[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-35":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":616},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,35,50,1856,[13,34,46,58,70,82,94,106,118,130,139,151,163,175,187,199,211,223,235,247,259,271,283,295,307,319,331,343,355,367,379,391,403,415,427,439,451,463,475,487,499,511,523,534,546,557,569,581,593,605],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},389928,1,"单选题","（ ） 不能保障公司内部网络边界的安全",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","在公司网络与Internet或外界其他接口处设置防火墙",false,{"key":24,"text":25,"correct":22},"B","公司以外网络上用户要访问公司网时，使用认证授权系统",{"key":27,"text":28,"correct":29},"C","禁止公司员工使用公司外部的电子邮件服务器",true,{"key":31,"text":32,"correct":22},"D","禁止公司内部网络的用户私自设置拨号上网","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},389929,"在开放系统互连参考模型（OSI）中， （ ） 的主要功能是将网络地址翻译成对应的物理地址，并决定如何将数据从发送方经路由送达到接收方。",[38,40,42,44],{"key":20,"text":39,"correct":22},"数据链路层",{"key":24,"text":41,"correct":22},"物理层",{"key":27,"text":43,"correct":29},"网络层",{"key":31,"text":45,"correct":22},"传输层",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},389930,"（ ） 不属于网页防篡改技术",[50,52,54,56],{"key":20,"text":51,"correct":22},"时间轮询",{"key":24,"text":53,"correct":22},"事件触发",{"key":27,"text":55,"correct":22},"文件过滤驱动",{"key":31,"text":57,"correct":29},"反间谍软件",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},389931,"在信息系统的规划工具中，下表是 （ ） 。 说明，\"√\"代表负责和决策，\"*\"代表过程主要涉及，\"﹢\"代表过程有涉及，空白代表过程不涉及。",[62,64,66,68],{"key":20,"text":63,"correct":29},"过程\u002F组织矩阵",{"key":24,"text":65,"correct":22},"资源\u002F数据矩阵",{"key":27,"text":67,"correct":22},"优先矩阵",{"key":31,"text":69,"correct":22},"过程\u002F数据矩阵",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},389932,"针对信息系统，安全可以划分为四个层次，其中不包括 （ ） 。",[74,76,78,80],{"key":20,"text":75,"correct":22},"设备安全",{"key":24,"text":77,"correct":29},"人员安全",{"key":27,"text":79,"correct":22},"内容安全",{"key":31,"text":81,"correct":22},"行为安全",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},389933,"GB\u002FT 22240-2008《信息安全技术信息系统安全等级保护定级指南》标准将信息系统的安全保护等级分为五级。\"信息系统受到破坏后，会对社会秩序和公共利益造成严重损害，或者对国家安全造成损害\"是 （ ） 的特征。",[86,88,90,92],{"key":20,"text":87,"correct":22},"第二级",{"key":24,"text":89,"correct":29},"第三级",{"key":27,"text":91,"correct":22},"第四级",{"key":31,"text":93,"correct":22},"第五级",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},389934,"信息系统的安全威胁分成七类，其中不包括 （ ） 。",[98,100,102,104],{"key":20,"text":99,"correct":22},"自然事件风险和人为事件风险",{"key":24,"text":101,"correct":22},"软件系统风险和软件过程风险",{"key":27,"text":103,"correct":22},"项目管理风险和应用风险",{"key":31,"text":105,"correct":29},"功能风险和效率风险",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},389935,"信息系统设备安全是信息系统安全的重要内容，其中设备的 （ ） 是指设备在一定时间内不出故障的概率。",[110,112,114,116],{"key":20,"text":111,"correct":22},"完整性",{"key":24,"text":113,"correct":29},"稳定性",{"key":27,"text":115,"correct":22},"可靠性",{"key":31,"text":117,"correct":22},"保密性",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},389936,"典型的信息系统项目开发的过程中， （请作答此空） 阶段拟定了系统的目标、范围和要求，而系统各模块的算法一般在 （ ） 阶段确定。",[122,124,126,128],{"key":20,"text":123,"correct":22},"概要设计",{"key":24,"text":125,"correct":29},"需求分析",{"key":27,"text":127,"correct":22},"详细设计",{"key":31,"text":129,"correct":22},"程序设计",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},389937,"典型的信息系统项目开发的过程中， （ ） 阶段拟定了系统的目标、范围和要求，而系统各模块的算法一般在 （请作答此空） 阶段确定。",[134,135,136,137],{"key":20,"text":123,"correct":22},{"key":24,"text":125,"correct":22},{"key":27,"text":127,"correct":29},{"key":31,"text":138,"correct":22},"架构设计",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":24,"analysis":33},389938,"IEEE 802 规范定义了网卡如何访问传输介质，以及如何在传输介质上传输数据的方法。其中， （ ） 是重要的局域网协议。",[143,145,147,149],{"key":20,"text":144,"correct":22},"IEEE 802.1",{"key":24,"text":146,"correct":29},"IEEE 802.3",{"key":27,"text":148,"correct":22},"IEEE 802.6",{"key":31,"text":150,"correct":22},"IEEE 802.11",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":20,"analysis":33},389939,"（ ） 是物联网应用的重要基础，是两化融合的重要技术之一。",[155,157,159,161],{"key":20,"text":156,"correct":29},"遥感和传感技术",{"key":24,"text":158,"correct":22},"智能化技术",{"key":27,"text":160,"correct":22},"虚拟计算技术",{"key":31,"text":162,"correct":22},"集成化和平台化",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":24,"analysis":33},389940,"大型复杂项目的项目管理有别于单项目管理，对于大型复杂项目来说，首先应该制订的计划是 （ ） 。而在该计划中一般不会包括 （请作答此空） 。",[167,169,171,173],{"key":20,"text":168,"correct":22},"执行过程",{"key":24,"text":170,"correct":29},"裁剪过程",{"key":27,"text":172,"correct":22},"监督过程",{"key":31,"text":174,"correct":22},"制订过程",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":31,"analysis":33},389941,"大型复杂项目的项目管理有别于单项目管理，对于大型复杂项目来说，首先应该制订的计划是 （请作答此空） 。而在该计划中一般不会包括 （ ） 。",[179,181,183,185],{"key":20,"text":180,"correct":22},"进度计划",{"key":24,"text":182,"correct":22},"成本计划",{"key":27,"text":184,"correct":22},"范围计划",{"key":31,"text":186,"correct":29},"过程计划",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":24,"analysis":33},389942,"以下关于移动互联网的描述，不正确的是： （ ） 。",[191,193,195,197],{"key":20,"text":192,"correct":22},"移动互联网使得用户可以在移动状态下接入和使用互联网服务",{"key":24,"text":194,"correct":29},"移动互联网是桌面互联网的复制和移植",{"key":27,"text":196,"correct":22},"传感技术能极大地推动移动互联网的成长",{"key":31,"text":198,"correct":22},"在移动互联网领域，仍存在浏览器竞争及\"孤岛\"问题",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":31,"analysis":33},389943,"移动计算的特点不包括 （ ） 。",[203,205,207,209],{"key":20,"text":204,"correct":22},"移动性",{"key":24,"text":206,"correct":22},"网络通信的非对称性",{"key":27,"text":208,"correct":22},"频繁断接性",{"key":31,"text":210,"correct":29},"高可靠性",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":20,"analysis":33},389944,"在用UML对信息系统建模过程中， （ ） 来描述用户需求，主要从用户的角度描述系统的功能",[215,217,219,221],{"key":20,"text":216,"correct":29},"用例图",{"key":24,"text":218,"correct":22},"类图",{"key":27,"text":220,"correct":22},"对象图",{"key":31,"text":222,"correct":22},"部署图",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":31,"analysis":33},389945,"安全审计（security audit）是通过测试公司信息系统对一套确定标准的符合程度来评估其安全性的系统方法，安全审计的主要作用不包括 （ ） 。",[227,229,231,233],{"key":20,"text":228,"correct":22},"对潜在的攻击者起到震慑或警告作用",{"key":24,"text":230,"correct":22},"对已发生的系统破坏行为提供有效的追究证据",{"key":27,"text":232,"correct":22},"通过提供日志，帮助系统管理员发现入侵行为或潜在漏洞",{"key":31,"text":234,"correct":29},"通过性能测试，帮助系统管理员发现性能缺陷或不足",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":31,"analysis":33},389946,"大型复杂项目，一般具有周期较长规模较大、目标构成复杂等特征，因此大型复杂项目的控制过程与普通项目的控制过程有较大差别。（ ） 不属于大型复杂项目控制过程的重要因素。",[239,241,243,245],{"key":20,"text":240,"correct":22},"项目绩效跟踪",{"key":24,"text":242,"correct":22},"外部变更请求",{"key":27,"text":244,"correct":22},"变更控制",{"key":31,"text":246,"correct":29},"里程碑设置",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":27,"analysis":33},389947,"研究软件架构的根本目的是解决软件的复用、质量和维护问题，软件架构设计是软件开发过程中关键一步，因此需要对其进行评估，在这一活动中，评估人员关注的是系统的 （ ） 属性。",[251,253,255,257],{"key":20,"text":252,"correct":22},"功能",{"key":24,"text":254,"correct":22},"性能",{"key":27,"text":256,"correct":29},"质量",{"key":31,"text":258,"correct":22},"安全",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":24,"analysis":33},389948,"智能具有感知、记忆、自适应等特点，能够存储感知到的外部信息及由思维产生的知识，同时能够利用已有的知识对信息进行分析、计算、比较、判断、联想和决策属于智能的 （ ） 能力。",[263,265,267,269],{"key":20,"text":264,"correct":22},"感知",{"key":24,"text":266,"correct":29},"记忆和思维",{"key":27,"text":268,"correct":22},"学习和自适应",{"key":31,"text":270,"correct":22},"行为决策",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":20,"analysis":33},389949,"中间件可以分为数据库访问中间件，远程过程调用中间件、面向消息中间件、事务中间件、分布式对象中间件等多种类型。Windows平台的ODBC和JAVA平台的JDBC属于 （ ） 。",[275,277,279,281],{"key":20,"text":276,"correct":29},"数据库访问中间件",{"key":24,"text":278,"correct":22},"远程过程调用中间件",{"key":27,"text":280,"correct":22},"面向消息中间件",{"key":31,"text":282,"correct":22},"事务中间件",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":20,"analysis":33},389950,"在与客户签订合同时，可以增加一些条款，如限定客户提出需求变更的时间，规定何种情况的变更可以接受，拒绝或部分接受，规定发生需求变更时必须执行变更管理流程等内容属于针对需求变更的（ ）。",[287,289,291,293],{"key":20,"text":288,"correct":29},"合同管理",{"key":24,"text":290,"correct":22},"需求基线管理",{"key":27,"text":292,"correct":22},"文档管理",{"key":31,"text":294,"correct":22},"过程管理",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":31,"analysis":33},389951,"以下关于合同收尾的叙述中， （ ） 是不正确的。",[299,301,303,305],{"key":20,"text":300,"correct":22},"在合同收尾的任何时候，只要在合同变更控制条款下经双方同意都可以对合同进行修订",{"key":24,"text":302,"correct":22},"合同收尾包括项目验收和管理收尾",{"key":27,"text":304,"correct":22},"提前终止合同是合同收尾的一种特例",{"key":31,"text":306,"correct":29},"合同收尾的工具包括合同收尾过程，过程审计，记录管理系统",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":24,"analysis":33},389952,"以下关于合同变更的叙述中， （ ） 是不正确的。",[311,313,315,317],{"key":20,"text":312,"correct":22},"合同变更一般处理程序如下：变更的提出、变更请求的审查、变更的批准、变更的实施",{"key":24,"text":314,"correct":29},"变更申请可以以口头形式提出，变更评估必须采取书面方式",{"key":27,"text":316,"correct":22},"对于任何变更的评估都应该有变更影响分析",{"key":31,"text":318,"correct":22},"合同变更的处理由合同变更控制系统来完成",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":27,"analysis":33},389953,"乙公司中标承接了甲机构的网络工程集成项目，在合同中约定了因不可抗力因素导致工期延误免责的条款，其中不会被甲机构认可的不可抗力因素是 （28） 合同约定， 。",[323,325,327,329],{"key":20,"text":324,"correct":22},"施工现场遭遇长时间雷雨天气",{"key":24,"text":326,"correct":22},"物流公司车辆遭遇车祸",{"key":27,"text":328,"correct":29},"乙方施工队领导遭遇意外情况",{"key":31,"text":330,"correct":22},"施工现场长时间停电",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":20,"analysis":33},389954,"信息系统设备供应商在与业主单位签订采购合同前，因工期要求，已提前将所采购设备交付给业主单位，并通过验收。补签订合同时，合同的生效日期应当为（29）。",[335,337,339,341],{"key":20,"text":336,"correct":29},"交付日期",{"key":24,"text":338,"correct":22},"委托采购日期",{"key":27,"text":340,"correct":22},"验收日期",{"key":31,"text":342,"correct":22},"合同实际签订日期",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":24,"analysis":33},389955,"项目发生索赔事件后，一般先由 （ ） 依据合同进行调解。",[347,349,351,353],{"key":20,"text":348,"correct":22},"政府行政主管部门",{"key":24,"text":350,"correct":29},"监理工程师",{"key":27,"text":352,"correct":22},"仲裁委员会",{"key":31,"text":354,"correct":22},"项目经理",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":24,"analysis":33},389956,"下面关于索赔的说法中，不正确的是 （ ） 。",[359,361,363,365],{"key":20,"text":360,"correct":22},"按照索赔的目的进行划分，索赔可以分为工期索赔和费用索赔",{"key":24,"text":362,"correct":29},"项目发生索赔事件后，应先由监理工程师调解，若调解不成，则须由政府建设主管机构进行调解或仲裁后，方可向所在地人民法院起诉",{"key":27,"text":364,"correct":22},"索赔必须以合同为依据",{"key":31,"text":366,"correct":22},"索赔的重要前提条件是合同一方或双方存在违约行为和事实，并且由此造成了损失，责任应对对方承担",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":27,"analysis":33},389957,"签订信息系统工程项目合同时有许多注意事项，下列选项中， （ ） 在合同签订时不用考虑",[371,373,375,377],{"key":20,"text":372,"correct":22},"当事人的法律资格",{"key":24,"text":374,"correct":22},"验收标准",{"key":27,"text":376,"correct":29},"项目管理计划",{"key":31,"text":378,"correct":22},"技术支持服务",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":20,"analysis":33},389958,"某项工程需在室外进行线缆铺设，但由于连续大雨造成承建方一直无法施工，开工日期比计划晚了2周（合同约定持续1周以内的天气异常不属于反常天气），给承建方造成一定的经济损失。承建方若寻求补偿，应当 （ ） 。",[383,385,387,389],{"key":20,"text":384,"correct":29},"要求延长工期补偿",{"key":24,"text":386,"correct":22},"要求费用补偿",{"key":27,"text":388,"correct":22},"要求延长工期补偿、费用补偿",{"key":31,"text":390,"correct":22},"自己克服",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":27,"analysis":33},389959,"某系统集成商中标一个县政府办公系统的开发项目，在合同执行过程中，县政府提出在办公系统中增加人员考勤管理的模块，由于范围发生变化，合同管理人员需要协调并重新签订合同，该合同的管理内容属于（ ）",[395,397,399,401],{"key":20,"text":396,"correct":22},"合同签订管理",{"key":24,"text":398,"correct":22},"合同履行管理",{"key":27,"text":400,"correct":29},"合同变更管理",{"key":31,"text":402,"correct":22},"合同档案管理",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":24,"analysis":33},389960,"某机构将一大型信息系统集成项目分成3个包进行招标，共有3家承包商中标，发包人与承包商应签署 （ ）",[407,409,411,413],{"key":20,"text":408,"correct":22},"技术转让合同",{"key":24,"text":410,"correct":29},"单项项目承包合同",{"key":27,"text":412,"correct":22},"分包合同",{"key":31,"text":414,"correct":22},"总承包合同",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":27,"analysis":33},389961,"某海港咨询公司的一名项目经理遵照合同实施某项目，为236台服务器的操作系统进行升级。项目经理在执行合同的收尾过程中，应该_____ 。",[419,421,423,425],{"key":20,"text":420,"correct":22},"按合同付款",{"key":24,"text":422,"correct":22},"进行绩效测量",{"key":27,"text":424,"correct":29},"正式验收",{"key":31,"text":426,"correct":22},"进行产品验证",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":31,"analysis":33},389962,"某公司按总价格合同方式约定订购3000米高规格的铜缆，由于建设单位原因，工期暂停了半个月，待恢复施工后，承建单位以近期铜价上涨为理由，要求建设单位赔偿购买电缆增加的费用，并要求适当延长工期，以下说法中， （ ） 是正确的。",[431,433,435,437],{"key":20,"text":432,"correct":22},"建设单位应该赔偿承建单位采购电缆增加的费用",{"key":24,"text":434,"correct":22},"监理单位应该保护承建单位的合法利益，因此应该支持承建的索赔要求",{"key":27,"text":436,"correct":22},"索赔是合同双方利益的体现，可以使造价更趋于合理",{"key":31,"text":438,"correct":29},"铜价上涨是承建单位应承担的项目风险，不应该要求赔偿费用",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":24,"analysis":33},389963,"合同一旦签署了就具有法律约束力，除非 （ ） 。",[443,445,447,449],{"key":20,"text":444,"correct":22},"一方不愿意履行义务",{"key":24,"text":446,"correct":29},"损害社会公共利益",{"key":27,"text":448,"correct":22},"一方宣布合同无效",{"key":31,"text":450,"correct":22},"一方由于某种原因破产",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":31,"analysis":33},389964,"合同生效后，当事人就质量、价款或者报酬、履行地点等内容没有约定或者约定不明确的，可以以协议补充；不能达成补充协议的，按照_____或者交易习惯确定。",[455,457,459,461],{"key":20,"text":456,"correct":22},"公平原则",{"key":24,"text":458,"correct":22},"项目变更流程",{"key":27,"text":460,"correct":22},"第三方调解的结果",{"key":31,"text":462,"correct":29},"合同有关条款",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":31,"analysis":33},389966,"关于行政收尾和合同收尾说法不正确的是（ ）",[467,469,471,473],{"key":20,"text":468,"correct":22},"合同收尾是把项目上的每个合同都了结，包括工作完成、产品验收和移交、价款结算和争议解决等。",{"key":24,"text":470,"correct":22},"行政收尾是指对项目工作进行全面、系统和深入的回顾，进行完工后评价，考察“如果有机会重新做该项目可以如何改进”，把有关经验教训提炼出来并形成文档，并使它成为“组织过程资产”的一部分。",{"key":27,"text":472,"correct":22},"行政收尾针对项目和项目各阶段，每个项目阶段结束都需要进行；而合同收尾针对合同，一个合同只需要一次；",{"key":31,"text":474,"correct":29},"合同收尾的工具和技术有采购审计，专家判断和合同档案管理系统。",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":31,"analysis":33},389967,"关于信息工程实施合同中关于工期的叙述，不正确的是 ______。",[479,481,483,485],{"key":20,"text":480,"correct":22},"在合同协议书内应明确注明开工日期",{"key":24,"text":482,"correct":22},"在合同协议书内应明确注明竣工日期",{"key":27,"text":484,"correct":22},"在合同协议书内应明确注明合同工期总日历天数",{"key":31,"text":486,"correct":29},"通过招标选择承包人的项目，其合同工期天数就是招标文件要求的工期天数",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":27,"analysis":33},389968,"对承建方来说，固定单价合同适用于 （ ） 的项目。",[491,493,495,497],{"key":20,"text":492,"correct":22},"工期长，工程量变化幅度很大",{"key":24,"text":494,"correct":22},"工期长，工程量变化幅度不太大",{"key":27,"text":496,"correct":29},"工期短，工程量变化幅度不太大",{"key":31,"text":498,"correct":22},"工期短，工程量变化幅度很大",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":20,"analysis":33},389969,"当 （ ） 时，合同可能认定为无效。",[503,505,507,509],{"key":20,"text":504,"correct":29},"合同甲乙双方损害了社会共同利益",{"key":24,"text":506,"correct":22},"合同标的规格约定不清",{"key":27,"text":508,"correct":22},"合同中缺少违约条款",{"key":31,"text":510,"correct":22},"合同中包括对人身伤害的免责条款",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":27,"analysis":33},389970,"《合同法》规定，价款或酬金约定不明确的，按 （ ） 的市场价格履行。",[515,517,519,521],{"key":20,"text":516,"correct":22},"订立合同时订立地",{"key":24,"text":518,"correct":22},"履行合同时订立地",{"key":27,"text":520,"correct":29},"订立合同时履行地",{"key":31,"text":522,"correct":22},"履行合同时履行地",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":24,"analysis":33},389971,"下列关于索赔的描述中，错误的是 （ ） 。",[527,528,530,532],{"key":20,"text":364,"correct":22},{"key":24,"text":529,"correct":29},"索赔的性质属于经济惩罚行为",{"key":27,"text":531,"correct":22},"项目发生索赔事件后，合同双方可以通过协商方式解决",{"key":31,"text":533,"correct":22},"合同索赔是规范合同行为的一种约束力和保障措施",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":24,"analysis":33},389972,"在建设工程合同的订立过程中，投标人根据招标内容在约定期限内向招标人提交的投标文件，此为（ ） 。",[538,540,542,544],{"key":20,"text":539,"correct":22},"要约邀请",{"key":24,"text":541,"correct":29},"要约",{"key":27,"text":543,"correct":22},"承诺",{"key":31,"text":545,"correct":22},"承诺生效",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":31,"analysis":33},389973,"审核并记录供应商的绩效信息，建立必需的纠正和预防措施，作为将来选择供应商的参考过程，属于项目采购管理的（ ）过程。",[550,552,554,556],{"key":20,"text":551,"correct":22},"供方选择",{"key":24,"text":553,"correct":22},"合同收尾",{"key":27,"text":555,"correct":22},"编制合同",{"key":31,"text":288,"correct":29},{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":31,"analysis":33},389974,"ZGY公司委托T公司开发一套新的管理信息系统，T公司未能按合同规定的日期交付最终产品，给ZGY公司造成巨大的运营损失，因此ZGY公司向T公司提出索赔，其中不包括 （ ） 。",[561,563,565,567],{"key":20,"text":562,"correct":22},"清算赔偿金",{"key":24,"text":564,"correct":22},"间接损失赔偿金",{"key":27,"text":566,"correct":22},"补偿性赔偿金",{"key":31,"text":568,"correct":29},"惩罚性赔偿金",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":24,"analysis":33},389975,"按照索赔程序，索赔方要在索赔通知书发出后 （ ） 内，向监理方提出延长工期和（或）补偿经济损失的索赔报告及有关资料",[573,575,577,579],{"key":20,"text":574,"correct":22},"2周",{"key":24,"text":576,"correct":29},"28天",{"key":27,"text":578,"correct":22},"30天",{"key":31,"text":580,"correct":22},"3周",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":27,"analysis":33},389976,"甲乙两个公司在项目实施过程中，对合同的生效时间产生了分歧。仲裁机构调查时发现以下事实。①双方签署的合同上并没有对合同的生效日期做出规定；②双方签署合同的过程如下：乙公司在拟定好合同文本并签署后以邮寄的方式寄给甲公司，信封上盖有乙公司所在地邮局3月18日的邮戳，甲公司于3月20日收到合同文本，甲公司签署合同后，将合同回寄给乙公司，信封带有甲公司所在地3月22日的邮戳，乙公司于3月25日收到合同。仲裁机构应判定 （ ） 作为合同生效的日期。",[585,587,589,591],{"key":20,"text":586,"correct":22},"3月18日",{"key":24,"text":588,"correct":22},"3月20日",{"key":27,"text":590,"correct":29},"3月22日",{"key":31,"text":592,"correct":22},"3月25日",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":31,"analysis":33},389977,"在供方选择过程中，对提供主要物资的新的供方，应要求其提供充分的质量证明文件，以证实其质量保证能力。 （ ） 不属于质量证明。",[597,599,601,603],{"key":20,"text":598,"correct":22},"供方多年供货业绩综合评价",{"key":24,"text":600,"correct":22},"供方质量管理体系对按要求如期提供稳定质量产品的保证能力",{"key":27,"text":602,"correct":22},"供方其他用户对其产品质量的反馈",{"key":31,"text":604,"correct":29},"供方绩效评估结果",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":24,"analysis":33},389978,"（ ） 涉及到结算和关闭项目所建立的任何合同、采购或买进协议，也定义了为支持项目的正式收尾所需的相关合同的活动。",[609,611,612,614],{"key":20,"text":610,"correct":22},"行政收尾",{"key":24,"text":553,"correct":29},{"key":27,"text":613,"correct":22},"变更收尾",{"key":31,"text":615,"correct":22},"管理收尾",[617,621,624,627,630,633],{"id":618,"name":619,"category":7,"favorite":620},136,"法律职业试卷二(客观题 )",2,{"id":622,"name":623,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":625,"name":626,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":628,"name":629,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":631,"name":632,"category":7,"favorite":8},28,"安全工程师",{"id":634,"name":635,"category":7,"favorite":8},112,"安全生产法律知识"]