[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-32":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":612},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,32,50,1856,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,188,200,212,224,236,246,258,270,282,294,306,316,328,340,352,364,376,388,400,412,423,434,444,456,468,480,492,504,516,528,540,552,564,576,588,600],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},389778,1,"单选题","（ ） is responsible for the attraction，selection，training，assessment，and rewarding of employees，while also overseeing organizational leadership and culture，and ensuring compliance with employment and labor laws. A.Human resource management",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","Strategi",true,{"key":24,"text":25,"correct":26},"B","analysis",false,{"key":28,"text":29,"correct":26},"C","Team management",{"key":31,"text":32,"correct":26},"D","RACI","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},389779,"The creation of a work breakdown structure（WBS）is the process of （ ） the major project deliverables.",[38,40,42,44],{"key":20,"text":39,"correct":22},"subdividing",{"key":24,"text":41,"correct":26},"assessing",{"key":28,"text":43,"correct":26},"planning",{"key":31,"text":45,"correct":26},"integrating",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},389780,"setting redundant components in subsystem to handle with the risks brought by the defaults of original components,what kind of risk response strategy is this? （ ） ．",[50,52,54,56],{"key":20,"text":51,"correct":26},"risk avoidance",{"key":24,"text":53,"correct":26},"risk acceptance",{"key":28,"text":55,"correct":22},"risk mitigation",{"key":31,"text":57,"correct":26},"contingency plan",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},389781,"The scope management plan is how the team will prepare the（ ）a document that includes descriptions of create the WBS,verify completion of the project deliverables,and control requests for changes to the project scope.",[62,64,66,68],{"key":20,"text":63,"correct":26},"project charter",{"key":24,"text":65,"correct":26},"project scope goal",{"key":28,"text":67,"correct":26},"project budget",{"key":31,"text":69,"correct":22},"project scope statement",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},389782,"（） are individuals and organizations that are actively involved in the project, orwhose interests may be affected as a result of project execution or project completion; they mayalso exert influence over the project and its results.",[74,76,78,80],{"key":20,"text":75,"correct":26},"Controls",{"key":24,"text":77,"correct":26},"Baselines",{"key":28,"text":79,"correct":22},"Project stakeholders",{"key":31,"text":81,"correct":26},"Project managers",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},389783,"The （） technique involves using project characteristics in a mathematical modelto predict total project costs. Models can be simple or complex. A.Cost Aggregation",[86,88,90,92],{"key":20,"text":87,"correct":26},"Reserve Analysis",{"key":24,"text":89,"correct":26},"Parametri",{"key":28,"text":91,"correct":22},"Estimating",{"key":31,"text":93,"correct":26},"Funding Limit Reconciliation",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},389784,"After acceptance and formal transfer of information systems to customers,it has entered the stage of（ ）. A.preparation",[98,100,102,104],{"key":20,"text":99,"correct":26},"operation an",{"key":24,"text":101,"correct":22},"maintenance",{"key":28,"text":103,"correct":26},"development",{"key":31,"text":105,"correct":26},"Extinction",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},389785,"（ ） is a collection or projects and other work that are grouped together to facilitate effective management of that work to meet strategic business objectives.",[110,112,114,116],{"key":20,"text":111,"correct":26},"program",{"key":24,"text":113,"correct":22},"portfolio",{"key":28,"text":115,"correct":26},"project of large size",{"key":31,"text":117,"correct":26},"PMO",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},389786,"The cost performance index（CPI） is the ratio of earned value to （ ） and can be used to estimate the projected cost of completing the project.",[122,124,126,128],{"key":20,"text":123,"correct":26},"A. cost variance",{"key":24,"text":125,"correct":26},"B.planne cost",{"key":28,"text":127,"correct":26},"Planne value",{"key":31,"text":129,"correct":22},"actual cost",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},389787,"The TCP protocol is a （ ） layer protocol.",[134,136,138,140],{"key":20,"text":135,"correct":26},"physical",{"key":24,"text":137,"correct":26},"network",{"key":28,"text":139,"correct":22},"transport",{"key":31,"text":141,"correct":26},"application",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},389788,"（ ） is a type of bar chart that illustrates a project schedule. It illustrates the start and finish dates of the terminal elements and summary elements of a project.",[146,148,150,152],{"key":20,"text":147,"correct":22},"gantt chart",{"key":24,"text":149,"correct":26},"project histogram",{"key":28,"text":151,"correct":26},"milestone chart",{"key":31,"text":153,"correct":26},"project flowchart",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},389789,"Project work packages are typically decomposed into smaller components called activities to provide a basis for （ ） , scheduling, executing, and monitoring and controlling the project work.",[158,160,162,164],{"key":20,"text":159,"correct":26},"reviewing",{"key":24,"text":161,"correct":22},"estimating",{"key":28,"text":163,"correct":26},"auditing",{"key":31,"text":165,"correct":26},"expecting",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},389790,"The life cycle provides the basic （）for managing the project, regardless of the specific work involved.",[170,172,174,176],{"key":20,"text":171,"correct":26},"plan",{"key":24,"text":173,"correct":26},"fraction",{"key":28,"text":175,"correct":26},"main",{"key":31,"text":177,"correct":22},"framework",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},389791,"Developing the project schedule is often an iterative process. It determines the planned start and finish dates for project activities and milestones. Schedule development can require the review and revision of duration estimates and resource estimates to create an approved project schedule that can serve as a baseline to （ ） progress. A.analyze",[182,184,186],{"key":20,"text":183,"correct":26},"track",{"key":24,"text":185,"correct":22},"level",{"key":28,"text":187,"correct":26},"exten",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":28,"analysis":33},389792,"Information，in its most restricted technical sense，is asegue of symbols that can be interpreted as a message.information can be recorded as signs，or transmitted as （ ） .",[192,194,196,198],{"key":20,"text":193,"correct":26},"symbols",{"key":24,"text":195,"correct":26},"message",{"key":28,"text":197,"correct":22},"signals",{"key":31,"text":199,"correct":26},"wave",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":20,"analysis":33},389793,"Many of the activities performed during the preliminary investigation are still being conducted in （ ）, but in much greater depth than before.",[204,206,208,210],{"key":20,"text":205,"correct":22},"analysis phase",{"key":24,"text":207,"correct":26},"design phase",{"key":28,"text":209,"correct":26},"implementation phase",{"key":31,"text":211,"correct":26},"maintenance phase",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},389794,"Competitive pricing，product （ ） And performance improvements result from competitive practices",[216,218,220,222],{"key":20,"text":217,"correct":26},"recession",{"key":24,"text":219,"correct":22},"innovation",{"key":28,"text":221,"correct":26},"crisis",{"key":31,"text":223,"correct":26},"ability",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":24,"analysis":33},389795,"The _____ is a general description of the architecture of a workflow management system used by the WFM C，in which the main components and the associated interfaces are summarized.",[228,230,232,234],{"key":20,"text":229,"correct":26},"waterfall model",{"key":24,"text":231,"correct":22},"workflow reference model",{"key":28,"text":233,"correct":26},"evolutionary model",{"key":31,"text":235,"correct":26},"spiral model",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":20,"analysis":33},389796,"Schedule compression shortens the project schedule without changing the project scope,to meet schedule constraints,imposed dates,or other schedule objectives.Schedule compression techniques include crashing and（ ）. A.fast tracking",[240,242,244],{"key":20,"text":241,"correct":22},"what-if scenario analysis",{"key":24,"text":243,"correct":26},"resource leveling",{"key":28,"text":245,"correct":26},"critical chain metho",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":20,"analysis":33},389797,"The difference value between Budgeted Cost for Work Performed and Actual Cost for Work Performed is ( ). A.Cost Variance B.Schedule Variance",[250,252,254,256],{"key":20,"text":251,"correct":22},"Earne",{"key":24,"text":253,"correct":26},"Value",{"key":28,"text":255,"correct":26},"Cost Performe",{"key":31,"text":257,"correct":26},"Index",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":31,"analysis":33},389798,"Estimating activity durations uses information on activity scope of （ ） , required resource types, estimated resource quantities, and resource calendars.",[262,264,266,268],{"key":20,"text":263,"correct":26},"milestone",{"key":24,"text":265,"correct":26},"baseline",{"key":28,"text":267,"correct":26},"quality",{"key":31,"text":269,"correct":22},"work",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":28,"analysis":33},389799,"Competitive pricing help ensure that government authorities get the best （ ） for the public they serve.",[274,276,278,280],{"key":20,"text":275,"correct":26},"help",{"key":24,"text":277,"correct":26},"server",{"key":28,"text":279,"correct":22},"value",{"key":31,"text":281,"correct":26},"policy",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":20,"analysis":33},389800,"the （ ） is primarily concerned with acceptance of the deliverables.while quality control is primarily concerned with correctness of the deliverables and meeting the quality requirements specified for the deliverables．",[286,288,290,292],{"key":20,"text":287,"correct":22},"verify scope",{"key":24,"text":289,"correct":26},"define scope",{"key":28,"text":291,"correct":26},"quality assurance",{"key":31,"text":293,"correct":26},"validate scope",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":28,"analysis":33},389801,"The Unified Modeling Language is a standard graphical language for modeling object-oriented software. （ ） can show the behavior of systems in terms of how objects interact with each other.",[298,300,302,304],{"key":20,"text":299,"correct":26},"Class diagram",{"key":24,"text":301,"correct":26},"Component diagram",{"key":28,"text":303,"correct":22},"Sequence diagram",{"key":31,"text":305,"correct":26},"Use case diagram",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":20,"analysis":33},389802,"（ ）a method of obtaining early feedback on requirements by providing aworking model of the expected product before actually building it. A.Prototypes B.Object oriented",[310,312,314],{"key":20,"text":311,"correct":22},"Structure",{"key":24,"text":313,"correct":26},"method",{"key":28,"text":315,"correct":26},"Iterative metho",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":20,"analysis":33},389803,"（71）is the science of hiding information。Whereas the goal of cryptography is to make data unreadable by a third party。the goal of steganography is to hide the data from a third party。In this article,I will discuss what steganography is,what purposes it serves,and will provide an example using available software。 There are a large number of steganographic（2）that most of us are familiar with(especially if you watch a lot of spy movies),ranging from invisible ink and microdots to secreting a hidden message in the second letter of each word of a large body of text and spread spectrum radio communication。With computers and networks,there are many other ways of hiding informations,such as: Covert channels(c,g,Loki and some distributed denial-of-service tools use the Internet Control（3）Protocol,or ICMP,as the communication channel between the“bad guy”and a compromicyed system) Hidden text within Web pages Hiding files in“plain sight”(c,g，what better place to“hide”a file than with an important sounding name in the c:\\winnt system32 directory) Null ciphers(c,g,using the first letter of each word to form a hidden message in an otherwise innocuous text) steganography today,however,is significantly more（4）than the example about suggest,allowing a user to hide large amounts of information within image and audio。These forms of steganography often are used in conjunction with cryptography so the information is double protected;first it is encrypted and then hidden so that an advertisement first。find the information(an often difficult task in and of itself)and the decrypted it。 The simplest approach to hiding data within an image file is called（5）signature insertion。In this method ,we can take the binary representation of the hidden data and the bit of each byte within the covert image。If we are using 24-bit color the amount and will be minimum and indiscriminate to the human eye。 （71）处的单词应是",[320,322,324,326],{"key":20,"text":321,"correct":22},"Cryptography",{"key":24,"text":323,"correct":26},"Geography",{"key":28,"text":325,"correct":26},"Stenography",{"key":31,"text":327,"correct":26},"Steganography",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":20,"analysis":33},389804,"the following diagram is （ ） network topology structure．",[332,334,336,338],{"key":20,"text":333,"correct":22},"bus",{"key":24,"text":335,"correct":26},"star",{"key":28,"text":337,"correct":26},"ring",{"key":31,"text":339,"correct":26},"tree",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":24,"analysis":33},389805,"Most operating systems have a standard set of ( ) to handle the processing of all input and output instructions. A.spreadsheet",[344,346,348,350],{"key":20,"text":345,"correct":26},"control instructions",{"key":24,"text":347,"correct":22},"I\u002FO operation",{"key":28,"text":349,"correct":26},"dat",{"key":31,"text":351,"correct":26},"table",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":24,"analysis":33},389806,"Your have just taken control of a project in the middle of execution and need to learn who has approval authority for revisions in scope. （ ） document provides this information.",[356,358,360,362],{"key":20,"text":357,"correct":26},"Resource assignment matrix",{"key":24,"text":359,"correct":22},"Change control plan",{"key":28,"text":361,"correct":26},"Project charter",{"key":31,"text":363,"correct":26},"Client organization chart",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":20,"analysis":33},389807,"（71）is the science of hiding information。Whereas the goal of cryptography is to make data unreadable by a third party。the goal of steganography is to hide the data from a third party。In this article,I will discuss what steganography is,what purposes it serves,and will provide an example using available software。 There are a large number of steganographic（2）that most of us are familiar with(especially if you watch a lot of spy movies),ranging from invisible ink and microdots to secreting a hidden message in the second letter of each word of a large body of text and spread spectrum radio communication。With computers and networks,there are many other ways of hiding informations,such as: Covert channels(c,g,Loki and some distributed denial-of-service tools use the Internet Control（3）Protocol,or ICMP,as the communication channel between the“bad guy”and a compromicyed system) Hidden text within Web pages Hiding files in“plain sight”(c,g，what better place to“hide”a file than with an important sounding name in the c:\\winnt system32 directory) Null ciphers(c,g,using the first letter of each word to form a hidden message in an otherwise innocuous text) steganography today,however,is significantly more（4）than the example about suggest,allowing a user to hide large amounts of information within image and audio。These forms of steganography often are used in conjunction with cryptography so the information is double protected;first it is encrypted and then hidden so that an advertisement first。find the information(an often difficult task in and of itself)and the decrypted it。 The simplest approach to hiding data within an image file is called（5）signature insertion。In this method ,we can take the binary representation of the hidden data and the bit of each byte within the covert image。If we are using 24-bit color the amount and will be minimum and indiscriminate to the human eye。 （75）处的单词应是",[368,370,372,374],{"key":20,"text":369,"correct":22},"least",{"key":24,"text":371,"correct":26},"most",{"key":28,"text":373,"correct":26},"much",{"key":31,"text":375,"correct":26},"less",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":20,"analysis":33},389808,"A project life cycle is a collection of generally sequential project （）whose name and number are determined by the control needs of the organization or organizations involved in the project.",[380,382,384,386],{"key":20,"text":381,"correct":22},"phases",{"key":24,"text":383,"correct":26},"processes",{"key":28,"text":385,"correct":26},"segments",{"key":31,"text":387,"correct":26},"pieces",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":31,"analysis":33},389809,"During this phase，the analyst must must develop enough knowledge about the （ ）and the existing systems to enable an effective solution to be proposed and implemented.",[392,394,396,398],{"key":20,"text":393,"correct":26},"hardware environment",{"key":24,"text":395,"correct":26},"testing environment",{"key":28,"text":397,"correct":26},"software environment",{"key":31,"text":399,"correct":22},"business environment",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":24,"analysis":33},389810,"Your project is behind schedule due to conflict between team members. Having resolved the conflict，to get the project back on schedule，you should consider （ ） .",[404,406,408,410],{"key":20,"text":405,"correct":26},"crashing the schedule",{"key":24,"text":407,"correct":22},"performing resource leveling",{"key":28,"text":409,"correct":26},"conducting reverse resource allocation scheduling",{"key":31,"text":411,"correct":26},"utilizing the critical chair resources",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":24,"analysis":33},389811,"（ ） is used to model aggregates of information and the relationships these aggregates have to other. A.Dat",[416,418,420,421],{"key":20,"text":417,"correct":26},"flow diagram",{"key":24,"text":419,"correct":22},"Entity relationship diagram",{"key":28,"text":303,"correct":26},{"key":31,"text":422,"correct":26},"Structure diagram",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":28,"analysis":33},389812,"Cloud-computing providers offer their“services”according to differentmodels,which happen to form a stack（ ）,platform as a service(Paas),software as a service(SaaS). A.hardware as A.service(Haas) B.network as A.service(Naas) C.infrastructure as",[427,429,430,432],{"key":20,"text":428,"correct":26},"service(IaaS)",{"key":24,"text":349,"correct":26},{"key":28,"text":431,"correct":22},"as",{"key":31,"text":433,"correct":26},"service(DaaS)",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":24,"analysis":33},389813,"Cloud computing provides on-demand service to users by using distributed computing and（ ）resource management. A.network",[438,440,442],{"key":20,"text":439,"correct":26},"virtual",{"key":24,"text":441,"correct":22},"centralized",{"key":28,"text":443,"correct":26},"specialize",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":28,"analysis":33},389814,"In the （ ） phase team members begin to work together and adjust their work habits and behaviors to support the team．The team learns to trust each other．",[448,450,452,454],{"key":20,"text":449,"correct":26},"storming",{"key":24,"text":451,"correct":26},"performing",{"key":28,"text":453,"correct":22},"norming",{"key":31,"text":455,"correct":26},"adjourning",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":31,"analysis":33},389815,"Some team leaders think that the only way to ( )their team is through cash incentives. However research proves that money is the last thing you would want to use.",[460,462,464,466],{"key":20,"text":461,"correct":26},"arouse",{"key":24,"text":463,"correct":26},"encourage",{"key":28,"text":465,"correct":26},"incite",{"key":31,"text":467,"correct":22},"motivate",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":24,"analysis":33},389816,"Each machine in the internet is assigned a unique network address，called （ ） ，that is used to identify the machine for communication purposes.",[472,474,476,478],{"key":20,"text":473,"correct":26},"MAC address",{"key":24,"text":475,"correct":22},"IP address",{"key":28,"text":477,"correct":26},"host address",{"key":31,"text":479,"correct":26},"domain name address",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":20,"analysis":33},389817,"Quality management ensures that an organization , product or service is （ ）.",[484,486,488,490],{"key":20,"text":485,"correct":22},"guaranteed",{"key":24,"text":487,"correct":26},"sustain",{"key":28,"text":489,"correct":26},"good",{"key":31,"text":491,"correct":26},"consistent",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":20,"analysis":33},389818,"In an Information system.The（ ）is the bridge between hardware and people.",[496,498,500,502],{"key":20,"text":497,"correct":22},"keyboard",{"key":24,"text":499,"correct":26},"internet",{"key":28,"text":501,"correct":26},"disk",{"key":31,"text":503,"correct":26},"data",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":28,"analysis":33},389819,"The communication management plan determines the information and communications needs of the stakeholders. In the following statements related to communication management plan. （ ） is false. A.The communication management plan is contained in or is A.subsidiary plan of, the project management plan.",[508,510,512,514],{"key":20,"text":509,"correct":26},"The communication management plan can be formal or informal, highly detaile",{"key":24,"text":511,"correct":26},"or broadly framed, and based on the needs of the project.",{"key":28,"text":513,"correct":22},"The communication manamgement plan organize and summarize the information gathered, and present the results of any analysis as comparedthe performance measurement baseline.",{"key":31,"text":515,"correct":26},"The communication management plan can include guidelines project status meetings, project team meetings, e-meetines, and e-mail.",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":20,"analysis":33},389820,"In software engineering the design phase is divided into ( ).",[520,522,524,526],{"key":20,"text":521,"correct":22},"system design and detailed design",{"key":24,"text":523,"correct":26},"computer design and program design",{"key":28,"text":525,"correct":26},"system design and hardware design",{"key":31,"text":527,"correct":26},"computer design and detailed design",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":24,"analysis":33},389821,"（ ）promies to streamline the on-demind provisioning of software，hardware，and data as a service，chieving economies of scale in IT solutions′deplopment and operation.",[532,534,536,538],{"key":20,"text":533,"correct":26},"Big data",{"key":24,"text":535,"correct":22},"Cloud ccmpiting",{"key":28,"text":537,"correct":26},"Internet",{"key":31,"text":539,"correct":26},"CPS",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":24,"analysis":33},389822,"The most crucial time for project risk assessment is （ ） .",[544,546,548,550],{"key":20,"text":545,"correct":26},"when a problem surfaces",{"key":24,"text":547,"correct":22},"during the planning phase",{"key":28,"text":549,"correct":26},"during the close-out phase",{"key":31,"text":551,"correct":26},"after the project schedule has been published",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":31,"analysis":33},389823,"（ ） is the process of documenting. Analyzing，tracing，prioritizing and agreeing on requirements and then controlling change and communicating to relevant stakeholders. It is a continuous process throughout a project.",[556,558,560,562],{"key":20,"text":557,"correct":26},"Integrated management",{"key":24,"text":559,"correct":26},"Configuration management",{"key":28,"text":561,"correct":26},"Scope management",{"key":31,"text":563,"correct":22},"Requirements management",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":20,"analysis":33},389824,"An example of scope verification is （ ）. A.review the performance of an installed software module",[568,570,572,574],{"key":20,"text":569,"correct":22},"managing changes to the project schedule",{"key":24,"text":571,"correct":26},"decomposing the WBS to a work package level",{"key":28,"text":573,"correct":26},"performing a benefit\u002Fcost analysis to determine if we should procee",{"key":31,"text":575,"correct":26},"with the project",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":28,"analysis":33},389825,"The deliverable from this phase also includes the （ ） for the proposed system.",[580,582,584,586],{"key":20,"text":581,"correct":26},"hardware and software specification",{"key":24,"text":583,"correct":26},"system performance specification",{"key":28,"text":585,"correct":22},"formal requirements definition",{"key":31,"text":587,"correct":26},"general problem statement",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":24,"analysis":33},389826,"（ ）estimating is a technique for estimating the duration or cost of an activity ou project using historical data from a similar activity or project.",[592,594,596,598],{"key":20,"text":593,"correct":26},"Parametric",{"key":24,"text":595,"correct":22},"Analogous",{"key":28,"text":597,"correct":26},"Three-point",{"key":31,"text":599,"correct":26},"Expert judgment",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":31,"analysis":33},389827,"There are strategies typically deal with threats or risks that may have negative impacts on project objectives if they occur. Some other strategies are suggested to deal with risks with potentially positive impacts. （ ） is a risk response strategy that may be adopted for either threats or opportunities.",[604,606,608,610],{"key":20,"text":605,"correct":26},"Share",{"key":24,"text":607,"correct":26},"Mitigate",{"key":28,"text":609,"correct":26},"Transfer",{"key":31,"text":611,"correct":22},"Acceptance",[613,617,620,623,626,629],{"id":614,"name":615,"category":7,"favorite":616},136,"法律职业试卷二(客观题 )",2,{"id":618,"name":619,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":621,"name":622,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":624,"name":625,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":627,"name":628,"category":7,"favorite":8},28,"安全工程师",{"id":630,"name":631,"category":7,"favorite":8},112,"安全生产法律知识"]