[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-33":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":618},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,33,50,1856,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,297,309,321,333,343,355,367,379,391,403,415,427,439,451,463,475,487,499,511,523,535,547,559,570,582,594,606],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},389828,1,"单选题","Besides the（ ） for process and data of current system，the deliverable from this phase also includes the formal requirements definition for the proposed system.",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","logical models",true,{"key":24,"text":25,"correct":26},"B","physical models",false,{"key":28,"text":29,"correct":26},"C","design models",{"key":31,"text":32,"correct":26},"D","implementation models","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},389829,"The schedule management plan is a component of the project management plan The schedule management plan maybe formal or informal,highly detailed or broadly framed,based up on the（ ）of the project,and includes appropriate control thresholds.",[38,40,42,44],{"key":20,"text":39,"correct":26},"goals",{"key":24,"text":41,"correct":26},"values",{"key":28,"text":43,"correct":22},"needs",{"key":31,"text":45,"correct":26},"Level",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},389830,"Configuration management system can be used in defining approval levels for authorizing changes and providing a method to validate approved changes． （ ） is not a project configuration management tool",[50,52,54,56],{"key":20,"text":51,"correct":26},"Rational Clearcase",{"key":24,"text":53,"correct":22},"Quality Function Deployment",{"key":28,"text":55,"correct":26},"Visual SourceSafe",{"key":31,"text":57,"correct":26},"Concurrent Versions System",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},389831,"The parties to government procurement refer to the principal entities of all kinds that enjoy rights and undertake obligations in government procurement，including the procuring entities. The （ ） and the procuring agencies.",[62,64,66,68],{"key":20,"text":63,"correct":26},"users",{"key":24,"text":65,"correct":26},"servers",{"key":28,"text":67,"correct":26},"producers",{"key":31,"text":69,"correct":22},"suppliers",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},389832,"When multiple routers are used in interconnected networks,the routers exchange information about （ ） using a dynamic routing protocol.",[74,76,78,80],{"key":20,"text":75,"correct":22},"destination addresses",{"key":24,"text":77,"correct":26},"IP addresses",{"key":28,"text":79,"correct":26},"work addresses",{"key":31,"text":81,"correct":26},"router addresses",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},389833,"Precedence Diagramming Method（PDM） is a method used in activity sequencing. There are four types of dependencies or precedence relationships in PDM. The initiation of the successor activity depends upon the completion of the predecessor activity is called （ ）.",[86,88,90,92],{"key":20,"text":87,"correct":22},"Finish-to-Start",{"key":24,"text":89,"correct":26},"Finish-to-Finish",{"key":28,"text":91,"correct":26},"Start-to-Start",{"key":31,"text":93,"correct":26},"Start-to-Finish",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},389834,"Which of the following statement related to PMO is not correct? ( )",[98,100,102,104],{"key":20,"text":99,"correct":26},"A. The specifiC form, function, and structure of A PMO is dependent upon the needs of the organization that it supports.",{"key":24,"text":101,"correct":26},"B.One of the key features of a PMO is managing share resources across all projects administered by the PMO",{"key":28,"text":103,"correct":22},"The PMO focuses on the specifie project objectives.",{"key":31,"text":105,"correct":26},"The PMO optimizes the use of shared organizational resources across all projects.",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},389835,"Fair and （ ） competition in government procurement around the world is good business and good public policy.",[110,112,114,116],{"key":20,"text":111,"correct":22},"open",{"key":24,"text":113,"correct":26},"continue",{"key":28,"text":115,"correct":26},"dependent",{"key":31,"text":117,"correct":26},"reliable",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},389836,"( ) must be between on-line deployment and final acceptance.",[122,124,126,128],{"key":20,"text":123,"correct":26},"Detailed design",{"key":24,"text":125,"correct":22},"Test run",{"key":28,"text":127,"correct":26},"Internal testing",{"key":31,"text":129,"correct":26},"Contract signing",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},389837,"（）is one of the quality planning outputs.",[134,136,138,140],{"key":20,"text":135,"correct":26},"Scope base line",{"key":24,"text":137,"correct":26},"Cost of quality",{"key":28,"text":139,"correct":26},"Product specification",{"key":31,"text":141,"correct":22},"Quality checklist",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},389838,"Changes may be requested by any stakeholder involved with the project，but changes can be authorized only by （ ） ．",[146,148,150,152],{"key":20,"text":147,"correct":26},"executive IT manager",{"key":24,"text":149,"correct":26},"project manger",{"key":28,"text":151,"correct":22},"change control board",{"key":31,"text":153,"correct":26},"project sponsor",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},389839,"In the process of communication requirement analysis，the project manager should consider the number of potential communication channels or paths as an indicator of the complexity of a project’s communications. According to Metcalfe’s Law，a project with 10 stakeholders has （ ） potential communication channels.",[158,160,162,164],{"key":20,"text":159,"correct":26},"10",{"key":24,"text":161,"correct":22},"45",{"key":28,"text":163,"correct":26},"50",{"key":31,"text":165,"correct":26},"100",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},389840,"The intention of the （ ） is to schedule，organize and control all activities to achieve the project goal eventually.no matter how difficult it is and what kind of risks are there.",[170,172,174,176],{"key":20,"text":171,"correct":26},"project work breakdown",{"key":24,"text":173,"correct":26},"project security authentication",{"key":28,"text":175,"correct":22},"project management",{"key":31,"text":177,"correct":26},"project flowchart",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},389841,"（ ）is a term for data sets that are so large or complex that traditional data processing applications are inadequate. Challenges include analysis, capture ，data curation.，search，sharing，storage，transfer，visualization，querying， updating and information privacy.",[182,184,186,188],{"key":20,"text":183,"correct":26},"Data market",{"key":24,"text":185,"correct":26},"Data warehouse",{"key":28,"text":187,"correct":22},"Big data",{"key":31,"text":189,"correct":26},"BI",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},389842,"（71）is the science of hiding information。Whereas the goal of cryptography is to make data unreadable by a third party。the goal of steganography is to hide the data from a third party。In this article,I will discuss what steganography is,what purposes it serves,and will provide an example using available software。 There are a large number of steganographic（2）that most of us are familiar with(especially if you watch a lot of spy movies),ranging from invisible ink and microdots to secreting a hidden message in the second letter of each word of a large body of text and spread spectrum radio communication。With computers and networks,there are many other ways of hiding informations,such as: Covert channels(c,g,Loki and some distributed denial-of-service tools use the Internet Control（3）Protocol,or ICMP,as the communication channel between the“bad guy”and a compromicyed system) Hidden text within Web pages Hiding files in“plain sight”(c,g，what better place to“hide”a file than with an important sounding name in the c:\\winnt system32 directory) Null ciphers(c,g,using the first letter of each word to form a hidden message in an otherwise innocuous text) steganography today,however,is significantly more（4）than the example about suggest,allowing a user to hide large amounts of information within image and audio。These forms of steganography often are used in conjunction with cryptography so the information is double protected;first it is encrypted and then hidden so that an advertisement first。find the information(an often difficult task in and of itself)and the decrypted it。 The simplest approach to hiding data within an image file is called（5）signature insertion。In this method ,we can take the binary representation of the hidden data and the bit of each byte within the covert image。If we are using 24-bit color the amount and will be minimum and indiscriminate to the human eye。 （73）处的单词应是",[194,196,198,200],{"key":20,"text":195,"correct":26},"Member",{"key":24,"text":197,"correct":26},"Management",{"key":28,"text":199,"correct":22},"Message",{"key":31,"text":201,"correct":26},"Mail",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},389843,"In requirements engineering，requirements elicitation is the practice of collecting the requirements of a system from users，customers and other stakeholders，In the following practices. （ ） is rarely used in requirements elicitation.",[206,208,210,212],{"key":20,"text":207,"correct":26},"brain storming",{"key":24,"text":209,"correct":26},"interview",{"key":28,"text":211,"correct":26},"questionnaire",{"key":31,"text":213,"correct":22},"Monte Carlo analysis",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},389844,"Cloud computing is atype of Internet-based computing that provides shared computer processingresources and data to computers and other devices on demand. Advocates claimthat cloud computing allows companies to avoid up-front infrastructure costs.Cloud computing now has few service form, but it is not including （）.",[218,220,222,224],{"key":20,"text":219,"correct":26},"IaaS",{"key":24,"text":221,"correct":26},"PaaS",{"key":28,"text":223,"correct":26},"SaaS",{"key":31,"text":225,"correct":22},"DaaS",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},389845,"Project selection methods involve measuring value or attractiveness to the project owner or sponsor and may include other organizational decision criteria. （ ） is not a project selection method.",[230,232,234,236],{"key":20,"text":231,"correct":26},"Benefit contribution",{"key":24,"text":233,"correct":26},"Expert judgment",{"key":28,"text":235,"correct":26},"Scoring models",{"key":31,"text":237,"correct":22},"Flowcharting",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},389846,"A project manager believes that modifying the scope of the project may provide added value service for the customer. The project manager should （ ） . A.assign change tasks to project members B.call A.meeting of the configuration control board C.change the scope baseline",[242,244,246,248],{"key":20,"text":243,"correct":26},"postpone the modification until",{"key":24,"text":245,"correct":26},"separate enhancement project is funde",{"key":28,"text":247,"correct":26},"after this project is complete",{"key":31,"text":249,"correct":22},"according to the original baseline",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},389847,"The Estimate Activity Resource process is closely coordinated with the （ ） process.",[254,256,258,260],{"key":20,"text":255,"correct":22},"Estimate Costs",{"key":24,"text":257,"correct":26},"Sequence Activities",{"key":28,"text":259,"correct":26},"Plan Communications",{"key":31,"text":261,"correct":26},"Conduct Procurements",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},389848,"（） is a measurable, verifiable work product such as a specification, feasibilitystudy report, detail design document, or working prototype.",[266,268,270,272],{"key":20,"text":267,"correct":26},"Milestone",{"key":24,"text":269,"correct":22},"Deliverable",{"key":28,"text":271,"correct":26},"ETC",{"key":31,"text":273,"correct":26},"BAC",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":20,"analysis":33},389849,"Documentation of a software package is normally produced for two purposes.The other purpose of documentation is to describe the software's internal composition so that the system can be maintained later in its life cycle. Documentation of this type is known as （ ） .",[278,280,282,284],{"key":20,"text":279,"correct":22},"system documentation",{"key":24,"text":281,"correct":26},"user documentation",{"key":28,"text":283,"correct":26},"vender documentation",{"key":31,"text":285,"correct":26},"license documentation",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":20,"analysis":33},389850,"Quality planning tools are often used to help plan effective quality management activities. （ ） is one of such tools，which involves comparing actual or planned project practices to other projects to generate ideas for improvement and to provide a basis by which to measure performance.",[290,292,294,295],{"key":20,"text":291,"correct":22},"Benchmarking",{"key":24,"text":293,"correct":26},"Quality metric",{"key":28,"text":141,"correct":26},{"key":31,"text":296,"correct":26},"Brainstorming",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":20,"analysis":33},389851,"（ ）is the process of determining，documenting ，and managing stakeholder needs and requirements to meet project objectives.",[301,303,305,307],{"key":20,"text":302,"correct":22},"Collecting requirements",{"key":24,"text":304,"correct":26},"Defining requirements",{"key":28,"text":306,"correct":26},"Creating WBS",{"key":31,"text":308,"correct":26},"Requirements analysis",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":31,"analysis":33},389852,"Define Activities is the process of identifying the specific actions to be performed to produce the （ ） .",[313,315,317,319],{"key":20,"text":314,"correct":26},"project elements",{"key":24,"text":316,"correct":26},"work drafts",{"key":28,"text":318,"correct":26},"work package",{"key":31,"text":320,"correct":22},"project deliverables",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":31,"analysis":33},389853,"some team leaders think that the only way to （ ） their team is through cash incentives. However research proves that money is the last thing you would want to use．",[325,327,329,331],{"key":20,"text":326,"correct":26},"arouse",{"key":24,"text":328,"correct":26},"encourage",{"key":28,"text":330,"correct":26},"incite",{"key":31,"text":332,"correct":22},"motivate",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":33,"analysis":33},389854,"Many useful tools and techniques are used in developing schedule． （ ） is a schedule network analysis technique that modifies the project schedule to account for limited resource． A.PERT",[337,339,341],{"key":20,"text":338,"correct":26},"Resource levelling",{"key":24,"text":340,"correct":26},"Schedule compression",{"key":28,"text":342,"correct":26},"Critical chain metho",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":20,"analysis":33},389855,"All of the following are functions of CRM system except （ ）",[347,349,351,353],{"key":20,"text":348,"correct":22},"automation procurement",{"key":24,"text":350,"correct":26},"automation sales",{"key":28,"text":352,"correct":26},"automation marketing",{"key":31,"text":354,"correct":26},"automation customer service",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":20,"analysis":33},389856,"The （ ） process ascertains which risks have the potential of affecting the project and documenting the risks' characteristics. A.Risk Identification",[359,361,363,365],{"key":20,"text":360,"correct":22},"Quantitative Risk Analysis",{"key":24,"text":362,"correct":26},"Qualitative Risk Analysis",{"key":28,"text":364,"correct":26},"Risk Monitoring an",{"key":31,"text":366,"correct":26},"Control",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":28,"analysis":33},389857,"（ ） is primarily concerned with defining and controlling what is and is not included in the project.",[371,373,375,377],{"key":20,"text":372,"correct":26},"Project Time Management",{"key":24,"text":374,"correct":26},"Project Cost Management",{"key":28,"text":376,"correct":22},"Project Scope Management",{"key":31,"text":378,"correct":26},"Project Communications Management",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":31,"analysis":33},389858,"The main types of social networking services are those that contain category places (such as former school year or classmates), means to connect with friends (usually with self-description pages), and a recommendation system linked to （ ） ．",[383,385,387,389],{"key":20,"text":384,"correct":26},"net",{"key":24,"text":386,"correct":26},"interests",{"key":28,"text":388,"correct":26},"other",{"key":31,"text":390,"correct":22},"trust",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":31,"analysis":33},389859,"Establishing a project management timetable involves listing milestones,activities,and（ ）with intended start and finish dates,of which the scheduling of employees may be an element.",[395,397,399,401],{"key":20,"text":396,"correct":26},"relationships",{"key":24,"text":398,"correct":26},"resources",{"key":28,"text":400,"correct":26},"stakeholders",{"key":31,"text":402,"correct":22},"deliverables",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":31,"analysis":33},389860,"wireless LAN,also widely known as WLAN or WIFI,is probably the most well-known member of the IEEE802 protocol family for home users today.It is standardized by （ ） and shares many properties with wired Ethernet.",[407,409,411,413],{"key":20,"text":408,"correct":26},"IEEE 802.1",{"key":24,"text":410,"correct":26},"IEEE 802.3",{"key":28,"text":412,"correct":26},"IEEE 802.5",{"key":31,"text":414,"correct":22},"IEEE 802.11",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":24,"analysis":33},389861,"The inputs of developing project management plan do not include ().",[419,421,423,425],{"key":20,"text":420,"correct":26},"project charter",{"key":24,"text":422,"correct":22},"stakeholder management strategy",{"key":28,"text":424,"correct":26},"project scope statement",{"key":31,"text":426,"correct":26},"outputs from planning processes",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":24,"analysis":33},389862,"Projects are a meanof achieving organizational （）.",[431,433,435,437],{"key":20,"text":432,"correct":26},"culture",{"key":24,"text":434,"correct":22},"strategy",{"key":28,"text":436,"correct":26},"spirit",{"key":31,"text":438,"correct":26},"structure",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":31,"analysis":33},389863,"（ ） describes，in detail，the project’s deliverables and the work required to create those deliverables.",[443,445,447,449],{"key":20,"text":444,"correct":26},"Product scope description",{"key":24,"text":446,"correct":26},"Project objectives",{"key":28,"text":448,"correct":26},"Stakeholder Analysis",{"key":31,"text":450,"correct":22},"The project scope statement",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":31,"analysis":33},389864,"Stakeholder management refers to managing communications to satisfy needs of, and resolve issues with, project stakeholders. The （ ） is useful responsible for stakeholder management.",[455,457,459,461],{"key":20,"text":456,"correct":26},"PMO",{"key":24,"text":458,"correct":26},"CIO",{"key":28,"text":460,"correct":26},"CCB",{"key":31,"text":462,"correct":22},"PM",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":20,"analysis":33},389865,"The workflow enactment service is the heart of a workflow system which consists of several_______.",[467,469,471,473],{"key":20,"text":468,"correct":22},"workflow engines",{"key":24,"text":470,"correct":26},"processes",{"key":28,"text":472,"correct":26},"workflow threads",{"key":31,"text":474,"correct":26},"tasks",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":28,"analysis":33},389866,"The connection between two networks to from an internet is handled by a machine known as a （ ）.",[479,481,483,485],{"key":20,"text":480,"correct":26},"bridge",{"key":24,"text":482,"correct":26},"server",{"key":28,"text":484,"correct":22},"router",{"key":31,"text":486,"correct":26},"switch",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":24,"analysis":33},389867,"Project schedule management is made up of six management processes including: activity definition, activity sequencing, （ ） , and schedule control by order．",[491,493,495,497],{"key":20,"text":492,"correct":26},"activity duration estimating, schedule developing, activity resource estimating",{"key":24,"text":494,"correct":22},"activity resource estimating, activity duration estimating, schedule development",{"key":28,"text":496,"correct":26},"schedule developing, activity resource estimating, activity duration estimating",{"key":31,"text":498,"correct":26},"activity resource estimating, schedule developing, activity duration estimating",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":28,"analysis":33},389868,"If the approved change requests have an effect on the project scope,then the corresponding component documents and cost baselines,and（ ）of the project management plan are revised and reissued to reflect the approved changes.",[503,505,507,509],{"key":20,"text":504,"correct":26},"developing baselines",{"key":24,"text":506,"correct":26},"testing baselines",{"key":28,"text":508,"correct":22},"schedule base lines",{"key":31,"text":510,"correct":26},"ending baselines",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":20,"analysis":33},389869,"Before a project schedule can be created,the schedule maker should have a （ ） ,an effort estimate for each task,and a resource list with availability for each resource.",[515,517,519,521],{"key":20,"text":516,"correct":22},"work breakdown structure",{"key":24,"text":518,"correct":26},"baseline",{"key":28,"text":520,"correct":26},"software requirements specification",{"key":31,"text":522,"correct":26},"plan",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":28,"analysis":33},389870,"按照行为方式，可以将针对操作系统的安全威胁划分为：切断、截取、篡改、伪造四种。其中 （ ） 是对信息完整性的威胁。",[527,529,531,533],{"key":20,"text":528,"correct":26},"切断",{"key":24,"text":530,"correct":26},"截取",{"key":28,"text":532,"correct":22},"篡改",{"key":31,"text":534,"correct":26},"伪造",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":20,"analysis":33},389871,"信息系统安全技术中，关于信息认证、加密、数字签名的描述，正确的是 （ ） 。",[539,541,543,545],{"key":20,"text":540,"correct":22},"数字签名具备发送方不能抵赖、接收方不能伪造的能力",{"key":24,"text":542,"correct":26},"数字签名允许收发双方互相验证其真实性，不准许第三方验证",{"key":28,"text":544,"correct":26},"认证允许收发双方和第三方验证",{"key":31,"text":546,"correct":26},"认证中用来鉴别对象真实性的数据是公开的",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":28,"analysis":33},389872,"2015年国务院发布的《关于积极推进\"互联网+\"行动的指导意见》提出：到（ ）年，网络化、智能化、服务化、协同化的\"互联网+\"产业生态体系基本完善，\"互联网+\"成为经济社会创新发展的重要驱动力量。",[551,553,555,557],{"key":20,"text":552,"correct":26},"2018",{"key":24,"text":554,"correct":26},"2020",{"key":28,"text":556,"correct":22},"2025",{"key":31,"text":558,"correct":26},"2030",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":31,"analysis":33},389873,"在无线通信领域，现在主流应用的是第四代（4 G）通信技术，其理论下载速率可达到 （ ） Mb\u002Fs（兆比特每秒）。",[563,565,567,569],{"key":20,"text":564,"correct":26},"2.6",{"key":24,"text":566,"correct":26},"4",{"key":28,"text":568,"correct":26},"20",{"key":31,"text":165,"correct":22},{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":31,"analysis":33},389874,"在无线通信领域，现在主流应用的是第四代（4 G）通信技术。5G 正在研发中，其理论速度可达到 （ ） 。",[574,576,578,580],{"key":20,"text":575,"correct":26},"50Mb\u002Fs",{"key":24,"text":577,"correct":26},"100Mb\u002Fs",{"key":28,"text":579,"correct":26},"500Mb\u002Fs",{"key":31,"text":581,"correct":22},"1Gb\u002Fs",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":31,"analysis":33},389875,"业务流程重构（BPR）注重结果的同时，更注重流程的实现，所以 BPR 需要遵循一定的原则， （ ） 不属于 BPR 遵循的原则。",[586,588,590,592],{"key":20,"text":587,"correct":26},"以流程为中心的原则",{"key":24,"text":589,"correct":26},"团队管理原则",{"key":28,"text":591,"correct":26},"以客户为导向的原则",{"key":31,"text":593,"correct":22},"风险最小化原则",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":24,"analysis":33},389876,"TCP\u002FIP是Internet的核心协议，应用程序通过用应用层协议利用网络完成数交互的任务，其中， （ ） 是用来在客户机与服务器之间进行简单文件的传输的协议，提供不复杂、开销不大的文件传输服务。",[598,600,602,604],{"key":20,"text":599,"correct":26},"FTP",{"key":24,"text":601,"correct":22},"TFTP",{"key":28,"text":603,"correct":26},"HTTP",{"key":31,"text":605,"correct":26},"SMTP",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":24,"analysis":33},389877,"老于是某银行的系统架构师，他为银行投资管理系统设计的软件架构包括进程通信和事件驱动的系统，该软件架构风格属于 （ ） 。",[610,612,614,616],{"key":20,"text":611,"correct":26},"数据流风格",{"key":24,"text":613,"correct":22},"独立构件风格",{"key":28,"text":615,"correct":26},"仓库风格",{"key":31,"text":617,"correct":26},"虚拟机风格",[619,623,626,629,632,635],{"id":620,"name":621,"category":7,"favorite":622},136,"法律职业试卷二(客观题 )",2,{"id":624,"name":625,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":627,"name":628,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":630,"name":631,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":633,"name":634,"category":7,"favorite":8},28,"安全工程师",{"id":636,"name":637,"category":7,"favorite":8},112,"安全生产法律知识"]