[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-36":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":599},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,36,50,1856,[13,34,46,58,70,82,94,106,118,130,142,150,161,172,184,196,207,219,231,241,253,265,277,289,301,313,322,334,346,354,366,378,389,401,409,421,433,445,457,469,481,493,505,517,529,541,553,565,575,587],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},389979,1,"单选题","某项目在招标时被分成若干个项目包，分别发包给不同的承包人，承包人中标后与招标人签订的合同属于（ ）",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","单项项目承包合同",true,{"key":24,"text":25,"correct":26},"B","分包合同",false,{"key":28,"text":29,"correct":26},"C","单价合同",{"key":31,"text":32,"correct":26},"D","成本激励合同","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},389980,"合同可以变更，但是当事人对合同变更的内容约定不明确的，推定为 （ ） 。",[38,40,42,44],{"key":20,"text":39,"correct":26},"变更为可撤销",{"key":24,"text":41,"correct":26},"部分变更",{"key":28,"text":43,"correct":26},"已经变更",{"key":31,"text":45,"correct":22},"未变更",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},389981,"合同收尾过程涉及______ 。",[50,52,54,56],{"key":20,"text":51,"correct":26},"客户满意度分析和最终付款",{"key":24,"text":53,"correct":26},"管理收尾和档案保存",{"key":28,"text":55,"correct":26},"向承包商最终付款和整理经验",{"key":31,"text":57,"correct":22},"产品验收和管理收尾",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},389982,"以下内容中， （ ） 是采购计划编制的工具与技术 ①专家判断 ②项目范围说明书 ③自制\u002F外购分析 ④项目章程 ⑤合同类型",[62,64,66,68],{"key":20,"text":63,"correct":26},"①②③",{"key":24,"text":65,"correct":22},"①③⑤",{"key":28,"text":67,"correct":26},"①②③④",{"key":31,"text":69,"correct":26},"②③④⑤",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},389983,"以下关于外包及外包管理的叙述中。 （ ） 是不正确的",[74,76,78,80],{"key":20,"text":75,"correct":26},"外包是企业利用外部的专业资源为己服务，从而达到降低成本、提高效率、充分发挥自身核心竞争力的一种商业模式",{"key":24,"text":77,"correct":26},"软件外包管理的总目标是用强有力的手段来管理同时进行的众多外包项目，满足进度、质量、成本的要求",{"key":28,"text":79,"correct":22},"承包商是软件外包部分的第一责任人，故质量保证活动应由承包商独立完成",{"key":31,"text":81,"correct":26},"委托方根据合同的承诺跟踪承包商实际完成情况和成果",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},389984,"以下关于外包和外包管理的叙述中，不正确的是（ ） 。",[86,88,90,92],{"key":20,"text":87,"correct":26},"外包是为了专注发展企业的核心竞争力，将其它的职能都外包给具有成本和技术优势的第三方供应商（或业务流程外包商）。",{"key":24,"text":89,"correct":26},"将以前内部自行管理的领域外包后，该领域的整体品质有可能会降低",{"key":28,"text":91,"correct":26},"需要根据合同的承诺跟踪承包商实际完成的情况和成果",{"key":31,"text":93,"correct":22},"从外包风险管理的角度考虑，应尽可能将项目外包给同一家供应商",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},389985,"以下关于采购工作说明书的叙述中， （ ） 是错误的。",[98,100,102,104],{"key":20,"text":99,"correct":22},"采购说明书与项目范围基准没有关系",{"key":24,"text":101,"correct":26},"采购工作说明书与项目的工作说明书不同",{"key":28,"text":103,"correct":26},"应在编制采购计划的过程中编写采购工作说明书",{"key":31,"text":105,"correct":26},"采购工作说明书定义了与项目合同相关的范围",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},389986,"项目 （ ） 的结果一经管理层确认，将对项目的实际采购活动产生现实性的指导，是项目采购活动的准绳。",[110,112,114,116],{"key":20,"text":111,"correct":26},"工作说明书",{"key":24,"text":113,"correct":26},"自制和外购分析",{"key":28,"text":115,"correct":26},"范围说明书",{"key":31,"text":117,"correct":22},"采购计划编制",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},389987,"下列围绕采购供应商选择的做法中， （ ） 是不恰当的。",[122,124,126,128],{"key":20,"text":123,"correct":26},"采购部门根据历年供应商的供货情况建立了一个供应商数据库，根据数据库选择合格供应商",{"key":24,"text":125,"correct":26},"首先进行供应商调查，满足标准要求后可纳入合格供应商名单",{"key":28,"text":127,"correct":22},"为保持采购的公开透明，采购均采取招标形式选择合格供应商",{"key":31,"text":129,"correct":26},"把采购物品分为3个等级，最低一级供应企业可以没通过ISO9001认证",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},389988,"外包模式是近些年来非常重要的管理概念和经营方法，企业将其部分业务或服务进行外包可以为其带来很多利益，以下 （ ） 不属于外包管理可以为企业带来的益处。",[134,136,138,140],{"key":20,"text":135,"correct":26},"降低相关业务或生产的成本",{"key":24,"text":137,"correct":26},"使企业可以专注于自己的擅长的领域",{"key":28,"text":139,"correct":22},"提升员工的能力和工作效率",{"key":31,"text":141,"correct":26},"改善服务，提高核心竞争力",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},389989,"某项目在招标时被分成若干个项目包，分别发包给不同的承包人。承包人中标后应与招标人签订的合同属于（ ） 。",[146,147,148,149],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":26},{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":20,"analysis":33},389990,"某项目经理要求采购管理员从外面供货商那里采购硬件设备时，需要准备一个 （ ） 以描述采购设备的相关质量技术指标，验收标准和付款方式与期限等内容。",[154,155,157,159],{"key":20,"text":111,"correct":22},{"key":24,"text":156,"correct":26},"合同范围说明",{"key":28,"text":158,"correct":26},"项目章程",{"key":31,"text":160,"correct":26},"合同",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":31,"analysis":33},389991,"某项目建设方没有聘请监理，承建方项目组在编制采购计划时可包括的内容有 ( ) 。 ①第三方系统测试服务； ②设备租赁； ③建设方按照进度计划提供的货物； ④外部聘请的项目培训；",[165,166,168,170],{"key":20,"text":63,"correct":26},{"key":24,"text":167,"correct":26},"②③④",{"key":28,"text":169,"correct":26},"①③④",{"key":31,"text":171,"correct":22},"①②④",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":24,"analysis":33},389992,"某项目甲乙双方签订了建设合同，其中对工程款支付及知识产权的描述分别是“……甲方在系统安装完毕，经试运行及初验合格后，收到乙方材料××日内，支付第二笔款××××元。乙方提供的材料包括：①商业发票；②……”，从上述描述可看出，支付第二笔款还必须附加的材料是（ ）",[176,178,180,182],{"key":20,"text":177,"correct":26},"第三方测试报告",{"key":24,"text":179,"correct":22},"初验报告",{"key":28,"text":181,"correct":26},"专家评审报告",{"key":31,"text":183,"correct":26},"监理工作总结报告",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":31,"analysis":33},389993,"某项采购已经到了合同收尾阶段，为了总结这次采购过程中的经验教训，以供公司内的其他项目参考借鉴，公司应组织（ ） 。",[188,190,192,194],{"key":20,"text":189,"correct":26},"业绩报告",{"key":24,"text":191,"correct":26},"采购评估",{"key":28,"text":193,"correct":26},"项目审查",{"key":31,"text":195,"correct":22},"采购审计",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":31,"analysis":33},389994,"某系统集成商中标一个县政府办公系统的开发项目，该项目在招标时己经明确确定该项目的经费不超过150万元，此项目适合签订（ ）",[200,202,204,205],{"key":20,"text":201,"correct":26},"工料合同",{"key":24,"text":203,"correct":26},"成本补偿合同",{"key":28,"text":25,"correct":26},{"key":31,"text":206,"correct":22},"总价合同",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":28,"analysis":33},389995,"关于项目的采购管理，下列说法中， （ ） 是不正确的。",[211,213,215,217],{"key":20,"text":212,"correct":26},"企业进行一些常规性的采购时可以直接从合格供应商名单中选取供应商",{"key":24,"text":214,"correct":26},"如果项目的建设方指定了固定品牌和型号的设备，那么承建方在采购设备时要遵从建设方的要求",{"key":28,"text":216,"correct":22},"政府或公益性组织在进行采购时必须使用公开招标的方式",{"key":31,"text":218,"correct":26},"在选择供应商的过程中可使用加权计算评分法，可以减少人为偏见带来的影响",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":24,"analysis":33},389996,"根据《中华人民共和国政府采购法》，在以下与政府采购相关的行为或做法中，不正确的是（ ） 。",[223,225,227,229],{"key":20,"text":224,"correct":26},"采购人员陈某与供应商丙是亲戚，故供应商乙申请陈某回避",{"key":24,"text":226,"correct":22},"采购人的上级单位为其指定采购代理机构",{"key":28,"text":228,"correct":26},"供应商甲与供应商丁组成了一个联合体，以一个供应商的身份共同参加政府采购",{"key":31,"text":230,"correct":26},"采购人要求参加政府采购的各供应商提供有关资质证明文件和业绩情况",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":31,"analysis":33},389997,"对于提供长期（一般为3年）涉外人力资源外包服务的软件企业，面对国际金融汇率波动较大和区域人力资源成本攀升速度较快的情况，应与客户签订（ ）类合同",[235,237,238,239],{"key":20,"text":236,"correct":26},"固定总价合同",{"key":24,"text":203,"correct":26},{"key":28,"text":201,"correct":26},{"key":31,"text":240,"correct":22},"总价加经济价格调整合同",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":28,"analysis":33},389998,"采购审计的主要目的是（）。",[245,247,249,251],{"key":20,"text":246,"correct":26},"确认合同项下收取的成本有效、正确",{"key":24,"text":248,"correct":26},"简要地审核项目",{"key":28,"text":250,"correct":22},"确定可供其他采购任务借鉴的成功之处",{"key":31,"text":252,"correct":26},"确认基本竣工",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":24,"analysis":33},389999,"编制采购计划时，项目经理把一份&ldquo;计算机的配置清单及相关的交付时间要求&rdquo;提交给采购部。关于该文件与工作说明书的关系，以下表述（）是正确的。",[257,259,261,263],{"key":20,"text":258,"correct":26},"虽然能满足采购需求，但它是物品清单不是工作说明书",{"key":24,"text":260,"correct":22},"该清单不能作为工作说明书，不能满足采购验收需要",{"key":28,"text":262,"correct":26},"与工作说明书主要内容相符",{"key":31,"text":264,"correct":26},"工作说明书由于很专业应由供应商编制",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":24,"analysis":33},390000,"按照采购控制程序的规定，在采购合同招标前，由项目部提交采购项目的工作说明书（SOW）。某项目按计划要采购一批笔记本电脑，项目经理给采购部提交了采购文件，主要内容有数量、配置、性能和交货日期。以下叙述正确的是 （ ） 。",[269,271,273,275],{"key":20,"text":270,"correct":26},"项目经理提交的采购文件不是SOW",{"key":24,"text":272,"correct":22},"该采购文件是SOW，如果符合文件规定和流程，采购部可接受",{"key":28,"text":274,"correct":26},"只要是项目经理给的采购文件，采购部就可以接受",{"key":31,"text":276,"correct":26},"只有在项目外包时才有采购工作说明书，物品采购可以不产生SOW",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":28,"analysis":33},390001,"按照《中华人民共和国政府采购法》的规定，供应商可以在知道或者应知其权益受到损害之日起七个工作日内，以书面形式向采购人提出质疑。（ ） 不属于质疑的范围。",[281,283,285,287],{"key":20,"text":282,"correct":26},"采购过程",{"key":24,"text":284,"correct":26},"采购文件",{"key":28,"text":286,"correct":22},"合同效力",{"key":31,"text":288,"correct":26},"中标、成交结果",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":20,"analysis":33},390002,"（）活动应在编制采购计划过程中进行。",[293,295,297,299],{"key":20,"text":294,"correct":22},"自制或外购决策",{"key":24,"text":296,"correct":26},"回答卖方的问题",{"key":28,"text":298,"correct":26},"制订合同",{"key":31,"text":300,"correct":26},"制订RFP文件",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":31,"analysis":33},390003,"（ ） 描述用于加工一个产品所需子部件的列表。",[305,307,309,311],{"key":20,"text":306,"correct":26},"资源矩阵",{"key":24,"text":308,"correct":26},"项目构成科目表",{"key":28,"text":310,"correct":26},"活动清单",{"key":31,"text":312,"correct":22},"物料清单",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":24,"analysis":33},390004,"在编制项目采购计划时，根据采购类型的不同，需要不同类型的合同来配合。（ ）包括支付给卖方的实际成本，加上一些通常作为卖方利润的费用",[317,318,319,321],{"key":20,"text":236,"correct":26},{"key":24,"text":203,"correct":22},{"key":28,"text":320,"correct":26},"工时和材料合同",{"key":31,"text":29,"correct":26},{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},390005,"以下对询价的理解中， （ ） 是正确的。",[326,328,330,332],{"key":20,"text":327,"correct":26},"询价的目的是了解市场有关产品的价格",{"key":24,"text":329,"correct":22},"询价是从潜在的卖方处获取如何满足项目需求的答复的过程",{"key":28,"text":331,"correct":26},"投标人会议不是询价的方法",{"key":31,"text":333,"correct":26},"通常需要为询价支付费用",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":28,"analysis":33},390006,"根据政府采购法的规定，以下做法中，（ ）是不正确的。",[338,340,342,344],{"key":20,"text":339,"correct":26},"某省政府采购中心将项目采购的招标工作委托给招标公司完成",{"key":24,"text":341,"correct":26},"政府采购项目完成后，采购方请国家认可的质量检测机构参与项目验收",{"key":28,"text":343,"correct":22},"政府采购项目验收合格后，采购方将招投标原件进行了销毁",{"key":31,"text":345,"correct":26},"招标采购过程中，由于符合条件的供应商不满三家，重新组织了招标",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},390007,"（ ） 活动应在编制采购计划过程中进行。",[350,351,352,353],{"key":20,"text":294,"correct":22},{"key":24,"text":296,"correct":26},{"key":28,"text":298,"correct":26},{"key":31,"text":300,"correct":26},{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":31,"analysis":33},390008,"以下关于工作说明书（SOW）的叙述中，不正确的是（ ）",[358,360,362,364],{"key":20,"text":359,"correct":26},"SOW的内容主要包括服务范围、方法、假定、工作量、变更管理等",{"key":24,"text":361,"correct":26},"内部的SOW有时可称为任务书",{"key":28,"text":363,"correct":26},"SOW的变更应由项目变更控制过程进行管理",{"key":31,"text":365,"correct":22},"SOW通过明确项目应该完成的工作来确定项目范围",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":28,"analysis":33},390009,"与普通的采购管理过程相比，外包管理更注重（ ）环节",[370,372,374,376],{"key":20,"text":371,"correct":26},"自制外购分析",{"key":24,"text":373,"correct":26},"计划编制",{"key":28,"text":375,"correct":22},"过程监控",{"key":31,"text":377,"correct":26},"成果验收",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":24,"analysis":33},390010,"项目采购是一项复杂的工作，编制详细可行的项目采购计划有助于项目成功。（ ）属于编制项目采购计划所必须考虑的内容",[382,383,385,387],{"key":20,"text":111,"correct":26},{"key":24,"text":384,"correct":22},"项目范围说明书",{"key":28,"text":386,"correct":26},"自制\u002F外购决定",{"key":31,"text":388,"correct":26},"合同收尾规程",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":20,"analysis":33},390011,"某公司现有的职员能轻易满足某新项目的一部分要求，但是这个项目的其他方面对该公司来说是新的。项目经理经过调研了解到一些供应商专业生产这类产品，可能能满足项目很多或全部需要。项目经理在准备项目计划和决定怎样招聘最佳人选及处理所需要的资源时，首先应该 （ ） 。",[393,395,397,399],{"key":20,"text":394,"correct":22},"进行自制\u002F外购分析",{"key":24,"text":396,"correct":26},"进行市场调查",{"key":28,"text":398,"correct":26},"通过邀请提交建议书（RFP）向供应商征求方案来决定是否将项目外包出去",{"key":31,"text":400,"correct":26},"评审公司采购部门提供的合格的卖方名单，并向选定的卖方发邀请提交建议书",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":28,"analysis":33},390012,"与普通的采购管理过程相比，外包管理更注重（ ）环节。",[405,406,407,408],{"key":20,"text":371,"correct":26},{"key":24,"text":373,"correct":26},{"key":28,"text":375,"correct":22},{"key":31,"text":377,"correct":26},{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":24,"analysis":33},390013,"采购是从外部获得产品和服务的完整的购买过程。以下关于采购的叙述中，可能不恰当的是：（ ）。",[413,415,417,419],{"key":20,"text":414,"correct":26},"卖方可能会设立一个项目来管理所有的工作",{"key":24,"text":416,"correct":22},"企业采购可以分为日常采购行为和项目采购行为",{"key":28,"text":418,"correct":26},"如果采购涉及集成众多的产品和服务，企业倾向于寻找总集成商",{"key":31,"text":420,"correct":26},"在信息系统集成行业，普遍将项目所需产品或服务资源采购称为“外包”",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":20,"analysis":33},390014,"某系统集成一级企业年项目合同额近3亿元。采购部门要面临从交换机到固定螺丝及相关服务的大量采购任务，下面的采购措施中，不可取的是 （ ） 。",[425,427,429,431],{"key":20,"text":426,"correct":22},"为防止采购人员可能出现经济问题，所有产品都按照统一规则、统一方法进行采购",{"key":24,"text":428,"correct":26},"按照重要程度将产品分为A 类、B 类、C类，分别制定采购规则，A类产品要通过招标，C类产品可简化采购手续",{"key":28,"text":430,"correct":26},"无论采购产品还是服务，都要建立对供应商的评价制度",{"key":31,"text":432,"correct":26},"建立和维护合格供应商名录来缩小采购选择的范围",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":31,"analysis":33},390015,"如何以合适的方法监督供方是项目外包管理的一个重点，以下监控方式正确的是（ ） 。",[437,439,441,443],{"key":20,"text":438,"correct":26},"由项目监理来监督，委托方不用过问",{"key":24,"text":440,"correct":26},"所有项目成果都必须测试",{"key":28,"text":442,"correct":26},"所有过程和产品监控须由委托方人员来执行",{"key":31,"text":444,"correct":22},"与供应商先确定评价的频次和方法，列出日程表，按照计划进行评价",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":28,"analysis":33},390016,"某通信设备采购项目，签订合同后进入了合同履行阶段，以下 （ ） 做法是不合理的。",[449,451,453,455],{"key":20,"text":450,"correct":26},"合同履行过程中发现处于支付的通信设备的质量及验收要求约定不明确，双方进行商议后以补充协议进行了规定",{"key":24,"text":452,"correct":26},"由于采购方不具备接收通信设备的条件，要求供货方延迟货物的交付，到了实际交付时，由于该通信设备的价格涨价，供货方要求变更合同价格",{"key":28,"text":454,"correct":22},"通信设备在运输至采购方的过程中，遇到了连续的暴雨天气无法按时交付，采购方认为合同中没有对应的免责条款，对供货方进行经济索赔",{"key":31,"text":456,"correct":26},"合同双方在履行过程中产生了纠纷，双方无法协调一致，因此向仲裁机构提出了仲裁申请。",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":24,"analysis":33},390017,"按照索赔程序，索赔方要在索赔通知书发出后 （ ） 内，向监理方提出延长工期和（或）补偿经济损失的索赔报告及有关资料。",[461,463,465,467],{"key":20,"text":462,"correct":26},"2周",{"key":24,"text":464,"correct":22},"28天",{"key":28,"text":466,"correct":26},"30天",{"key":31,"text":468,"correct":26},"3周",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":31,"analysis":33},390018,"自制或外购的决定需要考虑 （ ） 。",[473,475,477,479],{"key":20,"text":474,"correct":26},"战术成本和战略成本",{"key":24,"text":476,"correct":26},"管理成本和项目成本",{"key":28,"text":478,"correct":26},"拖延成本和滞留成本",{"key":31,"text":480,"correct":22},"直接成本和间接成本",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":20,"analysis":33},390019,"准确和无偏颇的数据是量化风险分析的基本要求。可以通过 （） 来检查人们对风险的理解程度。",[485,487,489,491],{"key":20,"text":486,"correct":22},"风险数据质量评估",{"key":24,"text":488,"correct":26},"发生概率与影响评估",{"key":28,"text":490,"correct":26},"敏感性分析",{"key":31,"text":492,"correct":26},"影响图",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":28,"analysis":33},390020,"主要风险清单是常用的项目风险管理工具，如下图所示。以下关于风险清单的叙述中，（ ）是不正确的。",[497,499,501,503],{"key":20,"text":498,"correct":26},"该风险清单应在需求分析之前建立，并在项目结束前不断定期维护",{"key":24,"text":500,"correct":26},"项目经理、风险管理贵任人应每隔一周左右回顾该风险清单",{"key":28,"text":502,"correct":22},"应该对风险清单中的部分主要风险制定详细的风险应对计划",{"key":31,"text":504,"correct":26},"对风险清单的回顾应包含在进度计划表中，否则可能被遗忘",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":20,"analysis":33},390021,"制订风险管理计划是描述在项目中如何组织和执行风险管理的项目计划。其中定义风险管理过程在项目整个生命周期中的执行频度，并定义风险管理活动的计划的工具或活动称为 （ ） 。",[509,511,513,515],{"key":20,"text":510,"correct":22},"风险管理时间表",{"key":24,"text":512,"correct":26},"风险概率分析",{"key":28,"text":514,"correct":26},"风险检查表",{"key":31,"text":516,"correct":26},"风险频度评审",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":24,"analysis":33},390022,"在一个子系统中增加冗余设计，以增加某信息系统的可靠性。这种做法属于风险应对策略中的 （ ） 方法。",[521,523,525,527],{"key":20,"text":522,"correct":26},"避免",{"key":24,"text":524,"correct":22},"减轻",{"key":28,"text":526,"correct":26},"转移",{"key":31,"text":528,"correct":26},"接受",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":31,"analysis":33},390023,"在项目管理的下列四类风险类型中，对用户来说如果没有管理好，（）将会造成最长久的影响。",[533,535,537,539],{"key":20,"text":534,"correct":26},"范围风险",{"key":24,"text":536,"correct":26},"进度计划风险",{"key":28,"text":538,"correct":26},"费用风险",{"key":31,"text":540,"correct":22},"质量风险",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":24,"analysis":33},390024,"在项目风险识别中使用信息收集技术，依据系统的程序，专家之间采用匿名发表意见的方式，不发生横向联系，只与调查人员发生关系，通过多次调查专家对问卷所提问题的看法，经过反复征询，归纳，修改，最后汇总成专家一致的看法作为预测的结果，此种风险识别的方法称为 （ ） 。",[545,547,549,551],{"key":20,"text":546,"correct":26},"头脑风暴法",{"key":24,"text":548,"correct":22},"德尔菲法",{"key":28,"text":550,"correct":26},"访谈法",{"key":31,"text":552,"correct":26},"优势、劣势、机会、威胁分析",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":24,"analysis":33},390025,"在项目风险分析过程中，灵敏度分析、建模和仿真通常用于 （ ） 。",[557,559,561,563],{"key":20,"text":558,"correct":26},"定性风险分析",{"key":24,"text":560,"correct":22},"定量风险分析",{"key":28,"text":562,"correct":26},"总体风险分析",{"key":31,"text":564,"correct":26},"具体风险分析",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":20,"analysis":33},390026,"在进行 （ ） 时可以采用期望货币值技术。",[569,570,572,573],{"key":20,"text":560,"correct":22},{"key":24,"text":571,"correct":26},"风险紧急度评估",{"key":28,"text":558,"correct":26},{"key":31,"text":574,"correct":26},"SWOT分析",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":20,"analysis":33},390027,"由于大型项目团队构成复杂，因此在制订风险管理计划时，首先要考虑 （ ） 。",[579,581,583,585],{"key":20,"text":580,"correct":22},"组织及参与项目的人员的风险态度和风险承受度",{"key":24,"text":582,"correct":26},"已识别风险清单",{"key":28,"text":584,"correct":26},"项目风险的相对排序或优先度清单",{"key":31,"text":586,"correct":26},"风险的应对策略",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":31,"analysis":33},390028,"以下关于IT项目风险应对策略的描述中， （ ） 是错误的。",[591,593,595,597],{"key":20,"text":592,"correct":26},"策略必须具有时效性",{"key":24,"text":594,"correct":26},"策略必须与风险的严重程度相一致，避免花费比风险后果更多的资源去预防风险",{"key":28,"text":596,"correct":26},"对于某个比较重要的风险，可以采用单个风险应对计划表来对其进行管理",{"key":31,"text":598,"correct":22},"为避免风险进一步扩大，尽可能让更少的项目干系人参与",[600,604,607,610,613,616],{"id":601,"name":602,"category":7,"favorite":603},136,"法律职业试卷二(客观题 )",2,{"id":605,"name":606,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":608,"name":609,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":611,"name":612,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":614,"name":615,"category":7,"favorite":8},28,"安全工程师",{"id":617,"name":618,"category":7,"favorite":8},112,"安全生产法律知识"]