[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":622},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,6,50,1856,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,526,538,550,562,574,586,598,610],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},388456,1,"单选题","你正在管理一个有5个转包商的项目，需要监控合同的实施、费用的支付以及与供应商洽谈的各种问题。其中一个转包商呈报了一项旨在扩大其工作范围的变更请求。出于对这项请求的考虑，你决定批准这个合同变更。这些活动都属于下列（ ）涉及的范畴",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","合同管理",true,{"key":24,"text":25,"correct":26},"B","合同执行",false,{"key":28,"text":29,"correct":26},"C","合同构成",{"key":31,"text":32,"correct":26},"D","合同解决","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},388457,"按照我国建设部、财政部下达的通用条款，下列关于索赔的说法错误的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"索赔必须以合同为依据",{"key":24,"text":41,"correct":26},"索赔必须注意资料的积累",{"key":28,"text":43,"correct":22},"索赔是一种惩罚行为",{"key":31,"text":45,"correct":26},"索赔处理要及时、合理",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},388458,"索赔是合同管理中经常会碰到的问题，以下关于索赔管理的描述中，（ ）是正确的。",[50,52,54,56],{"key":20,"text":51,"correct":22},"一方或双方存在违约行为和事实是合同索赔的前提",{"key":24,"text":53,"correct":26},"凡是遇到客观原因造成的损失，承包商都可以申请费用补偿",{"key":28,"text":55,"correct":26},"索赔是对对方违约行为的一种惩罚",{"key":31,"text":57,"correct":26},"承建方应该将索赔通知书直接递交建设方，监理方不参与索赔管理",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},388459,"小王为本公司草拟了一份计算机设备采购合同，其中写到“乙方需按通常的行业标准提供技术支持服务”。经理审阅后要求小王修改，原因是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"文字表达不通顺",{"key":24,"text":65,"correct":26},"格式不符合国家或行业标准的要求",{"key":28,"text":67,"correct":22},"对合同标的描述不够清晰、准确",{"key":31,"text":69,"correct":26},"术语使用不当",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},388460,"系统集成合同管理是管理建设方与承建方的关系，保证承建方的实际工作满足合同要求的过程，其内容不包括（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"合同签订管理",{"key":24,"text":77,"correct":26},"合同履行管理",{"key":28,"text":79,"correct":26},"合同变更管理",{"key":31,"text":81,"correct":22},"合同违约管理",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},388461,"签订信息系统工程项目合同时有需要注意事项。下列选项中（ ）在合同签订时不要考虑。",[86,88,90,92],{"key":20,"text":87,"correct":26},"当事人的法律资格",{"key":24,"text":89,"correct":26},"验收标准",{"key":28,"text":91,"correct":22},"项目管理计划",{"key":31,"text":93,"correct":26},"技术支持服务",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},388462,"甲乙双方订立合同，规定甲应予2007年8月1日交货，乙应予同年8月7日付款，月底，甲发现乙财产状况恶化，已没有支付货款的能力，并有确切证据，甲提出终止合同，但乙未允。基于上述情况，甲于8月1日未按约定交货，依照合同法的原则。下列关于甲行为的论述中，正确的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"甲必须按合同约定交货，但可以要求乙提供相应的担保",{"key":24,"text":101,"correct":22},"甲有权不按合同约定交货，除非乙提供了相应的担保",{"key":28,"text":103,"correct":26},"甲必须按合同约定交货，但可以仅先交付部分货物",{"key":31,"text":105,"correct":26},"甲应按合同约定交货，如乙不支付货款可追究其违约责任",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},388463,"根据我国政府采购法，采购人与中标成交供应商应当在中标通知书发出之日起（ ）日内按照采购文件确定的事项签订政府采购合同。",[110,112,114,116],{"key":20,"text":111,"correct":26},"7",{"key":24,"text":113,"correct":26},"10",{"key":28,"text":115,"correct":26},"20",{"key":31,"text":117,"correct":22},"30",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},388464,"下列围绕采购供应商选择的做法中，（ ）是不恰当的",[122,124,126,128],{"key":20,"text":123,"correct":26},"采购部门根据历年供应商的供货情况建立了一个供应商数据库，根据数据库选择合格供应商",{"key":24,"text":125,"correct":26},"首先进行供应商调查，满足标准要求后可纳入合格供应商名单",{"key":28,"text":127,"correct":22},"为保持采购的公开透明，采购均采取招标形式选择合格供应商",{"key":31,"text":129,"correct":26},"把采购物品分为3个等级，最低一级供应企业可以没通过ISO9001认证",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},388465,"采购是项目管理工作的重要组成部分。以下关于采购的叙述中，（ ）是不正确的。",[134,136,138,140],{"key":20,"text":135,"correct":26},"采购管理计划是评估卖方的衡量指标",{"key":24,"text":137,"correct":22},"采购工作说明书不是来自于项目范围基准",{"key":28,"text":139,"correct":26},"采购工作说明书描述采购产品的细节",{"key":31,"text":141,"correct":26},"采购管理计划确定采用的合同类型",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},388466,"在招标段，项目小组的任务是（ ）",[146,148,150,152],{"key":20,"text":147,"correct":26},"进行自制或购买决策",{"key":24,"text":149,"correct":22},"准备采购文件",{"key":28,"text":151,"correct":26},"规定进度表参数，包括交付日期",{"key":31,"text":153,"correct":26},"为招标制定有关规定和图表",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},388467,"以下关于招投标的说法，错误的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"招标人设有标底的，标底必须保密",{"key":24,"text":161,"correct":26},"依法必须进行招标的项目，自招标文件开始发出之日起至投标人提交投标文件截止之日止，最短不得少于二十日",{"key":28,"text":163,"correct":22},"国家重点项目和省、自治区、直辖市人民政府确定的地方重点项目不适宜公开招标的，经相关部门批准，可以不进行招标",{"key":31,"text":165,"correct":26},"招标人具有编制招标文件和组织评标能力的，可以自行办理招标事宜",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},388468,"项目正在紧张的进展之中，团队成员感到压力在逐渐增大，为了减少大家的压力，你决定要在每次的项目状态会议上都要进行能补充能量的瑜珈术部分。根据公司项目管理的统一方法，你在寻找这种服务的供应商之前应该准备好下列（ ）文件",[170,172,174,176],{"key":20,"text":171,"correct":26},"工作说明",{"key":24,"text":173,"correct":22},"采购管理计划",{"key":28,"text":175,"correct":26},"评估方法",{"key":31,"text":177,"correct":26},"合同条款和条件",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},388469,"供应商战略伙伴关系是企业与供应商之间达成的最高层次的合作关系。有关战略合作管理的描述，不正确的是（ ）",[182,184,186,188],{"key":20,"text":183,"correct":22},"战略合作管理的管理模式是“以企业为中心”",{"key":24,"text":185,"correct":26},"可以缩短供应商的供应周期，提高供应灵活性",{"key":28,"text":187,"correct":26},"可以与供应商共享管理经验，推动企业整体管理水平的提高",{"key":31,"text":189,"correct":26},"可以降低企业采购设备的库存水平，降低管理费用，加快资金周转",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},388470,"项目采购是一项复杂的工作，编制详细可行的项目采购计划有助于项目成功。（ ）属于编制项目采购计划所必须考虑的内容，",[194,196,198,200],{"key":20,"text":195,"correct":26},"工作说明书",{"key":24,"text":197,"correct":22},"项目范围说明书",{"key":28,"text":199,"correct":26},"自制\u002F外购决定",{"key":31,"text":201,"correct":26},"合同收尾规程",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},388471,"以下关于采购计划的叙述中，不正确的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":26},"编制采购计划的第一步是考虑哪些产品或服务由项目团队自己提供划算，还是通过采购更为划算",{"key":24,"text":209,"correct":26},"每一次采购都要经历从编制采购计划到完成采购的全过程",{"key":28,"text":211,"correct":22},"项目进度计划决定和影响着项目采购计划，项目采购计划作出的决策不会影响项目进度计划",{"key":31,"text":213,"correct":26},"编制采购计划时，需要考虑的内容有成本估算、进度、质量管理计划、现金流预测等",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},388472,"在你的公司中，你正致力于完成一个新项目。因为项目中有一些方面对公司来说是很陌生的，所以公司的现有员工不能完全满足该项目的要求。你发现了一些这种产品的销售商，他们即使不能完全满足你的需求也至少能符合你的大部分要求。你正在准备你的项目计划，需要决定如何最优地达到项目的资源需求和人员配置。你第一步应该做的是（ ）",[218,220,222,224],{"key":20,"text":219,"correct":22},"实施“自制一购入”分析。",{"key":24,"text":221,"correct":26},"实施一项市场调查",{"key":28,"text":223,"correct":26},"向各承包商发放RFP（方案征集书）征求方案，以决定你是否应该为该项目在公司外部筹集资源。",{"key":31,"text":225,"correct":26},"重新审查已有的各个承包商的情况，选择其中符合项目要求的承包商并向他们分发RFP（方案征集书）",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},388473,"在你准备要结束与项目相关的合同的时候，你应该考虑多种类型的文件，但不包括下列（ ）",[230,232,234,236],{"key":20,"text":231,"correct":26},"关于结束合同的文件",{"key":24,"text":233,"correct":22},"采购审核",{"key":28,"text":235,"correct":26},"发票和付款记录单",{"key":31,"text":237,"correct":26},"承包商的业绩报告",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},388474,"以下（ ）不是邀请潜在卖方供货的采购文件的通称",[242,244,246,248],{"key":20,"text":243,"correct":26},"承包商初期反应",{"key":24,"text":245,"correct":22},"信息征集",{"key":28,"text":247,"correct":26},"报价征集书",{"key":31,"text":249,"correct":26},"谈判邀请",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},388475,"作为项目整体管理人员，你的主要工作是协调大量承包商的工作。你目前的项目是用完全依靠全球卫星定位的空中交通控制系统替代老的系统。项目已经接近尾声。你有15个承包商和大量的其它供货商。其中几个承包商非常容易共事。你的组织未来还将再次雇佣他们。其中一个承包商每隔一周就提出变更请求，要求增加经费。另一个从来没有提出过变更要求。两个公司在遵守管理规定方面遇到了困难，但是都还能够按时交货。在项目结束阶段，你应该（ ）",[254,256,258,260],{"key":20,"text":255,"correct":26},"进行趋势分析",{"key":24,"text":257,"correct":26},"通过挣值评估在本项目中获得的经验",{"key":28,"text":259,"correct":26},"要求每个承包商与你单独见面，费用由他们自己承担",{"key":31,"text":261,"correct":22},"进行采购审核",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},388476,"某招标文件要求投标方应具有计算机信息系统集成资质和ISO 9000质量认证证书，投标人在投标文件中提供了母公司的计算机信息系统集成资质和ISO 9000质量认证证书，则该投标人提供的投标文件（ ）",[266,268,270,272],{"key":20,"text":267,"correct":26},"符合招标要求",{"key":24,"text":269,"correct":22},"不符合招标要求",{"key":28,"text":271,"correct":26},"基本符合招标要求",{"key":31,"text":273,"correct":26},"完全符合招标要求",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":28,"analysis":33},388477,"某地政府采取询价方式采购网络设备，（ ）是符合招投标法要求的。",[278,280,282,284],{"key":20,"text":279,"correct":26},"询价小组由采购人的代表和有关专家共8人组成",{"key":24,"text":281,"correct":26},"被询价的A供应商提供第一次报价后，发现报价有误，调整后提交了二次报价",{"key":28,"text":283,"correct":22},"询价小组根据采购需求，从符合资格条件的供应商名单中确定三家供应商，并向其发出询价通知书让其报价",{"key":31,"text":285,"correct":26},"采购人根据符合采购需求、质量和服务相等且报价最低的原则确定成交供应商，最后将结果通知成交供应商",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},388478,"如果一个配置项的版本号为1.1，那么这个配置处于（ ）状态。",[290,292,294,296],{"key":20,"text":291,"correct":26},"草稿",{"key":24,"text":293,"correct":22},"正式发布",{"key":28,"text":295,"correct":26},"修改",{"key":31,"text":297,"correct":26},"完成",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},388479,"配置审计包括物理审计和功能审计，（ ）属于功能审计的范畴。在软件配置管理中",[302,304,306,308],{"key":20,"text":303,"correct":22},"代码走查",{"key":24,"text":305,"correct":26},"变更过程的规范性审核",{"key":28,"text":307,"correct":26},"介质齐备性检查",{"key":31,"text":309,"correct":26},"配置项齐全性审核",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},388480,"对于软件开发项目来说，基线是软件生存期各个开发阶段的成果，测试阶段的基线是（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":26},"可提交软件",{"key":24,"text":317,"correct":26},"被测试的程序",{"key":28,"text":319,"correct":26},"提交报告",{"key":31,"text":321,"correct":22},"测试报告",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},388481,"信息系统文档的管理主要体现在文档书写规范、图表编号规则、文档目录编写标准和（ ）等几个方面。",[326,328,330,332],{"key":20,"text":327,"correct":26},"文档管理方法",{"key":24,"text":329,"correct":22},"文档管理制度",{"key":28,"text":331,"correct":26},"监理文档规范",{"key":31,"text":333,"correct":26},"文档使用权限控制",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":31,"analysis":33},388482,"软件文档分为（ ）三类",[338,340,342,344],{"key":20,"text":339,"correct":26},"需求分析文档设计文档编码文档",{"key":24,"text":341,"correct":26},"开发文档产品文档维护文档",{"key":28,"text":343,"correct":26},"项同文档产品文档培训文档",{"key":31,"text":345,"correct":22},"开发文档产品文档管理文档",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},388483,"某软件开发项目在测试时发现需求需要调整，涉及到需求规格说明书、概要设计、详细设计及代码等相关文档的变更，需要对（ ）进行变更控制。",[350,352,354,356],{"key":20,"text":351,"correct":26},"知识库",{"key":24,"text":353,"correct":22},"配置库",{"key":28,"text":355,"correct":26},"产品库",{"key":31,"text":357,"correct":26},"数据库",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":28,"analysis":33},388484,"配置项的状态可分为“草稿”、“正式”和“修改”三种。以下关于配置项状态的叙述中，不正确的是：（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":26},"配置项处于“草稿”状态时，版本号格式为0.YZ",{"key":24,"text":365,"correct":26},"配置项第一次成为“正式”文件时，版本号为1.0",{"key":28,"text":367,"correct":22},"配置项处于“修改”状态时，版本号应改回0.YZ",{"key":31,"text":369,"correct":26},"对于配置项的任何版本都应该保存，不能抛弃旧版本",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},388486,"配置项的版本控制作用于多个配置管理活动之中，如创建配置项，配置项的变更和配置项的评审等。下面关于配置项的版本控制的描述中，（ ）是正确的",[374,376,378,380],{"key":20,"text":375,"correct":22},"在项目开发过程中，绝大部分的配置项目都要经过多次的修改才能最终确定下来。",{"key":24,"text":377,"correct":26},"对配置项的修改不一定产生新版本。",{"key":28,"text":379,"correct":26},"版本控制的目的是按照一定的规则有选择地保存配置项的必要的版本。",{"key":31,"text":381,"correct":26},"由于我们保证新版本一定比旧版本好，所以可以抛弃旧版本。",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":28,"analysis":33},388487,"配置识别是配置管理的一个要素，包括选择一个系统的配置项和在技术文档中配置项目的功能和物理特性，（ ）是配置管理的员的关键职责。",[386,388,390,392],{"key":20,"text":387,"correct":26},"识别软件开发中产生的所有工作结果",{"key":24,"text":389,"correct":26},"给每个产品及其组件和相关的文档分配标识",{"key":28,"text":391,"correct":22},"定义每个配置项目的重要特征以及识别其所有者",{"key":31,"text":393,"correct":26},"修改基线",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":28,"analysis":33},388488,"在软件配置管理中，版本控制的目的是按照一定的规则保存配置项的（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":26},"重要版本",{"key":24,"text":401,"correct":26},"基线版本",{"key":28,"text":403,"correct":22},"所有版本",{"key":31,"text":405,"correct":26},"需要的版本",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":28,"analysis":33},388489,"配置管理系统通常由（ ）组成。",[410,412,414,416],{"key":20,"text":411,"correct":26},"动态库、静态库和产品库",{"key":24,"text":413,"correct":26},"开发库、备份库和产品库",{"key":28,"text":415,"correct":22},"动态库、主库和产品库",{"key":31,"text":417,"correct":26},"主库、受控库和产品库",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":24,"analysis":33},388490,"（ ）不属于管理文档",[422,424,426,428],{"key":20,"text":423,"correct":26},"变更控制记录",{"key":24,"text":425,"correct":22},"开发计划",{"key":28,"text":427,"correct":26},"项目总结报告",{"key":31,"text":429,"correct":26},"需求文件评审记录",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":24,"analysis":33},388491,"在配置项版本控制过程中，处于“正式发布”状态的配置项的版本号格式为（ ）（X、Y、Z均为1-9的数字）。",[434,436,438,440],{"key":20,"text":435,"correct":26},"0.YZ",{"key":24,"text":437,"correct":22},"X.Y",{"key":28,"text":439,"correct":26},"X.Y.Z",{"key":31,"text":441,"correct":26},"X.YZ",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":28,"analysis":33},388492,"配置项目版本控制的步骤是（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":26},"①④③②",{"key":24,"text":449,"correct":26},"③②①④",{"key":28,"text":451,"correct":22},"④③①②",{"key":31,"text":453,"correct":26},"④③②①",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":31,"analysis":33},388493,"关于配置管理计划的制订和审批，下面说法正确的是（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":26},"配置管理计划应由配置管理人员制订，由项目经理审批",{"key":24,"text":461,"correct":26},"配置管理计划应由项目经理制订，由配置控制委员会审批",{"key":28,"text":463,"correct":26},"配置管理计划应由项目经理制订，由QA人员审批",{"key":31,"text":465,"correct":22},"配置管理计划应由配置管理人员制订，由配置控制委员会审批",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":24,"analysis":33},388494,"做好变更管理可以使项目的质量、进度、成本管理更加有效。关于变更工作程序的 描述，不正确的是（） ①及时、正式的提出变更，且留下书面记录 ②变更初审的常见方式为变更申请文档的格式校验 ③变更方案论证首先是对变更请求是否可行实现进行论证 ④审查过程中，客户根据变更申请及评估方案，决定是否变更项目基准 ⑤发出变更通知并组织实施 ⑥变更实施的工程监控，配置管理员负责基准的监控 ⑦变更效果评估中的首要评估是项目的基准 ⑧基准调整后，需要判断项目是否已纳入正轨",[470,472,474,476],{"key":20,"text":471,"correct":26},"②③⑤",{"key":24,"text":473,"correct":22},"②④⑥",{"key":28,"text":475,"correct":26},"①②③④",{"key":31,"text":477,"correct":26},"⑤⑥⑦⑥",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":31,"analysis":33},388495,"变更管理有两个重要的用途，一是（ ）；二是变更度量分析，帮助组织提升自身的项目管理能力。",[482,484,486,488],{"key":20,"text":483,"correct":26},"分析变更的原因，并管理这些原因",{"key":24,"text":485,"correct":26},"规避风险，确保项目顺利",{"key":28,"text":487,"correct":26},"限制变更，维持项目的计划",{"key":31,"text":489,"correct":22},"控制变更，保证项目可控",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":28,"analysis":33},388496,"某企业的管理系统已进入试运行阶段，公司领导在试用该系统时认为他使用的出差报销表格的栏目设置不合理，便电话要求负责系统建设的项目经理修改，根据变理管理的要求，项目经理正确的做法是（ ）",[494,496,498,500],{"key":20,"text":495,"correct":26},"告诉公司领导，项目试运行结束后再统一修改",{"key":24,"text":497,"correct":26},"让开发人员修改，再通知公司领导确认",{"key":28,"text":499,"correct":22},"将公司领导的要求记录下来，确认变更内容后提出正式的变更申请",{"key":31,"text":501,"correct":26},"亲自督促对该表格的修改，完成后亲自确认并向公司领导汇报。",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":28,"analysis":33},388497,"李先生是某软件开发公司负责项目的项目经理，该项目已经完成了前期的工作进入了实现阶段，但用户提出要增加一项新的功能，李先生应该（ ）",[506,508,510,512],{"key":20,"text":507,"correct":26},"拒绝该变更",{"key":24,"text":509,"correct":26},"认为用户要求合理、立即实现该变更",{"key":28,"text":511,"correct":22},"通过变更控制过程管理该变更",{"key":31,"text":513,"correct":26},"要求用户与公司领导协调",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":28,"analysis":33},388498,"某项目在执行过程中，软件的需求基线已经确定后，客户需要增加新的功能，但该需求变更会对已经完成系统的稳定性有较大影响。作为项目负责人处理这些需求变更，下列（ ）做法是不合适的。",[518,520,522,524],{"key":20,"text":519,"correct":26},"利用原型法给用户提供预览，以帮助准确把握用户的真实需求",{"key":24,"text":521,"correct":26},"可以跟客户说不，并与其商议在后续项目或下一版本中满足他们的要求",{"key":28,"text":523,"correct":22},"秉承“客户至上”的原则，召集有关人员开始变更工作，满足客户的要求",{"key":31,"text":525,"correct":26},"利用在项目初期文档化的视图、范围、限制，与变更项比较，决定是否采用此项变更",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":24,"analysis":33},388499,"在变更管理中，“变更初审”的目的是（ ）",[530,532,534,536],{"key":20,"text":531,"correct":26},"确保评估所需信息准备的必要性",{"key":24,"text":533,"correct":22},"在干系人向就提出供评估的变更信息达成共识",{"key":28,"text":535,"correct":26},"以项目基准为评估依据",{"key":31,"text":537,"correct":26},"对变更实施进行监控",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":20,"analysis":33},388500,"以下有关变更控制方面的描述中，（ ）是正确的。",[542,544,546,548],{"key":20,"text":543,"correct":22},"任何变更都要得到三方（建设单位、监理单位和承建单位）的书面确认，严禁擅自变更。",{"key":24,"text":545,"correct":26},"承建单位或建设单位是变更的申请者，监理方不能提出变更申请。",{"key":28,"text":547,"correct":26},"承建单位提出变更申请，一般应首先递交业主初审，同意后再与监理协商确定变更方法。",{"key":31,"text":549,"correct":26},"建设单位不能提出变更申请",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":20,"analysis":33},388501,"变更管理首要完成的任务是（ ）",[554,556,558,560],{"key":20,"text":555,"correct":22},"分析变更的必要性和合理性，确定是否实施变更",{"key":24,"text":557,"correct":26},"记录变更信息，填写变更控制单",{"key":28,"text":559,"correct":26},"作出变更，并交上级审批",{"key":31,"text":561,"correct":26},"修改相应的软件配置项（基线），确立新的版本",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":28,"analysis":33},388502,"项目进行过程中，客户要求进度提前，围绕整体变更管理，项目经理以下做法，正确的是（ ）。",[566,568,570,572],{"key":20,"text":567,"correct":26},"进度变更和整体变更应一步到位，不要反复迭代",{"key":24,"text":569,"correct":26},"进度变更对成本、人力资源的影响，可在变更实施时再进行评价",{"key":28,"text":571,"correct":22},"先要求提出变更申请，走进度变更流程，然后根据变更后的新基线再进行相关的成本、人力资源等的变更",{"key":31,"text":573,"correct":26},"只要变更内容正确，即可执行变更",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":24,"analysis":33},388503,"配置控制与变更包含着几个重要的任务，变更申请，变更评估，通报评估结果，变更实施，变更验证，与确认，变更发布等。其中变更实施的主要负责人一般是（ ）",[578,580,582,584],{"key":20,"text":579,"correct":26},"CCB",{"key":24,"text":581,"correct":22},"项目经理",{"key":28,"text":583,"correct":26},"配置管理员",{"key":31,"text":585,"correct":26},"QA",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":24,"analysis":33},388504,"变更控制是对（ ）的变更进行标识、文档化、批准或拒绝，并控制。",[590,592,594,596],{"key":20,"text":591,"correct":26},"详细的WBS计划",{"key":24,"text":593,"correct":22},"项目基线",{"key":28,"text":595,"correct":26},"项目预算",{"key":31,"text":597,"correct":26},"明确的项目组织结构",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":28,"analysis":33},388505,"以下关于变更的流程和规则的做法中，（ ）是错误的。",[602,604,606,608],{"key":20,"text":603,"correct":26},"以口头方式提出某项变更，在评估前针对该变更提交了书面报告。",{"key":24,"text":605,"correct":26},"项目组成员变更以邮件发出，在评审前填写了变更申请。",{"key":28,"text":607,"correct":22},"为了规范，监理不对变更进行分级，所有变更流程都不能简化。",{"key":31,"text":609,"correct":26},"按照影响范围，紧急程度把变更分为3个有限级别。",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":28,"analysis":33},388506,"下列选项中．属于变更控制委员会主要任务的是（ ）。",[614,616,618,620],{"key":20,"text":615,"correct":26},"提出变更申请",{"key":24,"text":617,"correct":26},"评估变更影响",{"key":28,"text":619,"correct":22},"评价、审批变更",{"key":31,"text":621,"correct":26},"实施变更",[623,627,630,633,636,639],{"id":624,"name":625,"category":7,"favorite":626},136,"法律职业试卷二(客观题 )",2,{"id":628,"name":629,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":631,"name":632,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":634,"name":635,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":637,"name":638,"category":7,"favorite":8},28,"安全工程师",{"id":640,"name":641,"category":7,"favorite":8},112,"安全生产法律知识"]