[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":613},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,7,50,1856,[13,34,46,58,70,82,93,105,117,128,140,152,164,176,188,200,212,224,236,248,260,272,284,295,307,319,331,342,351,362,373,382,394,406,418,430,442,454,466,478,490,502,514,526,538,552,564,577,589,601],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},388507,1,"单选题","变更管理的工作程序包括：接受变更申请、对变更的初审、（ ）、CCB决定是否批准、发出变更通知并开始实施、变更实施监控、变更效果评估",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","变更实施",false,{"key":24,"text":25,"correct":26},"B","变更方案论证",true,{"key":28,"text":29,"correct":22},"C","组建CC",{"key":31,"text":32,"correct":22},"D","判断发生变更的项目是否己纳入正常轨道","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},388508,"以下关于项目变更控制委员会的描述中，（ ）是正确的。",[38,40,42,44],{"key":20,"text":39,"correct":22},"CCB是作业机构",{"key":24,"text":41,"correct":22},"CCB的工作是通过评审手段来决定项目是否能变更，并提出变更方案",{"key":28,"text":43,"correct":22},"CCB是决策机构，又是作业机构",{"key":31,"text":45,"correct":26},"CCB是决策机构",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},388509,"项目经理在综合变更中主要负责（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"评估变更对项目的影响",{"key":24,"text":53,"correct":22},"评估变更的应对方案",{"key":28,"text":55,"correct":22},"将变更由技术要求转换为资源要求",{"key":31,"text":57,"correct":22},"批准可否使用储备资源",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},388510,"关于组织战略的描述， 不正确的是：（）",[62,64,66,68],{"key":20,"text":63,"correct":22},"战略目标根据特定时期的战略形式和组织的利益需要确定",{"key":24,"text":65,"correct":22},"战略方针在分析当前组织面临战略形势和外部竞争等诸多因素基础上制定，具有较强的针对性，在不同的环境下应采取不同的战略方针",{"key":28,"text":67,"correct":26},"战略实施能力根据组织战略目标和战略方针要求，确定战略规模、发展和重点，是组织自身拥有的，无法通过外部获得",{"key":31,"text":69,"correct":22},"战略措施是组织决策机构根据战略实施的需要，在组织架构、权利分配、监督机制、授权环境等方面的安排",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},388511,"（ ）是指在组织战略的指导下，具体落实组织的战略行动，从业务管理、组织架构、人员配置等多个方面对组织进行项目化的管理。",[74,76,78,80],{"key":20,"text":75,"correct":22},"组织级项目战略",{"key":24,"text":77,"correct":22},"组织级项目",{"key":28,"text":79,"correct":22},"组织级项目治理",{"key":31,"text":81,"correct":26},"组织级项目管理",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},388512,"能够指导组织逐步普及和实施项目管理能力的步骤、程序和方法，帮助组织的项目管理一步一步地走向成熟的方法被称为（ ）",[86,88,89,91],{"key":20,"text":87,"correct":22},"组织项目管理最佳实践",{"key":24,"text":81,"correct":22},{"key":28,"text":90,"correct":22},"组织战略",{"key":31,"text":92,"correct":26},"项目管理成熟度模型",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":20,"analysis":33},388513,"组织级项目管理是组织在其内部搭建起项目组织管理、项目集管理和单项目管理的各个领域，以及在这些领域之间支持实现（ ）而提供的一个组织全局项目管理的框架体系。",[97,99,101,103],{"key":20,"text":98,"correct":26},"最佳实践",{"key":24,"text":100,"correct":22},"项目目标",{"key":28,"text":102,"correct":22},"组织目标",{"key":31,"text":104,"correct":22},"有效衔接",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":24,"analysis":33},388514,"与组织在进行单项目管理时所采用的项目管理方法不同，多项目管理有其自身的特点。关于多项目管理环节下的资源平衡技术的理解，（ ）是正确的",[109,111,113,115],{"key":20,"text":110,"correct":22},"多项目管理要求独立考虑单个项目的资源需求，并且考虑多个项目实施期间资金源的可获许性",{"key":24,"text":112,"correct":26},"在多项目管理发生资源冲突时需要在多个项目之间合理地调动资源，降低资金资源冲突程度",{"key":28,"text":114,"correct":22},"首先进行单一项目内的资源平衡，再进行多项目之间的资源平衡",{"key":31,"text":116,"correct":22},"在进行项目选择时，主要考虑单个项目的赢利性、技术可行性资源需求",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":24,"analysis":33},388515,"组织级项目管理框架由三部分内容组成，这三个部分内容相互作用，共同形成一个能够覆盖组织项目管理领域的框架结构。（ ）不属于这三部分内容。",[121,123,125,127],{"key":20,"text":122,"correct":22},"组织能力",{"key":24,"text":124,"correct":26},"组织潜能",{"key":28,"text":126,"correct":22},"成果",{"key":31,"text":98,"correct":22},{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":28,"analysis":33},388516,"PMI的0PM3模型是一个三维的模型,对其描述错误的是（ ）",[132,134,136,138],{"key":20,"text":133,"correct":22},"第一维是成熟度的四个梯级",{"key":24,"text":135,"correct":22},"第二维是项目管理的十个领域和五个基本过程",{"key":28,"text":137,"correct":26},"第二维是项目管理的十个领域",{"key":31,"text":139,"correct":22},"第三维是组织项目级项目管理的三个版图层。",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":20,"analysis":33},388517,"PMI的0PM3模型的成熟度的四个梯级分别是（ ）",[144,146,148,150],{"key":20,"text":145,"correct":26},"标准化的、可测量的、可控制的、持续改进的",{"key":24,"text":147,"correct":22},"标准化的、可量化的、可控制的、持续改进的",{"key":28,"text":149,"correct":22},"标准化的、可控制的、可量化的、持续改进的",{"key":31,"text":151,"correct":22},"可测量的、标准化的、可控制的、持续改进的",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":28,"analysis":33},388518,"通过各项目组合、项目集和单项目来达到组织层次的战略目标的推动力可以称为（ ）。其主要通过完善组织结构、方针政策、运作流程及其他治理机制，才能够保证组织有效地达成预期的战略目标。",[156,158,160,162],{"key":20,"text":157,"correct":22},"运营治理",{"key":24,"text":159,"correct":22},"战略治理",{"key":28,"text":161,"correct":26},"组织治理",{"key":31,"text":163,"correct":22},"项目战略",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":31,"analysis":33},388519,"企业为显著提高产品质量、工作效率和能力，并显著控制成本，对当前业务流程进行破坏性地重新设计称为业务流程重构，下列（ ）原则可以有效指导BPR项目实施。",[168,170,172,174],{"key":20,"text":169,"correct":22},"尽量要那些提供流程输入的人来执行流程操作",{"key":24,"text":171,"correct":22},"将决策点放到基层活动中，减少对流程的控制",{"key":28,"text":173,"correct":22},"对地理上集中的资源看作是分散地来处理",{"key":31,"text":175,"correct":26},"组织机构设计要围绕企业的产出，而不是一项一项的任务",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":28,"analysis":33},388520,"在进行业务流程改进时，通过对作业成本的确认和计量，消除“不增值作业”、改进“可增值作业”，将企业的损失、浪费减少到最低限度，从而促进企业管理水平提高的方法是（ ）。",[180,182,184,186],{"key":20,"text":181,"correct":22},"矩阵图法",{"key":24,"text":183,"correct":22},"蒙特卡罗法",{"key":28,"text":185,"correct":26},"ABC法",{"key":31,"text":187,"correct":22},"帕累托法",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":28,"analysis":33},388521,"某公司进行业务流程重构，在实施的过程中公司发生了多方面、多层次的变化，假定该公司的实施是成功的，则（ ）不应是该实施所带来的变化。",[192,194,196,198],{"key":20,"text":193,"correct":22},"企业文化的变化",{"key":24,"text":195,"correct":22},"服务质量的变化",{"key":28,"text":197,"correct":26},"业务方向的变化",{"key":31,"text":199,"correct":22},"组织管理的变化",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":28,"analysis":33},388522,"业务流程重构的实施步骤包括：项目的启动，拟定变革计划,建立项目团队，重新设计（ ）并实施，持续改进，重新开始。",[204,206,208,210],{"key":20,"text":205,"correct":22},"已有流程",{"key":24,"text":207,"correct":22},"系统架构",{"key":28,"text":209,"correct":26},"目标流程",{"key":31,"text":211,"correct":22},"企业架构",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},388523,"基于业务流程重构的信息系统规划主要步骤是（ ）。",[216,218,220,222],{"key":20,"text":217,"correct":22},"系统战略规划阶段、系统流程规划阶段、系统功能规划阶段和系统实施阶段",{"key":24,"text":219,"correct":26},"系统战略规划阶段、系统流程规划阶段、系统数据规划阶段、系统功能规划阶段和系统实施阶段",{"key":28,"text":221,"correct":22},"系统战略规划阶段、系统流程规划阶段、系统数据规划阶段和系统实施阶段",{"key":31,"text":223,"correct":22},"系统战略规划阶段、系统流程规划阶段、系统方案规划阶段、系统功能规划阶段和系统实施阶段",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":31,"analysis":33},388524,"某公司为提升企业竞争能力，改进管理模式，使业务流程合理化实施了（ ）,对业务流程进行了重新设计，使公司在成本、质量和服务质量等方面得到提尚。",[228,230,232,234],{"key":20,"text":229,"correct":22},"BPR",{"key":24,"text":231,"correct":22},"CCB",{"key":28,"text":233,"correct":22},"ARIS",{"key":31,"text":235,"correct":26},"BPM",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},388525,"（ ）是为了从流程角度衡量流程的“瓶颈”活动。通过评价相关活动的三个参数:r（价值系数）、f（贡献）、c（成本），衡量活动的运行效果。所谓“瓶颈”活动，是指那些制约业务流程运行的关键活动。",[240,242,244,246],{"key":20,"text":241,"correct":22},"供应链分析",{"key":24,"text":243,"correct":26},"增值性分析",{"key":28,"text":245,"correct":22},"挣值分析",{"key":31,"text":247,"correct":22},"净现值分析",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":28,"analysis":33},388526,"下列关于BPR的叙述中，（ ）是不正确的",[252,254,256,258],{"key":20,"text":253,"correct":22},"BPR需要对流程重新构思",{"key":24,"text":255,"correct":22},"BPR是对当前流程激进的破坏性创造",{"key":28,"text":257,"correct":26},"BPR是针对管理流程的重构",{"key":31,"text":259,"correct":22},"BPR有时会导致组织的不稳定",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":24,"analysis":33},388527,"业务流程管理信息化是将生产流程、业务流程、各类行政审批流程、人事处理流程、财务管理流程等需要多人协作实施的任务，全部或部分交由计算机处理的过程，对于企业来说，一般讲业务流程分为四个层次，其中资源能力计划和相关预算属于（ ）层次。",[264,266,268,270],{"key":20,"text":265,"correct":22},"战略",{"key":24,"text":267,"correct":26},"计划",{"key":28,"text":269,"correct":22},"运作",{"key":31,"text":271,"correct":22},"生产流程",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":20,"analysis":33},388528,"对于项目集而言，其核心构成要素是（ ）。",[276,278,280,282],{"key":20,"text":277,"correct":26},"具有协调收益交付的管理特点",{"key":24,"text":279,"correct":22},"千系人利益一致",{"key":28,"text":281,"correct":22},"共享知识和技能",{"key":31,"text":283,"correct":22},"共同的一个领导",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":31,"analysis":33},388530,"经过协调管理以获取单独管理所无法取得的收益的一组相关联的项目、子项目集和项目集活动属于（ ）。",[288,290,292,293],{"key":20,"text":289,"correct":22},"项目组合管理",{"key":24,"text":291,"correct":22},"组织协同管理",{"key":28,"text":81,"correct":22},{"key":31,"text":294,"correct":26},"项目集管理",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":28,"analysis":33},388531,"项目集指导委员会的主要责任是保证项目集能够按照计划实现组织的战略目标，围绕这一基本职能就要求项目集指导委员会承担在组织范围内对项目集的成功识别、启动和实现起到具有关键作用的职责。（ ）一般不属于项目集指导委员会的责任。",[299,301,303,305],{"key":20,"text":300,"correct":22},"保证项目集与组织愿景和目标的一致性",{"key":24,"text":302,"correct":22},"项目集批准和启动",{"key":28,"text":304,"correct":26},"项目集组件管理",{"key":31,"text":306,"correct":22},"项目集筹资计划审批",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":28,"analysis":33},388532,"项目集中知识管理主要包括三项内容，（ ）一般不属于项目集知识管理的容。",[311,313,315,317],{"key":20,"text":312,"correct":22},"跨项目集的知识收集与共享",{"key":24,"text":314,"correct":22},"掌握项目集具体知识内容的个人和主题专家知识的挖掘和整理",{"key":28,"text":316,"correct":26},"项目集审计",{"key":31,"text":318,"correct":22},"存储收集项目集知识和项目集构件的项目管理信息系统建设",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":31,"analysis":33},388533,"按照时间顺序以图形化的方式展现项目集预期发展方向，并在每个时间顺序事件建立系列的文档化标准，同时建立了项目集活动与预期收益之间的关系，以及项目集里程碑之间的关键依赖,传递业务战略与规划的优先级之间的连接可以被称为（ ）。",[323,325,327,329],{"key":20,"text":324,"correct":22},"项目集愿景",{"key":24,"text":326,"correct":22},"项目集商业论证",{"key":28,"text":328,"correct":22},"项目集治理",{"key":31,"text":330,"correct":26},"项目集路线图",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":28,"analysis":33},388534,"（ ）是从组织战略的角度，立足于项目集收益对将构建的项目集及各种备选的构建初始方案进行正式或非正式论证的过程，也即是对初始项目集的可行性研究。",[335,337,339,340],{"key":20,"text":336,"correct":22},"项目集评估",{"key":24,"text":338,"correct":22},"项目集详细可研",{"key":28,"text":326,"correct":26},{"key":31,"text":341,"correct":22},"项目集方案评审",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":20,"analysis":33},388535,"能够分解为各个子项目的大型项目，应该采用（ ）方法进行管理。",[346,347,349,350],{"key":20,"text":289,"correct":26},{"key":24,"text":348,"correct":22},"项目管理",{"key":28,"text":81,"correct":22},{"key":31,"text":294,"correct":22},{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":31,"analysis":33},388536,"在项目组合管理中，确定项目优先级的主要决定因素是（ ）",[355,357,359,361],{"key":20,"text":356,"correct":22},"项目的进度",{"key":24,"text":358,"correct":22},"项目组合的收益",{"key":28,"text":360,"correct":22},"项目总成本",{"key":31,"text":90,"correct":26},{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":28,"analysis":33},388537,"通过项目评价选择、多项目组合优化，确保项目符合企业的战略目标，从而实现企业收益最大化的管理过程属于（ ）。",[366,368,370,371],{"key":20,"text":367,"correct":22},"项目评价",{"key":24,"text":369,"correct":22},"项目商业论证",{"key":28,"text":289,"correct":26},{"key":31,"text":372,"correct":22},"项目治理",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":31,"analysis":33},388538,"如果项目之间只是在资金、技能、干系人等方面存在关联，则这些项目最好通过（ ）方式进行管理。",[377,379,380,381],{"key":20,"text":378,"correct":22},"利用项目管理的方法分别管理",{"key":24,"text":294,"correct":22},{"key":28,"text":81,"correct":22},{"key":31,"text":289,"correct":26},{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":31,"analysis":33},388539,"定义项目组合管理过程组由这样一些过程组成，不包括（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":22},"设定组织战略和目标如何在一个项目组合中被实现",{"key":24,"text":389,"correct":22},"确定项目组合战略计划",{"key":28,"text":391,"correct":22},"确定项目组合结构和路径",{"key":31,"text":393,"correct":26},"对项目组合组件进行分类、评估、选择",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},388540,"解决组织中多个项目之间的资源冲突问题，一般不宜采用的方法是（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":26},"制订资源计划时，每个项目预留尽量多的资源富余量",{"key":24,"text":401,"correct":22},"检查组织内部的资源使用情况，看是否有资源分配不合理的情况",{"key":28,"text":403,"correct":22},"制订资源在项目间分配的原则,重要的项目优先得到资源",{"key":31,"text":405,"correct":22},"将组织中的资源进行统一管理，避免资源浪费和过度使用",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":20,"analysis":33},388541,"项目组合管理是一个保证组织内所有项目都经过风险和收益分析，平衡资源的方法论，其中（ ）是项目组合管理工作的一个要素。",[410,412,414,416],{"key":20,"text":411,"correct":26},"提高资源利用率",{"key":24,"text":413,"correct":22},"风险管理",{"key":28,"text":415,"correct":22},"范围管理",{"key":31,"text":417,"correct":22},"项目战术管理",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":31,"analysis":33},388543,"在（ ）中，①用于防止信息抵赖；②用于防止信息被窃取；③用于防止信息被篡改；④用于防止信息被假冒。",[422,424,426,428],{"key":20,"text":423,"correct":22},"①加密技术②数字签名③完整性技术④认证技术",{"key":24,"text":425,"correct":22},"①完整性技术②认证技术③加密技术④数字签名",{"key":28,"text":427,"correct":22},"①数字签名②完整性技术③认证技术④加密技术",{"key":31,"text":429,"correct":26},"①数字签名②加密技术③完整性技术④认证技术",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":31,"analysis":33},388544,"《计算机信息系统安全保护等级划分准则》规定了计算机系统安全保护能力的5个等级。其中，按照（ ）的顺序从左到右安全能力逐渐增强",[434,436,438,440],{"key":20,"text":435,"correct":22},"系统审计保护级、结构化保护级、安全标记保护级",{"key":24,"text":437,"correct":22},"用户自主保护级、访问验证保护级、安全标记保护级",{"key":28,"text":439,"correct":22},"访问验证保护级、系统审计保护级、安全标记保护级",{"key":31,"text":441,"correct":26},"用户自主保护级、系统审计保护级、安全标记保护级",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":31,"analysis":33},388545,"下列选项中，（ ）是最安全的信息系统。",[446,448,450,452],{"key":20,"text":447,"correct":22},"ERP-CRM",{"key":24,"text":449,"correct":22},"MRPII",{"key":28,"text":451,"correct":22},"MIS-S",{"key":31,"text":453,"correct":26},"S-MIS",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":31,"analysis":33},388546,"（ ）指对主体访问和使用客体的情况进行记录和审查，以保证安全规则被正确执行，并帮助分析安全事故产生的原因。",[458,460,462,464],{"key":20,"text":459,"correct":22},"安全授权",{"key":24,"text":461,"correct":22},"安全管理",{"key":28,"text":463,"correct":22},"安全服务",{"key":31,"text":465,"correct":26},"安全审计",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":20,"analysis":33},388547,"（ ）不是超安全的信息安全保障系统（S2-MIS）的特点或要求。",[470,472,474,476],{"key":20,"text":471,"correct":26},"硬件和系统软件通用",{"key":24,"text":473,"correct":22},"PKI\u002FCA安全保障系统必须带密码",{"key":28,"text":475,"correct":22},"业务应用系统在实施过程中有重大变化",{"key":31,"text":477,"correct":22},"主要的硬件和系统软件需要PKI\u002FCA认证",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":31,"analysis":33},388548,"安全审计是保障计算机系统安全的重要手段之一，其作用不包括（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":22},"检测对系统的入侵",{"key":24,"text":485,"correct":22},"发现计算机的滥用情况",{"key":28,"text":487,"correct":22},"发现系统入侵行为和潜在的漏洞",{"key":31,"text":489,"correct":26},"保证可信网络内部信息不外泄",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":31,"analysis":33},388549,"“消息”是我们所关心的实际数据，经常也称为“明文”，用“M”表示。经过加密的消息是“密文”，用“C”表示。如果用C=E（M）表示加密，M=D （C）表示解密。那么从数学角度讲，加密只是一种从M（ ）的函数变换，解密正好是对加密的反函数变换。",[494,496,498,500],{"key":20,"text":495,"correct":22},"公钥到私钥",{"key":24,"text":497,"correct":22},"变量域到C函数域",{"key":28,"text":499,"correct":22},"定义域到C函数域",{"key":31,"text":501,"correct":26},"定义域到C值域",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":31,"analysis":33},388550,"基于角色的访问控制中，角色定义、角色成员的增减、角色分配都是由（ ）实施的，用户只能被动接受授权规定，不能自主地决定，用户也不能自主地将访问权限传给他人，这是一种非自主型访问控制。",[506,508,510,512],{"key":20,"text":507,"correct":22},"CSO",{"key":24,"text":509,"correct":22},"安全管理员",{"key":28,"text":511,"correct":22},"稽查员或审计员",{"key":31,"text":513,"correct":26},"应用系统的管理员",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":24,"analysis":33},388551,"结束软件测试工作时，应按照软件配置管理的要求，将（ ）纳入配置管理。",[518,520,522,524],{"key":20,"text":519,"correct":22},"全部测试工具",{"key":24,"text":521,"correct":26},"被测试软件",{"key":28,"text":523,"correct":22},"测试支持软件",{"key":31,"text":525,"correct":22},"以上都是",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":20,"analysis":33},388552,"配置管理和变更管理是项目管理中非常重要的组成部分，二者相比，配置管理重点关注（ ）。",[530,532,534,536],{"key":20,"text":531,"correct":26},"项目可交付成果及各个过程技术之间的匹配",{"key":24,"text":533,"correct":22},"识别，记录对项目文件的更改",{"key":28,"text":535,"correct":22},"批准或否决对项目文件的改变",{"key":31,"text":537,"correct":22},"对项目可交付成果或基准变更的记录",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":551,"analysis":33},388553,"对成熟的软件机构的描述正确的是（）。",[542,544,546,548,550],{"key":20,"text":543,"correct":22},"具有在企业范围内管理、控制软件开发和维护过程的能力",{"key":24,"text":545,"correct":22},"现有人员和新进人员均了解所遵循的软件过程，且工作活动均按照事先的计划完成",{"key":28,"text":547,"correct":22},"在定义好的软件过程中，所有项目和机构中的角色和责任分明",{"key":31,"text":549,"correct":22},"制订的计划是有效的且与实际的工作进展一致",{"key":551,"text":525,"correct":26},"E",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":28,"analysis":33},388554,"组织级项目管理OPM致力于集成（）内容。",[556,558,560,562],{"key":20,"text":557,"correct":22},"能力、组织战略、人、过程",{"key":24,"text":559,"correct":22},"组织战略、人、过程",{"key":28,"text":561,"correct":26},"知识、组织战略、人、过程",{"key":31,"text":563,"correct":22},"知识、组织架构、人、过程",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":551,"analysis":33},388555,"对不成熟的软件机构的描述正确的是（）。",[568,570,572,574,576],{"key":20,"text":569,"correct":22},"缺乏评价软件产品质量和解决产品缺陷和过程问题的客观基础",{"key":24,"text":571,"correct":22},"缺乏确定的软件过程和相应的管理和控制",{"key":28,"text":573,"correct":22},"即使给出了软件过程，也不严格遵循和强制执行",{"key":31,"text":575,"correct":22},"管理是完全被动的，管理者采用的策略是救火式的，即出了事才去解决,解决的时候也难以纵观全局，往往只顾眼前",{"key":551,"text":525,"correct":26},{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":28,"analysis":33},388556,"办公软件开发公司A非常重视软件过程管理，按照CONI（能力成熟度模型）逐步进行过程改进刚刚实现了组织级过程性能、定量项目管理，按照CMMI（能量成熟度模型），A公司达到了，（）级别。",[581,583,585,587],{"key":20,"text":582,"correct":22},"CMNI2",{"key":24,"text":584,"correct":22},"CMMI3",{"key":28,"text":586,"correct":26},"CMMI4",{"key":31,"text":588,"correct":22},"CMMI5",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":24,"analysis":33},388557,"以下关于关键实践的说法中，正确的是（）。",[593,595,597,599],{"key":20,"text":594,"correct":22},"关键实践是每个关键过程域中的所有活动",{"key":24,"text":596,"correct":26},"关键实践描述了应当怎样完成关键过程域的目标",{"key":28,"text":598,"correct":22},"关键实践只是描述了部分关键过程域的活动",{"key":31,"text":600,"correct":22},"关键实践在不同的成熟度级别是一样的",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":28,"analysis":33},388558,"在软件项目开始之前，客户就能对过程能力和风险有了定量的了解的是（）",[605,607,609,611],{"key":20,"text":606,"correct":22},"可重复级",{"key":24,"text":608,"correct":22},"已定义级",{"key":28,"text":610,"correct":26},"已管理级",{"key":31,"text":612,"correct":22},"优化级",[614,618,621,624,627,630],{"id":615,"name":616,"category":7,"favorite":617},136,"法律职业试卷二(客观题 )",2,{"id":619,"name":620,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":622,"name":623,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":625,"name":626,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":628,"name":629,"category":7,"favorite":8},28,"安全工程师",{"id":631,"name":632,"category":7,"favorite":8},112,"安全生产法律知识"]