[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":618},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,5,50,1856,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,356,368,380,392,404,416,428,440,451,463,475,487,499,511,523,535,547,558,570,582,594,606],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},388406,1,"单选题","人员配备管理计划描述何时以及怎样满足人力资源需求。关于人员配备管理计划的叙述中，（ ）是正确的。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","制定人员配备管理计划可采用工作分解结构、组织分解结构和资源分解结构等描述工具",true,{"key":24,"text":25,"correct":26},"B","项目人力资源计划可以是正式或非正式的，但人员配备管理计划是不能省略的正式计划",false,{"key":28,"text":29,"correct":26},"C","人员配备管理计划通常制订人员需求和人力资源时间安排，不涉及人员培训和奖惩措施",{"key":31,"text":32,"correct":26},"D","项目人力资源计划是项目人员配备管理计划的一个分计划","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},388407,"虽然项目具有独特性，但考虑到当前进行的项目和去年已完工的一个项目类似，为了加快人力资源计划的编制，项目经理小王采用了这个类似项目的任务或职责定义、汇报关系、组织架构图和职位描述。小王在人力资源计划的编制过程中采用了（ ）方法。",[38,40,42,44],{"key":20,"text":39,"correct":26},"组织结构图和职位描述",{"key":24,"text":41,"correct":22},"人力资源模板",{"key":28,"text":43,"correct":26},"非正式的人际网络",{"key":31,"text":45,"correct":26},"活动资源估算",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},388408,"一家公司为了满足员工社会交往的需要会经常组织一些聚会和社会活动,还为没有住房的员工提供抵押贷款,这些激励员工的理论基础是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"期望理论",{"key":24,"text":53,"correct":26},"X理论和Y理论",{"key":28,"text":55,"correct":26},"赫茨伯格的双因素理论",{"key":31,"text":57,"correct":22},"马斯洛需要层次理论",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},388409,"在以下那些领域的冲突代表了所有项目冲突50%以上的内容：（ ）",[62,64,66,68],{"key":20,"text":63,"correct":26},"项目成员，成本目标和进度表",{"key":24,"text":65,"correct":26},"成本目标，行政程序和进度表",{"key":28,"text":67,"correct":22},"进度表，项目优先性和人力资源",{"key":31,"text":69,"correct":26},"项目成员，项目优先性和成本目标",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},388410,"团队建设活动包括管理层面和个人层面两部分的内容，所有这些活动的最终目的都是为了提高团队的工作绩效。但是事实上很多情况下团队工作绩效的提高只是团队建设活动的“副产品”而已，下面的事例中（ ）属于这种情况：",[74,76,78,80],{"key":20,"text":75,"correct":26},"建立团队目标，然后组织大家参加一些放松活动（如郊游），并在举行这些娱乐活动的时候找到机会让大家探讨达到团队目标的最佳方法",{"key":24,"text":77,"correct":26},"将所有的团队成员集中在同一个地方工作",{"key":28,"text":79,"correct":26},"建立一个根据团队整体工作绩效进行考核和奖酬的体系",{"key":31,"text":81,"correct":22},"让非管理层的团队成员参与编制项目计划的过程",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},388411,"假定你和公司的CEO是邻居，你们的关系比较铁，而公司的同事也都知道你们之间的关系比较好。最近，你的公司任命你为一个新项目的项目经理，而这个项目对实现下一年的财务目标是至关重要的。你会依靠下列（ ）权力类型来行使项目经理的权力",[86,88,90,92],{"key":20,"text":87,"correct":22},"参照型",{"key":24,"text":89,"correct":26},"酬劳型",{"key":28,"text":91,"correct":26},"正式型",{"key":31,"text":93,"correct":26},"专家型",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},388412,"你正在管理一个虚拟团队。你的团队成员都分布在不同的地方工作，而且只能碰一两次面。这个项目已经启动有几个月了，你强烈地感觉到这些成员并没有把他们视为一个整体的。为了改善这种情况，你应该（ ）",[98,100,102,104],{"key":20,"text":99,"correct":26},"确保每个项目团队的都使用电子邮件进行沟通",{"key":24,"text":101,"correct":26},"命令成员要服从组织的安排和命令",{"key":28,"text":103,"correct":22},"创造项目团队标识来增进团队的凝聚力",{"key":31,"text":105,"correct":26},"通过沟通向团队成员提供最新的技术和指令",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},388413,"沟通管理计划的编制是确定（ ）的过程，即明确谁需要何种信息，何时需要以及如何向他们传递。",[110,112,114,116],{"key":20,"text":111,"correct":22},"干系人信息与沟通需求",{"key":24,"text":113,"correct":26},"沟通方式与信息发布",{"key":28,"text":115,"correct":26},"干系人提供的绩效信息",{"key":31,"text":117,"correct":26},"干系人管理与经验教训总结",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},388414,"某项目的现状是：已经按照沟通计划发布了项目信息；一些项目可交付成果发生了 变更；这些变更时按照变更控制计划做出的；一位干系人在得知以前曾经公布过的 项目可交付成果变更时，感觉十分惊讶；其余干系人都收到了变更通知的消息。针 对这种情况，项目经理应该（）",[122,124,126,128],{"key":20,"text":123,"correct":26},"告诉干系人信息公布的日期",{"key":24,"text":125,"correct":26},"审核沟通计划，确定为什么干系人不理解自己的职责",{"key":28,"text":127,"correct":22},"对沟通计划进行审核，如需要，对沟通计划进行修改",{"key":31,"text":129,"correct":26},"在下次项目工作会议上说明该问题，以便其他干系人不会遗忘公布的变更信息",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},388415,"（ ）是制定项目沟通管理计划的输入",[134,136,138,140],{"key":20,"text":135,"correct":26},"沟通技术",{"key":24,"text":137,"correct":26},"项目可行性分析",{"key":28,"text":139,"correct":26},"成本控制",{"key":31,"text":141,"correct":22},"项目范围说明书",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},388416,"（ ）不是管理干系人的输入",[146,148,150,152],{"key":20,"text":147,"correct":22},"问题日志",{"key":24,"text":149,"correct":26},"干系人管理计划",{"key":28,"text":151,"correct":26},"变更日志",{"key":31,"text":153,"correct":26},"沟通管理计划",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},388417,"项目经理编制了一份项目沟通计划。其主要内容包括项目干系人要求、发布信息的描述、传达信息所需的技术方法和沟通频次。这份计划中还欠缺的最主要内容是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"信息接收的个人和组织",{"key":24,"text":161,"correct":26},"沟通计划检查要求",{"key":28,"text":163,"correct":26},"沟通备忘录",{"key":31,"text":165,"correct":26},"干系人分析",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},388418,"从参与者的观点来看，（ ）沟通方式的参与程度最高。",[170,172,174,176],{"key":20,"text":171,"correct":26},"叙述",{"key":24,"text":173,"correct":26},"推销",{"key":28,"text":175,"correct":26},"征询",{"key":31,"text":177,"correct":22},"讨论",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},388419,"在了解和管理干系人期望时，可以采用多种分类方法对干系人进行分类管理。其中（ ）方法是根据干系人主动参与项目的程度改变项目计划或执行的能力分组。",[182,184,186,188],{"key":20,"text":183,"correct":26},"权力\u002F利益方格",{"key":24,"text":185,"correct":26},"权力\u002F影响方格",{"key":28,"text":187,"correct":22},"影响\u002F作用方格",{"key":31,"text":189,"correct":26},"凸显模型",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},388420,"项目经理80%甚至更多的时间都用于进行项目沟通工作。在项目的沟通管理计划中可以不包括（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"传达信息所需的技术或方法",{"key":24,"text":197,"correct":26},"沟通频率",{"key":28,"text":199,"correct":22},"干系人登记册",{"key":31,"text":201,"correct":26},"对要发布信息的描述",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},388421,"在某企业承建的一个信息系统集成项目中，建设方注重交付时间和质量，承建方公司老总注重项目利润，质量监控部经理注重项目的质量，人力资源部经理注重项目人力使用效率。下列围绕项目干系人管理的叙述错误的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":26},"各项目干系人的目标可能是相互矛盾的",{"key":24,"text":209,"correct":26},"在项目不同阶段，干系人的要求要有不同的优先级别",{"key":28,"text":211,"correct":22},"重点考虑客户要求，人力资源部经理意见可忽略",{"key":31,"text":213,"correct":26},"当质量、进度、成本目标发生矛盾时，项目经理要进行平衡",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},388422,"下面关于项目干系人管理的说法中，不正确的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":26},"项目干系人管理就是对项目的沟通进行管理，以满足信息需要者的需求并解决项目干系人之间的问题",{"key":24,"text":221,"correct":22},"项目干系人管理应由项目经理之外的职能经理负责",{"key":28,"text":223,"correct":26},"面对面的会议是最有效的沟通和解决干系人之间问题的方法",{"key":31,"text":225,"correct":26},"项目干系人也可以是项目团队成员之外参与项目的人员、其三大职责是参与、审查和反馈",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},388423,"币值波动、政治动荡、中央和地方政府之间的竞争，以及不同利益集团之间的冲突可能会干扰国际项目的管理。管理国际项目的项目经理应该意识到跨文化环境的主要影响因素，并特别重视（ ）",[230,232,234,236],{"key":20,"text":231,"correct":26},"建立绩效报告制度",{"key":24,"text":233,"correct":22},"建立沟通管理系统",{"key":28,"text":235,"correct":26},"建立和执行生产进度表以方便信息分配，避免在定期会面之间出现情况的变化",{"key":31,"text":237,"correct":26},"通过翻译服务起草正式的项目报告",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},388424,"与他人会谈以达成一致或者共识的过程被称为（ ）",[242,244,246,248],{"key":20,"text":243,"correct":26},"双赢",{"key":24,"text":245,"correct":22},"谈判",{"key":28,"text":247,"correct":26},"争取同意",{"key":31,"text":249,"correct":26},"对抗",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},388425,"在项目沟通过程中，会使用各种沟通方法。电子邮件沟通属于（ ）",[254,256,258,260],{"key":20,"text":255,"correct":26},"实时沟通",{"key":24,"text":257,"correct":22},"推式沟通",{"key":28,"text":259,"correct":26},"拉式沟通",{"key":31,"text":261,"correct":26},"情境式沟通",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},388426,"A公司承接了某银行网上银行系统的建设项目，包括应用软件开发、软硬件集配、系统运维等多项工作内容。针对该项目，不正确的是：（ ）",[266,268,270,272],{"key":20,"text":267,"correct":26},"项目的干系人包括客户、公司高层领导、项目成员以及网上银行用户",{"key":24,"text":269,"correct":22},"干系人管理工作应由该项目成员分工负责",{"key":28,"text":271,"correct":26},"干系人管理有助于为项目赢得更多的资源",{"key":31,"text":273,"correct":26},"通常来说，干系人对项目的影响能力在项目启动阶段最大，随着项目的进展逐渐减弱",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":20,"analysis":33},388427,"在进行（ ）时可以采用期望货币值技术。",[278,280,282,284],{"key":20,"text":279,"correct":22},"定量风险分析",{"key":24,"text":281,"correct":26},"风险紧急度评估",{"key":28,"text":283,"correct":26},"定性风险分析",{"key":31,"text":285,"correct":26},"SWOT分析",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":31,"analysis":33},388428,"风险预测一般是从风险发生的可能性和（ ）两个方面来评估风险",[290,292,294,296],{"key":20,"text":291,"correct":26},"风险发生的原因",{"key":24,"text":293,"correct":26},"风险监控技术",{"key":28,"text":295,"correct":26},"风险能否消除",{"key":31,"text":297,"correct":22},"风险发生所产生的后果",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},388429,"项目团队测量其执行风险响应计划的有效性是基于（ ）",[302,304,306,308],{"key":20,"text":303,"correct":22},"风险接受的阈值",{"key":24,"text":305,"correct":26},"风险得分",{"key":28,"text":307,"correct":26},"可能性\u002F冲击风险评价",{"key":31,"text":309,"correct":26},"项目总的风险级别",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},388430,"风险分析最简单的方法是（ ）",[314,316,318,320],{"key":20,"text":315,"correct":26},"概率分析",{"key":24,"text":317,"correct":22},"敏感性分析",{"key":28,"text":319,"correct":26},"德尔菲技术",{"key":31,"text":321,"correct":26},"效用理论",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":28,"analysis":33},388431,"在项目实施过程中，项目经理通过项目周报中的项目进度分析图表发现机房施工进度有延期风险。项目经理立即组织相关人员进行分析，下达了关于改进措施的书面指令。该指令属于（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":26},"检查措施",{"key":24,"text":329,"correct":26},"缺陷补救措施",{"key":28,"text":331,"correct":22},"预防措施",{"key":31,"text":333,"correct":26},"纠正措施",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":31,"analysis":33},388432,"下面（ ）不是风险审计的目标",[338,340,342,344],{"key":20,"text":339,"correct":26},"确定风险管理已经在项目的整个生命周期中实施",{"key":24,"text":341,"correct":26},"确定项目被管理好，风险被控制",{"key":28,"text":343,"correct":26},"协助在早期阶段鉴别项目的价值潜力的退化",{"key":31,"text":345,"correct":22},"确保被识别的和相当有威胁的每一个风险都有计算的预期值",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},388433,"通过概率和影响级别定义以及专家访谈，有助于纠正该过程所使用的数据中的偏差属于（ ）",[350,351,353,354],{"key":20,"text":283,"correct":22},{"key":24,"text":352,"correct":26},"识别风险",{"key":28,"text":279,"correct":26},{"key":31,"text":355,"correct":26},"风险监控",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":31,"analysis":33},388434,"你在从事为你的项目确立可能风险的工作，项目的目的是开发一种可口的营养猫食且该食品同时能作为汉堡包的增加剂。你想列出一个各种风险的清单以利于后面的定性及定量风险分析。虽然有一系列可用的技术，但在风险确定中经常使用的一个是（ ）",[360,362,364,366],{"key":20,"text":361,"correct":26},"访谈",{"key":24,"text":363,"correct":26},"可能性\u002F影响分析",{"key":28,"text":365,"correct":26},"检查表",{"key":31,"text":367,"correct":22},"头脑风暴",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":31,"analysis":33},388435,"一名项目经理正在为自己负责的项目进行风险量化。几位参与项目的专家都不在现场，但是希望参与项目风险评估工作。此时，可以（ ）。",[372,374,376,378],{"key":20,"text":373,"correct":26},"依托因特网，使用Monte Carlo模拟方法",{"key":24,"text":375,"correct":26},"使用关键路径法",{"key":28,"text":377,"correct":26},"对已知的专家进行非正式调查的方法",{"key":31,"text":379,"correct":22},"使用Delphi技术",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":24,"analysis":33},388436,"规划风险应对是针对项目目标，制订提高机会，降低威胁的方案和措施的过程。（ ）不是规划风险应对的工具与技术。",[384,386,388,390],{"key":20,"text":385,"correct":26},"应急应对策略",{"key":24,"text":387,"correct":22},"概率和影响矩阵",{"key":28,"text":389,"correct":26},"专家判断",{"key":31,"text":391,"correct":26},"消极风险或威胁的应对策略",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":28,"analysis":33},388437,"企业通过多年项目实施经验总结归纳出的IT项目可能出现的风险列表属于（ ）范畴。",[396,398,400,402],{"key":20,"text":397,"correct":26},"企业环境因素",{"key":24,"text":399,"correct":26},"定性分析技术",{"key":28,"text":401,"correct":22},"组织过程资产",{"key":31,"text":403,"correct":26},"风险规划技术",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":20,"analysis":33},388438,"在风险监控中，如果出现了风险登记单未预期的风险或“观察清单”未包含的风险，应该（ ）。",[408,410,412,414],{"key":20,"text":409,"correct":22},"进行额外的风险应对规划",{"key":24,"text":411,"correct":26},"进行风险审计",{"key":28,"text":413,"correct":26},"进行变差和趋势分析",{"key":31,"text":415,"correct":26},"召开状态审查会",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":20,"analysis":33},388439,"WBS应该被用于风险识别过程，因为它（ ）",[420,422,424,426],{"key":20,"text":421,"correct":22},"确定所有要做的工作，因此，能帮助识别潜在的危险源",{"key":24,"text":423,"correct":26},"确定所有要做的工作，因此，包括项目所有的风险",{"key":28,"text":425,"correct":26},"帮助组织项目所要完成的所有工作",{"key":31,"text":427,"correct":26},"确定工作包，这将使分配特定的责任成为可能",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":24,"analysis":33},388440,"人们对风险事件都有一定的承受能力，当（ ）时，人们愿意承担的风险越大。",[432,434,436,438],{"key":20,"text":433,"correct":26},"项目活动投入的越多",{"key":24,"text":435,"correct":22},"项目的收益越大",{"key":28,"text":437,"correct":26},"个人、组织拥有的资源越少",{"key":31,"text":439,"correct":26},"组织中高级别管理人员相对较少",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":31,"analysis":33},388441,"风险识别的方式从专家争执中收集意见并综合，从而对将来的可能风险做出预测的风险识别工具是（ ）。",[444,446,447,449],{"key":20,"text":445,"correct":26},"风险分解结构",{"key":24,"text":367,"correct":26},{"key":28,"text":448,"correct":26},"SWOT",{"key":31,"text":450,"correct":22},"德尔菲法",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":31,"analysis":33},388442,"在一个信息系统集成项目中，对项目涉及的客户端、服务器、网络和运行环境等进行集成时，不确定会遇到什么问题，这对项目来说是一个风险，因此项目经理计划找一个以前有相关技术经验的专家来处理这个风险。该应对措施属于（ ）。",[455,457,459,461],{"key":20,"text":456,"correct":26},"风险接受",{"key":24,"text":458,"correct":26},"风险转移",{"key":28,"text":460,"correct":26},"风险规避",{"key":31,"text":462,"correct":22},"风险减轻",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":24,"analysis":33},388443,"在管理当前项目的时候，重要的是使用以前的项目教训来改进机构的项目管理过程。因此，在项目结束过程中，重要的是评审（ ）",[467,469,471,473],{"key":20,"text":468,"correct":26},"发生的二级风险",{"key":24,"text":470,"correct":22},"风险识别清单",{"key":28,"text":472,"correct":26},"WBS词典",{"key":31,"text":474,"correct":26},"队员的履历表",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":31,"analysis":33},388444,"（ ）不属于风险识别的依据。",[479,481,483,485],{"key":20,"text":480,"correct":26},"成本管理计划",{"key":24,"text":482,"correct":26},"范围基准",{"key":28,"text":484,"correct":26},"采购文件",{"key":31,"text":486,"correct":22},"风险类别",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":24,"analysis":33},388445,"关于合同管理的描述，不正确的是，（） ①合同管理包括：合同签订管理、合同履行管理、合同变更管理、合同档案管理、 合同违约的索赔管理合 ②对于合同中需要变更、转让、解除等内容应有详细说明 ③如果合同中有附件，对于附件的内容也应精心准备，当主合同与附件产矛盾时， 以附件为主 ④为了使签约各方对合同有一致的理解，合同一律使用行业标准合同 ⑤签订合同前应了解相关环境，做出正确的风险分析判断",[491,493,495,497],{"key":20,"text":492,"correct":26},"①②",{"key":24,"text":494,"correct":22},"③④",{"key":28,"text":496,"correct":26},"②⑤",{"key":31,"text":498,"correct":26},"①⑤",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":24,"analysis":33},388446,"合同内容是当事人订立合同时的各项合同条款。合同的主要内容包括（）。 ①当事人各自的权利、义务 ②项目费用及工程款的支付方式 ③项目变更约定 ④违约责任 ⑤保密约定",[503,505,507,509],{"key":20,"text":504,"correct":26},"①②④",{"key":24,"text":506,"correct":22},"①②③④⑤",{"key":28,"text":508,"correct":26},"①②③⑤",{"key":31,"text":510,"correct":26},"②③④",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":20,"analysis":33},388447,"合同类型的选择取决于风险的程度或者项目经理面临的不确定性。从买方的角度来看，适宜的低风险合同类型是（ ）",[515,517,519,521],{"key":20,"text":516,"correct":22},"固定价格合同",{"key":24,"text":518,"correct":26},"固定酬金合同",{"key":28,"text":520,"correct":26},"成本加固定酬金合同",{"key":31,"text":522,"correct":26},"成本加成本比例合同",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":31,"analysis":33},388448,"某公司按总价合同方式约定订购3000米高规格的铜缆，由于建设单位原因，工期暂停了半个月，待恢复施工后，承建单位以近期铜价上涨为理由，要求建设单位赔偿购买电缆增加的费用，并要求适当延长工期，以下说法中，（ ）是正确的。",[527,529,531,533],{"key":20,"text":528,"correct":26},"建设单位应该赔偿承建单位采购电缆增加的费用",{"key":24,"text":530,"correct":26},"监理单位应该保护承建单位的合法利益，因此应该支持承建单位的索赔要求",{"key":28,"text":532,"correct":26},"索赔是合同双方利益的体现，可以使项目造价更趋于合理",{"key":31,"text":534,"correct":22},"铜价上涨是承建单位应承担的项目风险，不应该要求赔偿费用",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":28,"analysis":33},388449,"你负责保证你的供货商正确履行合同。为了对合同进行有效的管理，你应该（ ）",[539,541,543,545],{"key":20,"text":540,"correct":26},"举行投标人会议",{"key":24,"text":542,"correct":26},"选择合理的合同形式",{"key":28,"text":544,"correct":22},"执行合同变更控制制度",{"key":31,"text":546,"correct":26},"准备工作陈述",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":20,"analysis":33},388450,"某项目在启动阶段难以确定所需要的人员和资源，需要在实施过程中动态增加较多人员、专家和外部资源。在为该项目制订采购计划时需要确定采购合同类型，最适合该项目的合同类型是（ ）。",[551,553,554,556],{"key":20,"text":552,"correct":22},"时间和材料合同",{"key":24,"text":520,"correct":26},{"key":28,"text":555,"correct":26},"成本补偿合同",{"key":31,"text":557,"correct":26},"固定总价合同",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":20,"analysis":33},388451,"某电信企业要建设一个CRM系统（包括呼叫中心和客服中心），系统集成一级资质企业甲和系统集成二级资质企业乙参与该系统建设。关于合同的签订，下面说法中，（ ）是正确的。",[562,564,566,568],{"key":20,"text":563,"correct":22},"如电信企业和乙签订CRM建设总包合同，则乙和甲就呼叫中心的建设只能签订分包合同",{"key":24,"text":565,"correct":26},"如电信企业和乙签订客服中心建设总包合同，则电信企业和甲就CRM的建设只能签订总价合同",{"key":28,"text":567,"correct":26},"如电信企业和乙签订客服中心建设单项承包合同，则电信企业和甲就CRM的建设只能签订单项承包合同",{"key":31,"text":569,"correct":26},"如果电信企业和甲签订CRM建设总价合同，则甲和乙就呼叫中心的建设只能签订单价合同",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":24,"analysis":33},388452,"下面关于索赔的说法中，不正确的是（ ）。",[574,576,578,580],{"key":20,"text":575,"correct":26},"按照索赔的目的进行划分，索赔可以分为工期索赔和费用索赔",{"key":24,"text":577,"correct":22},"项目发生索赔事件后，应先由监理工程师调解，若调解不成，则须由政府建设主管机构进行调解或仲载后，方可向所在地人民法院起诉",{"key":28,"text":579,"correct":26},"索赔必须以合同为依据",{"key":31,"text":581,"correct":26},"索赔的重要前提条件是合同一方或双方存在违约行为和事实，并且由此造成损失，责任应由对方承担",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":28,"analysis":33},388453,"卖方或者买方部分或者全部没有履行合同义务属于（ ）",[586,588,590,592],{"key":20,"text":587,"correct":26},"合同终止",{"key":24,"text":589,"correct":26},"部分履行",{"key":28,"text":591,"correct":22},"违反合同",{"key":31,"text":593,"correct":26},"合同弃权",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":20,"analysis":33},388454,"在某些情况下，合同终止指（ ）",[598,600,602,604],{"key":20,"text":599,"correct":22},"双方同意终止合同",{"key":24,"text":601,"correct":26},"交付产品或者提供服务结束合同",{"key":28,"text":603,"correct":26},"正确履行合同从而结束合同",{"key":31,"text":605,"correct":26},"确认最终付款",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":28,"analysis":33},388455,"某通信设备采购项目，签订合同后进入了合同履行阶段，以下（ ）做法是不合理的",[610,612,614,616],{"key":20,"text":611,"correct":26},"合同履行过程中发现处于支付的通信设备的质量及验收要求约定不明确，双方进行商议后以补充协议进行了规定",{"key":24,"text":613,"correct":26},"由于采购方不具备接收通信设备的条件，要求供货方延迟货物的交付，到了实际交付时，由于该通信设备的价格涨价，供货方要求变更合同价格",{"key":28,"text":615,"correct":22},"通信设备在运输至采购方的过程中，遇到了连续的暴雨天气无法按时交付，采购方认为合同中没有对应的免责条款，对供货方进行经济索赔",{"key":31,"text":617,"correct":26},"合同双方在履行过程中产生了纠纷，双方无法协调一致，因此向仲裁机构提出了仲裁申请。",[619,623,626,629,632,635],{"id":620,"name":621,"category":7,"favorite":622},136,"法律职业试卷二(客观题 )",2,{"id":624,"name":625,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":627,"name":628,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":630,"name":631,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":633,"name":634,"category":7,"favorite":8},28,"安全工程师",{"id":636,"name":637,"category":7,"favorite":8},112,"安全生产法律知识"]