"correct":22},"30",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":27,"analysis":33},388582,"有关可行性研究的叙述，中错误的是 （ ）",[302,304,306,308],{"key":20,"text":303,"correct":22},"信息系统项目开发的可行性研究要从可能性、效益性和必要性入手",{"key":24,"text":305,"correct":22},"可行性研究要遵守科学性和客观性原则",{"key":27,"text":307,"correct":29},"信息系统项目的可行性研究，应对项目采用的技术、所处的环境进行全面的评价",{"key":31,"text":309,"correct":22},"项目可行性研究可采用投资估算法、增量净效益法等方法",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":27,"analysis":33},388583,"项目论证通过对实施方案的工艺技术、产品、原料、未来的市场需求与供应情况以及项目的投资与收益情况的分析，从而得出各种方案的优劣以及在实施技术上是否可行，经济上是否合算等信息供决策参考。项目论证的作用不包括：（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"确定项目是否实施的依据",{"key":24,"text":317,"correct":22},"编制计划设计、采购、施工及机构设置、资源配置的依据",{"key":27,"text":319,"correct":29},"有效避免风险的发生，保证项目的效率",{"key":31,"text":321,"correct":22},"筹措资金、向银行贷款的依据",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":27,"analysis":33},388584,"项目可行性研究阶段的项目论证和项目评估的关系是（ ） 。",[326,328,330,332],{"key":20,"text":327,"correct":22},"一般先进行项目评估，再进行项目论证。",{"key":24,"text":329,"correct":22},"项目论证和项目评估都是立项阶段必不可少的环节",{"key":27,"text":331,"correct":29},"项目评估是在项目论证的基础上，由第三方开展的判断项目是否可行的一个评估过程",{"key":31,"text":333,"correct":22},"项目论证是给出项目的实施方案，项目评估是对实施方案的量化和决策",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},388585,"建设方在进行项目评估的时候，根据项目的类型不同，所采用的评估方法也不同。如果使用总量评估法，其难点是（）",[338,340,342,344],{"key":20,"text":339,"correct":22},"如何准确确定新增投入资金的经济效果",{"key":24,"text":341,"correct":29},"确定原有固定资产重估值",{"key":27,"text":343,"correct":22},"评价追加投资的经济效果",{"key":31,"text":345,"correct":22},"确定原有固定资产对项目的影响",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":31,"analysis":33},388586,"标前会议也称为投标预备会，是招标人按投标须知规定的时间和地点召开的会议。以下关于标前会议有关文档的说法中，错误的是 （ ） 。",[350,352,354,356],{"key":20,"text":351,"correct":22},"会议纪要应对书面形式发给获得投标文件的投标人",{"key":24,"text":353,"correct":22},"会议纪要和答复函件形成招标文件的补充文件",{"key":27,"text":355,"correct":22},"补充文件与招标文件具有同等法律效力",{"key":31,"text":357,"correct":29},"会议纪要必须要说明相关问题的来源",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":27,"analysis":33},388587,"某立项负责人编制了一份ERP开发项目的详细可行性研究报告，目录如下：①概述②需求确定③现有资源④技术方案⑤进度计划⑥项目组织⑦效益分析⑧协作方式⑨结论。该报告中欠缺的必要内容为 （ ） 。",[362,364,366,368],{"key":20,"text":363,"correct":22},"应用方案",{"key":24,"text":365,"correct":22},"质量计划",{"key":27,"text":367,"correct":29},"投资估算",{"key":31,"text":369,"correct":22},"项目评估原则",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":31,"analysis":33},388588,"某公司采用邀请招标的方式选择承建单位，实施过程中发生了如下事件：① 该公司向3家单位发出招标邀请函，其中包括该公司的股东公司；② 该公司8月1日发出邀请函，要求对方在8月16日提交投标书；③ 该公司外聘了1名法律专家，连同公司CIO、总经理和党委书记组建了评标委员会；④ 该公司的招标书中公开了项目标底。根据上述情况，下面说法中，正确的是 （ ） 。",[374,376,378,380],{"key":20,"text":375,"correct":22},"该公司的股东公司参加投标不符合招投标法规",{"key":24,"text":377,"correct":22},"该公司拟订的投标截止日期符合招投标法规",{"key":27,"text":379,"correct":22},"评标委员会的组成不符合招投标法规",{"key":31,"text":381,"correct":29},"招标书中不准公开项目标底",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":31,"analysis":33},388589,"公司的小张正在准备一份关于甲项目的标书。标书中一般不包括（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":22},"投标书、投标报价一览表、分项一览表",{"key":24,"text":389,"correct":22},"公司的营业执照副本复印件加盖公章及其他相关证件",{"key":27,"text":391,"correct":22},"公司相关的技术资料",{"key":31,"text":393,"correct":29},"甲项目需求合理性分析",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},388590,"可行性研究的程序是 （ ） 。",[398,400,402,404],{"key":20,"text":399,"correct":29},"机会研究、初步可行性研究、可行性研究评估",{"key":24,"text":401,"correct":22},"初步可行性研究、机会研究、可行性研究",{"key":27,"text":403,"correct":22},"机会研究、可行性研究评估、详细可行性研究",{"key":31,"text":405,"correct":22},"可行性研究评估、初步可行性研究、详细可行性研究",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":27,"analysis":33},388591,"（）是承建方项目立项的第一步，其目的在于选择投资机会、鉴别投资方向。",[410,412,414,416],{"key":20,"text":411,"correct":22},"项目论证",{"key":24,"text":413,"correct":22},"项目评估",{"key":27,"text":415,"correct":29},"项目识别",{"key":31,"text":417,"correct":22},"项目可行性分析",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":27,"analysis":33},388592,"制定合理的实施进度计划、设计合理的组织结构、选择经验丰富的管理人员、建立良好的协作关系、制定合适的培训计划等内容属于信息系统集成项目的可行性研究中 （ ） 研究的内容。",[422,424,426,428],{"key":20,"text":423,"correct":22},"经济及风险可行性",{"key":24,"text":425,"correct":22},"社会可行性",{"key":27,"text":427,"correct":29},"组织可行性",{"key":31,"text":429,"correct":22},"财务可行性",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":27,"analysis":33},388593,"招标确定招标人后，实施合同内注明的合同价款应为 （ ） 。",[434,436,438,440],{"key":20,"text":435,"correct":22},"评标委员会算出的评标价",{"key":24,"text":437,"correct":22},"招标人编制的预算价",{"key":27,"text":439,"correct":29},"中标人的投标价",{"key":31,"text":441,"correct":22},"所有投标人的价格平均值",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},388594,"某政府公开招标项目，在编制了招标文件并发布了招标公告后，招标人应随即 （ ） 。",[446,448,450,452],{"key":20,"text":447,"correct":22},"组织专家对招标文件进行评审",{"key":24,"text":449,"correct":29},"出售招标文件，对潜在招标人资格预审",{"key":27,"text":451,"correct":22},"接受参与投标人的投标书",{"key":31,"text":453,"correct":22},"由评标委员会对投标文件进行预审",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":20,"analysis":33},388595,"以下关于项目评估的叙述中， （ ） 是正确的。",[458,460,462,464],{"key":20,"text":459,"correct":29},"项目评估的最终成果是项目评估报告",{"key":24,"text":461,"correct":22},"项目评估在项目可行性研究之前进行",{"key":27,"text":463,"correct":22},"项目建议书作为项目评估的唯一依据",{"key":31,"text":465,"correct":22},"项目评估可由项目申请者自行完成",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":27,"analysis":33},388596,"机会研究、初步可行性研究、详细可行性研究、评估与决策是项目前期的四个阶段，在实际工作中，依据项目的规模和繁简程度，其中可以省略的阶段是 （ ） 。",[470,472,474,476],{"key":20,"text":471,"correct":22},"详细可行性研究、评估与决策",{"key":24,"text":473,"correct":22},"初步可行性研究、详细可行性研究",{"key":27,"text":475,"correct":29},"机会研究、初步可行性研究",{"key":31,"text":477,"correct":22},"机会研究、评估与决策",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":24,"analysis":33},388597,"某项目的可行性报告中有如下描述：“……为了规避风险，采用模块化开发的方法，即每个模块可以单独开发与销售，放到整个系统中又可以与其他模块协同工作，能够有效降低开发成本与风险……项目采用面向对象的、模块化的建模与开发方法，主体采用B\u002FS结构，使用Java语言开发，技术手段成熟……开发出的系统可以提供较好的平台扩展性，能够有效推动项目成果的产业化，具有较好的市场前景……项目运行严格执行采购招投标制，深入贯彻《国有企业物资采购管理暂行规定》，进一步堵塞管理漏洞……”这段描述中没有涉及的是（ ） 。",[482,484,486,488],{"key":20,"text":483,"correct":22},"技术可行性",{"key":24,"text":485,"correct":29},"运行环境可行性",{"key":27,"text":487,"correct":22},"风险因素及对策",{"key":31,"text":489,"correct":22},"经济可行性",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":20,"analysis":33},388598,"辅助（功能）研究是项目可行性研究中的一项重要内容。以下叙述中，正确的是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":29},"辅助（功能）研究只包括项目的某一方面，而不是项目的所有方面",{"key":24,"text":497,"correct":22},"辅助（功能）研究只能针对项目的初步可行性研究内容进行辅助的说明",{"key":27,"text":499,"correct":22},"辅助（功能）研究只涉及项目的非关键部分的研究",{"key":31,"text":501,"correct":22},"辅助（功能）研究的费用与项目可行性研究的费用无关",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":504,"answer":27,"analysis":33},388599,[505,506,507,508],{"key":20,"text":471,"correct":22},{"key":24,"text":473,"correct":22},{"key":27,"text":475,"correct":29},{"key":31,"text":477,"correct":22},{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":24,"analysis":33},388600,"某信息系统项目最终完成的可行性研究报告的主要内容包括以下部分：①项目背景和概述；②市场前景分析；③运行环境可行性分析；④项目技术方案分析；⑤项目投资及成本分析；⑥项目组织及投入资源分析；⑦可行性研究报告结论。该可行性报告缺少 （ ） 。",[513,515,517,519],{"key":20,"text":514,"correct":22},"风险分析、项目计划",{"key":24,"text":516,"correct":29},"风险分析、项目评估方法",{"key":27,"text":518,"correct":22},"市场需求预测、项目计划",{"key":31,"text":520,"correct":22},"市场需求预测、项目评估方法",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":24,"analysis":33},388601,"以下关于招投标的叙述，不正确的是 （ ） 。",[525,527,529,531],{"key":20,"text":526,"correct":22},"采购单位可直接从已有的供应商管理库中抽取若干供应商作为竞标者",{"key":24,"text":528,"correct":29},"采购文件是竞标方准备",{"key":27,"text":530,"correct":22},"采用加权系统对供方进行定性分析，可减少招投标活动中人为偏见带来的影响",{"key":31,"text":532,"correct":22},"对于关键性采购物，可采用多渠道采购以规避风险",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":31,"analysis":33},388602,"下列叙述中， （ ） 是错误的。",[537,539,541,543],{"key":20,"text":538,"correct":22},"可行性研究是项目投资决策和编制设计任务书的依据",{"key":24,"text":540,"correct":22},"可行性研究是项目单位筹集资金的重要依据",{"key":27,"text":542,"correct":22},"可行性研究是单位与各有关部门签订各种协议和合同的依据",{"key":31,"text":544,"correct":29},"可行性研究是员工绩效评估的依据",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":27,"analysis":33},388603,"某地方政府准备立项改造一个小型信息系统，由于项目投资额较小，立项过程可以简化，但其中的 （ ） 环节不能缺失。",[549,551,553,555],{"key":20,"text":550,"correct":22},"信息系统安全风险评估报告的编制和报批",{"key":24,"text":552,"correct":22},"初步设计方案的编制和报批",{"key":27,"text":554,"correct":29},"可行性研究报告的编制和报批",{"key":31,"text":413,"correct":22},{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":27,"analysis":33},388604,"“先论证、后决策”是现代项目管理的基本原则，关于建设方的项目论证，下列说法中， （ ） 是不正确的。",[560,562,564,566],{"key":20,"text":561,"correct":22},"一般而言，项目论证的核心问题是财务经济，即投资赢利问题",{"key":24,"text":563,"correct":22},"项目论证的费用属于立项前的工作费用，不计入项目的总投资之内",{"key":27,"text":565,"correct":29},"项目论证时在可行性研究的基础上，由第三方对可行性研究结果的综合审查",{"key":31,"text":567,"correct":22},"项目论证的第一步通常是机会研究",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":20,"analysis":33},388605,"在进行项目可行性分析时，需要在 （ ） 过程中针对投入\u002F产出进行对比分析，以确定项目的收益率和投资回收期等。",[572,574,575,577],{"key":20,"text":573,"correct":29},"经济可行性分析",{"key":24,"text":273,"correct":22},{"key":27,"text":576,"correct":22},"运行环境可行性分析",{"key":31,"text":578,"correct":22},"法律可行性分析",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":24,"analysis":33},388606,"信息系统可行性研究包括很多方面的内容， （ ） 中经常会用到敏感性分析。",[583,584,585,586],{"key":20,"text":273,"correct":22},{"key":24,"text":573,"correct":29},{"key":27,"text":576,"correct":22},{"key":31,"text":587,"correct":22},"社会可行性分析",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":31,"analysis":33},388607,"项目经理对项目负责，其正式权利由 （ ） 获得。",[592,594,596,598],{"key":20,"text":593,"correct":22},"项目工作说明书",{"key":24,"text":595,"correct":22},"成本管理计划",{"key":27,"text":597,"correct":22},"项目资源日历",{"key":31,"text":599,"correct":29},"项目章程",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":27,"analysis":33},388608,"关于项目评估和项目论证的描述。不正确的是： （ ） 。",[604,606,608,610],{"key":20,"text":605,"correct":22},"项目论证应该围绕市场需求、开发技术、财务经济三个方面展开调查和分析",{"key":24,"text":607,"correct":22},"项目论证一般可分为机会研究、初步可行性研究和详细可行性研究三个阶段",{"key":27,"text":609,"correct":29},"项目评估由项目建设单位实施，目的是审查项目可行性研究的可靠性。真实性、和客观性，为银行的货款决策或行政主管部门的审批决策提供依据",{"key":31,"text":611,"correct":22},"项目评估的依据包括项目建议书及其批准文件、项目可行性研究报告、报送单位的申请报告及主管部门的初审意见等一系列文件",[613,617,620,623,626,629],{"id":614,"name":615,"category":7,"favorite":616},136,"法律职业试卷二(客观题 )",2,{"id":618,"name":619,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":621,"name":622,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":624,"name":625,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":627,"name":628,"category":7,"favorite":8},28,"安全工程师",{"id":630,"name":631,"category":7,"favorite":8},112,"安全生产法律知识"]