[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-37":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":605},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,37,50,1856,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,247,259,271,283,295,307,319,331,341,351,363,375,387,398,408,419,431,443,454,466,478,489,501,513,525,537,547,559,571,583,595],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},390029,1,"单选题","一个组织中有很多类型的分解结构，项目组在分解WBS时，（ ）可以帮助项目组考虑并确定所分解的工作包由哪些成员来执行。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","组织分解结构(OBS)",true,{"key":24,"text":25,"correct":26},"B","物料清单(BOM)",false,{"key":28,"text":29,"correct":26},"C","风险分解结构(RBS)",{"key":31,"text":32,"correct":26},"D","过程分解结构(PBS)","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},390030,"小李所负责的项目已经完成了20%。最近一次的挣值分析结果显示，成本绩效指数（CPI）为0.67，进度绩效指数（SPI）为0.87。在这种情况下，小李应该 （ ） 。",[38,40,42,44],{"key":20,"text":39,"correct":26},"实施额外的资源计划编制，增加资源，并且在需要的时候进行超时工作，以完成已预算好的工作量",{"key":24,"text":41,"correct":26},"为进度重新设定基准，然后使用蒙特卡罗分析",{"key":28,"text":43,"correct":22},"实施风险应对审计以帮助控制风险",{"key":31,"text":45,"correct":26},"更新风险的识别、定性风险分析和定量风险分析",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},390031,"项目整体绩效评估中风险评估是一个十分重要的技术。风险评估不是简单的凭空想象，必须（ ）后才能方便操作。",[50,52,54,56],{"key":20,"text":51,"correct":26},"制定风险管理计划",{"key":24,"text":53,"correct":26},"风险识别",{"key":28,"text":55,"correct":26},"风险定性分析",{"key":31,"text":57,"correct":22},"风险定量分析",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},390032,"下图是某项目成本风险的蒙特卡罗分析图。以下说法中不正确的是 （ ） 。",[62,64,66,68],{"key":20,"text":63,"correct":26},"蒙特卡罗分析法也叫随机模拟法",{"key":24,"text":65,"correct":26},"该图用于风险分析时，可以支持定量分析",{"key":28,"text":67,"correct":22},"根据该图，41万元完成的概率是12%，如果要达到75%的概率，需要增加5.57万元作为应急储备",{"key":31,"text":69,"correct":26},"该图显示，用45万元的成本也可能完成计划",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},390033,"下面是管理项目时可能出现的四种风险。从客户的角度来看，如果没有管理好 ______ ，将会造成最长久的影响。",[74,76,78,80],{"key":20,"text":75,"correct":26},"人力资源风险",{"key":24,"text":77,"correct":26},"进度计划风险",{"key":28,"text":79,"correct":26},"费用风险",{"key":31,"text":81,"correct":22},"质量风险",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},390034,"下列工程项目风险事件中， （ ） 属于技术性风险因素。",[86,88,90,92],{"key":20,"text":87,"correct":26},"新材料供货不足",{"key":24,"text":89,"correct":22},"设计时未考虑施工要求",{"key":28,"text":91,"correct":26},"索赔管理不力",{"key":31,"text":93,"correct":26},"合同条款表达有歧义",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},390035,"下列报告中，不属于信息安全风险评估识别阶段的是",[98,100,102,104],{"key":20,"text":99,"correct":26},"资产价值分析报告",{"key":24,"text":101,"correct":22},"风险评估报告",{"key":28,"text":103,"correct":26},"威胁分析报告",{"key":31,"text":105,"correct":26},"已有安全措施分析报告",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},390036,"软件项目中，技术风险威胁到要开发软件的质量及交付时间，而（ ） 不属于技术风险。",[110,112,114,116],{"key":20,"text":111,"correct":22},"采用先进技术开发目前尚无用户真正需要的产品或系统",{"key":24,"text":113,"correct":26},"软件需要使用新的或未经证实的硬件接口",{"key":28,"text":115,"correct":26},"产品需求中要求开发某些程序构件，这些构件与以前所开发的构件完全不同",{"key":31,"text":117,"correct":26},"需求中要求使用新的分析、设计或测试方法",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},390037,"企业将某些业务外包，可能会给发包企业带来一些风险，这些风险不包括 （ ） 。",[122,124,126,128],{"key":20,"text":123,"correct":26},"与客户联系减少进而失去客户",{"key":24,"text":125,"correct":22},"企业业务转型",{"key":28,"text":127,"correct":26},"企业内部知识流失",{"key":31,"text":129,"correct":26},"服务质量降低",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},390038,"某项目经理刚刚完成了项目的风险应对计划， （ ） 应该是风险管理的下一步措施。",[134,136,138,140],{"key":20,"text":135,"correct":26},"确定项目整体风险的等级",{"key":24,"text":137,"correct":26},"开始分析那些在产品文档中发现的风险",{"key":28,"text":139,"correct":22},"在工作分解结构上增加任务",{"key":31,"text":141,"correct":26},"进行风险审核",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},390039,"某系统集成企业为做好项目风险管理，给风险定义了3个参数。①风险严重性：指风险对项目造成的危害程度；②风险可能性：指风险发生的几率；③风险系数：是风险严重性和风险可能性的乘积。其中，对项目进度延误、工作量偏差的风险严重性等级和风险可行性等级如下表所示：假定该企业将风险系数大于等于10的情况定义为红灯状态，需要优先处理，则下列 （ ） 的情况属于红灯状态。",[146,148,150,152],{"key":20,"text":147,"correct":26},"进度延误15%，工作量偏差15%，发生几率为0.5",{"key":24,"text":149,"correct":26},"进度延误15%，工作量偏差35%，发生几率为0.2",{"key":28,"text":151,"correct":22},"进度延误25%，工作量偏差15%，发生几率为0.4",{"key":31,"text":153,"correct":26},"进度延误15%，工作量偏差25%，发生几率为0.4",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},390040,"某系统集成企业为做好项目风险管理，定义了如下图所示的风险管理过程，以及过程中的参与人员，按照风险管理的要求来说，下图空缺位置应该填写的内容是 （ ） 。",[158,160,162,164],{"key":20,"text":159,"correct":26},"①项目经理②风险规避",{"key":24,"text":161,"correct":26},"①风险负责人②风险解决",{"key":28,"text":163,"correct":22},"①项目组成员②风险跟踪",{"key":31,"text":165,"correct":26},"①风险管理小组②风险减轻",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},390041,"某系统集成企业迫于经营的压力，承接了一个极具技术风险的项目，该项目的项目经理为此：调用了公司最有能力的人力资源，组织项目组核心团队成员培训，与该项目技术领域最强的研究团队签订项目技术分包协议，从项目风险管理的角度来看，该项目经理采取了（ ） 的应对策略。",[170,172,174,176],{"key":20,"text":171,"correct":26},"应急分享",{"key":24,"text":173,"correct":22},"正向风险",{"key":28,"text":175,"correct":26},"转移风险",{"key":31,"text":177,"correct":26},"负面风险",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},390042,"借助专家评审等技术，对项目风险的概率和影响程度进行风险级别划分属于 （ ） 过程的技术。",[182,184,186,188],{"key":20,"text":183,"correct":26},"风险应对计划编制",{"key":24,"text":185,"correct":26},"风险分类",{"key":28,"text":187,"correct":22},"定性风险分析",{"key":31,"text":189,"correct":26},"定量风险分析",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},390043,"既可能带来机会、获得利益，又隐含威胁、造成损失的风险，称为（）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"可预测风险",{"key":24,"text":197,"correct":26},"人为风险",{"key":28,"text":199,"correct":22},"投机风险",{"key":31,"text":201,"correct":26},"可管理风险",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},390044,"关于风险识别的叙述中， （ ） 是不正确的。",[206,208,210,212],{"key":20,"text":207,"correct":22},"风险识别不包括识别项目风险可能引起的后果和这种后果的严重程度",{"key":24,"text":209,"correct":26},"项目风险识别包括识别项目的可能收益",{"key":28,"text":211,"correct":26},"风险识别过程需要将这些风险的特征形成文档",{"key":31,"text":213,"correct":26},"项目风险识别是一个不断重复的过程",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},390045,"风险预测一般是从风险发生的可能性和 （ ） 两个方面来评估风险。",[218,220,222,224],{"key":20,"text":219,"correct":26},"风险发生的原因",{"key":24,"text":221,"correct":26},"风险监控技术",{"key":28,"text":223,"correct":26},"风险能否消除",{"key":31,"text":225,"correct":22},"风险发生所产生的后果",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},390046,"风险识别中信息收集的技术是（ ）",[230,232,234,236],{"key":20,"text":231,"correct":22},"德尔菲技术",{"key":24,"text":233,"correct":26},"核对表分析",{"key":28,"text":235,"correct":26},"假设分析",{"key":31,"text":237,"correct":26},"文档审查",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},390047,"风险紧迫性评估多用于 （ ） 中。",[242,243,244,245],{"key":20,"text":53,"correct":26},{"key":24,"text":187,"correct":22},{"key":28,"text":189,"correct":26},{"key":31,"text":246,"correct":26},"风险应对",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":31,"analysis":33},390048,"风险监控的输出不包括（ ） 。",[251,253,255,257],{"key":20,"text":252,"correct":26},"建议的纠正措施",{"key":24,"text":254,"correct":26},"新发现的风险",{"key":28,"text":256,"correct":26},"新的风险管理知识",{"key":31,"text":258,"correct":22},"批准的变更请求",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":20,"analysis":33},390049,"风险定量分析是在不确定情况下进行决策的一种量化方法，该过程经常采用的技术有（ ） 。",[263,265,267,269],{"key":20,"text":264,"correct":22},"蒙特卡罗分析法",{"key":24,"text":266,"correct":26},"SWOT分析法",{"key":28,"text":268,"correct":26},"检查表分析法",{"key":31,"text":270,"correct":26},"预测技术",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":31,"analysis":33},390050,"对项目目标存在消极影响的风险或威胁，下列说法不正确的是（ ）",[275,277,279,281],{"key":20,"text":276,"correct":26},"延长进度或减少范围采取的是回避措施",{"key":24,"text":278,"correct":26},"履约保证书采取的是转移措施",{"key":28,"text":280,"correct":26},"设计时在子系统中设置冗余组件减轻组件故障所造成的影响是减轻措施",{"key":31,"text":282,"correct":22},"以上都不正确",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":24,"analysis":33},390051,"定性风险分析工具和技术不包括（）。",[287,289,291,293],{"key":20,"text":288,"correct":26},"概率及影响矩阵",{"key":24,"text":290,"correct":22},"建模技术",{"key":28,"text":292,"correct":26},"风险紧急度评估",{"key":31,"text":294,"correct":26},"风险数据质量评估",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":24,"analysis":33},390052,"德尔菲技术是一种风险识别技术，它 （ ） 。",[299,301,303,305],{"key":20,"text":300,"correct":26},"对定义特定变量发生的概率尤其有用",{"key":24,"text":302,"correct":22},"对减少数据中人为的偏见、防止任何人对结果不适当地产生过大的影响尤其有用",{"key":28,"text":304,"correct":26},"有助于将决策者对待风险的态度考虑在内",{"key":31,"text":306,"correct":26},"为决策者提供一系列图形化的决策方案",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":28,"analysis":33},390053,"德尔菲技术是一种非常有用的风险识别方法，其主要优势在于 （ ） 。",[311,313,315,317],{"key":20,"text":312,"correct":26},"可以明确表示出特定变量出现的概率",{"key":24,"text":314,"correct":26},"能够为决策者提供一系列图表式的决策选择",{"key":28,"text":316,"correct":22},"减少分析过程中的偏见，防止任何个人对结果施加不当的过大影响",{"key":31,"text":318,"correct":26},"有助于综合考虑决策者对风险的态度",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":28,"analysis":33},390054,"当项目碰到积极风险的时候组织希望确保机会得以实现，该策略是（ ）",[323,325,327,329],{"key":20,"text":324,"correct":26},"接受",{"key":24,"text":326,"correct":26},"分享",{"key":28,"text":328,"correct":22},"开拓",{"key":31,"text":330,"correct":26},"提高",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":20,"analysis":33},390055,"按优先级或相对等级排列项目风险，属于 （ ） 的输出。",[335,336,337,339],{"key":20,"text":187,"correct":22},{"key":24,"text":189,"correct":26},{"key":28,"text":338,"correct":26},"风险管理计划",{"key":31,"text":340,"correct":26},"风险监视表",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":24,"analysis":33},390056,"( )指通过考虑风险发生的概率及风险发生后对项目目标及其他因素的影响，对已识别风险的优先级进行评估。",[345,347,348,350],{"key":20,"text":346,"correct":26},"风险管理",{"key":24,"text":187,"correct":22},{"key":28,"text":349,"correct":26},"风险控制",{"key":31,"text":183,"correct":26},{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":20,"analysis":33},390057,"（ ）不属于风险识别阶段的成果。",[355,357,359,361],{"key":20,"text":356,"correct":22},"低优先级风险的监视表",{"key":24,"text":358,"correct":26},"己识别出的风险列表",{"key":28,"text":360,"correct":26},"风险征兆或警告信号",{"key":31,"text":362,"correct":26},"潜在的风险应对方法列表",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":24,"analysis":33},390058,"（ ） 提供了一种结构化方法以便使风险识别的过程系统化、全面化，保证组织能够在一个统一的框架下进行风险识别，目的是提高风险识别的质量和有效性。",[367,369,371,373],{"key":20,"text":368,"correct":26},"风险影响力评估",{"key":24,"text":370,"correct":22},"风险类别",{"key":28,"text":372,"correct":26},"风险概率分析",{"key":31,"text":374,"correct":26},"风险管理的角色界定",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":28,"analysis":33},390059,"（ ） 不属于风险应对计划的内容。",[379,381,383,385],{"key":20,"text":380,"correct":26},"对已识别的风险进行描述和定义",{"key":24,"text":382,"correct":26},"应对策略实施后，期望的残留风险水平",{"key":28,"text":384,"correct":22},"应对策略实施后，项目管理人员的表现",{"key":31,"text":386,"correct":26},"风险应对预算和时间备用安排",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":28,"analysis":33},390060,"（ ）是指对定性风险分析过程中作为对项目需求存在潜在重大影响而排序在先的风险进行分析。",[391,392,394,396],{"key":20,"text":53,"correct":26},{"key":24,"text":393,"correct":26},"定性分析",{"key":28,"text":395,"correct":22},"定量分析",{"key":31,"text":397,"correct":26},"制定应急计划",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":24,"analysis":33},390061,"（ ）是检查并记录风险应对措施在处理已识别风险及其根源方面的有效性，以及风险管理过程的有效性。",[402,403,405,406],{"key":20,"text":53,"correct":26},{"key":24,"text":404,"correct":22},"风险审计",{"key":28,"text":246,"correct":26},{"key":31,"text":407,"correct":26},"风险规划",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":31,"analysis":33},390062,"（ ）不属于风险管理计划编制的成果。",[412,413,415,417],{"key":20,"text":370,"correct":26},{"key":24,"text":414,"correct":26},"风险概率",{"key":28,"text":416,"correct":26},"风险影响力的定义",{"key":31,"text":418,"correct":22},"风险记录",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":24,"analysis":33},390063,"项目经理在某项目实施阶段的中期发现，由于未预料到的变更，项目经费要花光了，此时应 （ ）",[423,425,427,429],{"key":20,"text":424,"correct":26},"对项目进行赶工或快速跟进",{"key":24,"text":426,"correct":22},"重新评估风险分析结果和应急资金",{"key":28,"text":428,"correct":26},"要求对项目预算做变更",{"key":31,"text":430,"correct":26},"使用不对项目收费的资源",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":24,"analysis":33},390064,"项目风险识别是指找出影响项目目标顺利实现的主要风险因素，并识别出这些风险究竟有哪些基本特征、可能会影响到项目的哪些方面等问题。以下关于项目风险识别的叙述中，正确的是（ ）",[435,437,439,441],{"key":20,"text":436,"correct":26},"主要由项目经理负责项目风险识别活动",{"key":24,"text":438,"correct":22},"风险识别是一种系统活动，而不是一次性行为",{"key":28,"text":440,"correct":26},"主要识别项目的内在风险",{"key":31,"text":442,"correct":26},"风险识别包括外在因素对项目本身可能造成的影响评估",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":28,"analysis":33},390065,"（ ）提供了一种结构化方法以便使风险识别的过程系统化、全面化，使组织能够在统一的框架下进行风险识别，提高组织风险识别的质量。",[447,449,451,452],{"key":20,"text":448,"correct":26},"帕累托图",{"key":24,"text":450,"correct":26},"检查表",{"key":28,"text":370,"correct":22},{"key":31,"text":453,"correct":26},"概率影响矩阵",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":24,"analysis":33},390066,"项目经理在6月1日对一个软件开发项目进行了挣值分析，项目CPI是1.0，进度偏差是0，在6月3日，附近的河流泛滥，致使开发计算机机房被淹，导致所有工作停工两周时间。该项目遭受了 （ ） 。",[458,460,462,464],{"key":20,"text":459,"correct":26},"已知的可预测风险",{"key":24,"text":461,"correct":22},"已知的不可预测风险",{"key":28,"text":463,"correct":26},"未知的可预测风险",{"key":31,"text":465,"correct":26},"未知的不可预测风险",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":31,"analysis":33},390067,"李工是一个投资300万的产品开发项目的项目经理。项目已经进入执行阶段，时间，预算和规范方面都符合要求。某天，一名项目团队成员就报纸的一篇报道提醒李工注意。该报道详细说明了产品原型中使用的材料存在非常高的缺陷率。在此之前，李工对材料的质量没有产生过任何怀疑。此时，李工应该采取的第一措施是 （ ） 。",[470,472,474,476],{"key":20,"text":471,"correct":26},"停止原型工作",{"key":24,"text":473,"correct":26},"对风险进行量化",{"key":28,"text":475,"correct":26},"制订风险缓解计划",{"key":31,"text":477,"correct":22},"确定权变措施",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":31,"analysis":33},390068,"项目管理方法的核心是目标管理与 （ ） 相结合。",[482,484,486,488],{"key":20,"text":483,"correct":26},"技术管理",{"key":24,"text":485,"correct":26},"质量管理",{"key":28,"text":487,"correct":26},"投资管理",{"key":31,"text":346,"correct":22},{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":28,"analysis":33},390069,"风险的成本估算完成后，可以针对风险表中的每个风险计算其风险曝光度。某软件小组计划项目中采用60个可复用的构件，每个构件平均是 100LO C，每个LOC的成本是13元人民币。下面是该小组定义的一个项目风险：1．风险识别：预定要复用的软件构件中只有60%将被集成到应用中，剩余功能必须定制开发2．风险概率：50%3．该项目风险的风险曝光度是 （ ） 。",[493,495,497,499],{"key":20,"text":494,"correct":26},"23400",{"key":24,"text":496,"correct":26},"65000",{"key":28,"text":498,"correct":22},"15600",{"key":31,"text":500,"correct":26},"19500",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":31,"analysis":33},390070,"下列说法错误的是（ ）",[505,507,509,511],{"key":20,"text":506,"correct":26},"定性风险分析采用的工具和技术有：风险概率与影响评估，概率和影响矩阵和风险数据质量评估。",{"key":24,"text":508,"correct":26},"定性风险分析包括为了采取进一步行动，对已识别风险进行优先排序的方法，例如，定量风险分析或风险应对规划。",{"key":28,"text":510,"correct":26},"定量风险分析是指对定性风险分析过程中作为对项目需求存在潜在重大影响而排序在先的风险进行分析。",{"key":31,"text":512,"correct":22},"定量风险分析的工具与技术包括：敏感性分析、EMV和会议",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":28,"analysis":33},390071,"在软件项目开发过程中，评估软件项目风险时，一般不考虑 （ ） 。",[517,519,521,523],{"key":20,"text":518,"correct":26},"高级管理人员是否正式承诺支持该项目",{"key":24,"text":520,"correct":26},"开发人员和用户是否充分理解系统的需求",{"key":28,"text":522,"correct":22},"最终用户是否同意部署已开发的系统",{"key":31,"text":524,"correct":26},"开发需要的资金是否能按时到位",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":31,"analysis":33},390072,"某系统集成企业迫于经营的压力，承接了一个极具技术风险的项目，该项目的项目经理为此：调用了公司最有能力的人力资源，组织项目组核心团队成员培训，与该项目技术领域最强的研究团队签订项目技术分包协议，从项目风险管理的角度来看，该项目经理采取了 （ ） 风险应对措施",[529,531,533,535],{"key":20,"text":530,"correct":26},"转移、分享、提高",{"key":24,"text":532,"correct":26},"开拓、接受、提高",{"key":28,"text":534,"correct":26},"减轻、分享、规避",{"key":31,"text":536,"correct":22},"开拓、分享、强大",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":20,"analysis":33},390073,"在定性风险分析中，使用定性分析将风险发生的概率及其后果描述为极高、高、中、低、极低5级，此种分析方法称为 （ ）",[541,543,544,545],{"key":20,"text":542,"correct":22},"风险概率及影响评估",{"key":24,"text":294,"correct":26},{"key":28,"text":185,"correct":26},{"key":31,"text":546,"correct":26},"风险数据收集",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":28,"analysis":33},390074,"以下关于信息系统项目风险的叙述中，不正确的是（ ） 。",[551,553,555,557],{"key":20,"text":552,"correct":26},"信息系统项目风险是一种不确定性或条件，一旦发生，会对项目目标产生积极或消极的影响",{"key":24,"text":554,"correct":26},"信息系统项目风险既包括对项目目标的威胁，也包括促进项目目标的机会",{"key":28,"text":556,"correct":22},"具有不确定性的事件是信息系统项目风险定义的充分条件",{"key":31,"text":558,"correct":26},"信息系统项目的已知风险是那些已经经过识别和分析的风险，其后果亦可预见",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":31,"analysis":33},390075,"在信息系统试运行阶段，系统失效将对业务造成影响。针对该风险，如果采取“接受”的方式进行应对，应该 （ ） 。",[563,565,567,569],{"key":20,"text":564,"correct":26},"签订一份保险合同，减轻中断带来的损失",{"key":24,"text":566,"correct":26},"找出造成系统中断的各种因素，利用帕累托分析减轻和消除主要因素",{"key":28,"text":568,"correct":26},"设置冗余系统",{"key":31,"text":570,"correct":22},"建立相应的应急储备",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":31,"analysis":33},390076,"一名项目经理正在为自己负责的项目进行风险量化。几位参与项目的专家都不在现场，但是希望参与项目风险评估工作。此时，可以 （ ） 。",[575,577,579,581],{"key":20,"text":576,"correct":26},"A. 依托因特网，使用Montearlo模拟方法",{"key":24,"text":578,"correct":26},"使用关键路径方法",{"key":28,"text":580,"correct":26},"对已知的专家进行非正式的调查的方法",{"key":31,"text":582,"correct":22},"使用Delphi技术",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":31,"analysis":33},390077,"德尔菲技术作为风险识别的一种方法，主要用途是 （ ） 。",[587,589,591,593],{"key":20,"text":588,"correct":26},"为决策者提供图表式的决策选择次序",{"key":24,"text":590,"correct":26},"确定具体偏差出现的概率",{"key":28,"text":592,"correct":26},"有助于将决策者对风险的态度考虑进去",{"key":31,"text":594,"correct":22},"减少分析过程中的偏见，防止任何人对事件结果施加不正确的影响",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":31,"analysis":33},390078,"权变措施是在风险管理的 （ ） 过程确定的。",[599,600,601,603],{"key":20,"text":53,"correct":26},{"key":24,"text":189,"correct":26},{"key":28,"text":602,"correct":26},"风险应对规划",{"key":31,"text":604,"correct":22},"风险监控",[606,610,613,616,619,622],{"id":607,"name":608,"category":7,"favorite":609},136,"法律职业试卷二(客观题 )",2,{"id":611,"name":612,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":614,"name":615,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":617,"name":618,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":620,"name":621,"category":7,"favorite":8},28,"安全工程师",{"id":623,"name":624,"category":7,"favorite":8},112,"安全生产法律知识"]