[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-31":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":590},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,31,50,1856,[13,34,46,58,70,82,92,101,110,118,130,142,154,166,178,190,202,214,226,235,247,256,266,276,288,299,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,509,520,532,544,554,566,578],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},389728,1,"单选题","某饲养场饲养了某种动物，每只动物每天至少需要蛋白质200克、矿物质4克、维生素5毫克。市场上销售的甲乙两种饲料每千克的营养成分及单价如下。 因此，饲养每只动物至少需要饲料成本 （ ） 元。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","6",false,{"key":24,"text":25,"correct":26},"B","8",true,{"key":28,"text":29,"correct":22},"C","10",{"key":31,"text":32,"correct":22},"D","12","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},389729,"某企业开发了一种新产品，拟定的价格方案有三种，较高价、中等价、较低价，估计这种产品的销售状态也有三种，销路较好、销路一般、销路较差。根据以往的销售经验，他们算出。这三种价格方案在三种销路状态下的收益值如下表所示。 企业一旦选择了某种决策方案，在同样的销路状态下，可能会产生后悔值（即所选决策方案产生的收益与最佳决策收益值的差值）。例如，如果选择较低价格决策，在销路较好时，后悔值就为8万元。因此，可以根据上述收益值表制作后悔值如下表所示（空缺部分有待计算）。 企业做定价决策前，首先需要选择决策标准。该企业决定采用最小—最大后悔值决策标准（坏中求好的保守策略），为此，该企业应选择决策方案 （ ） 。",[38,40,42,44],{"key":20,"text":39,"correct":22},"较高价",{"key":24,"text":41,"correct":26},"中等价",{"key":28,"text":43,"correct":22},"较低价",{"key":31,"text":45,"correct":22},"中等价或较低价",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},389730,"某地区仅有甲、乙两个企业为销售同种电子产品竞争市场份额。甲企业有三种策略 A、 B、 C，乙企业也有三种策略Ⅰ、Ⅱ、Ⅲ。两企业分别独立地选择各种策略时，预计甲企业将增加的市场份额（百分点）见下表（负值表示乙企业将增加的市场份额）。若两企业都采纳稳妥的保守思想（从最坏处着想，争取最好的结果），则（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"A.甲选择策略 B，乙选择策略Ⅲ",{"key":24,"text":53,"correct":22},"B.甲选择策略 A，乙选择策略Ⅱ",{"key":28,"text":55,"correct":22},"甲选择策略乙选择策略Ⅱ",{"key":31,"text":57,"correct":26},"甲选择策略乙选择策略Ⅲ",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},389731,"有一辆货车每天沿着公路给4个零售店运送6箱货物，如果各零售店出售该货物所得利润如下表所示，适当规划在各零售店卸下的货物的箱数，可获得最大利润 （ ） 万元。",[62,64,66,68],{"key":20,"text":63,"correct":22},"15",{"key":24,"text":65,"correct":26},"17",{"key":28,"text":67,"correct":22},"19",{"key":31,"text":69,"correct":22},"21",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},389732,"某项目有Ⅰ、Ⅱ、Ⅲ、Ⅳ四项不同任务，恰有甲、乙、丙、丁四个人去完成各项不同的任务。由于任务性质及每人的技术水平不同，他们完成各项任务所需时间也不同，具体如下表所示。项目要求每个人只能完成一项任务，为了使项目花费的总时间最短，应该指派丁完成（ ） 任务。",[74,76,78,80],{"key":20,"text":75,"correct":22},"Ⅰ",{"key":24,"text":77,"correct":22},"Ⅱ",{"key":28,"text":79,"correct":26},"Ⅲ",{"key":31,"text":81,"correct":22},"Ⅳ",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},389733,"己知有6个村子，相互之间道路的距离如下图所示。现拟合建一所小学。己知甲村有小学生50人，乙村40人，丙村60人，丁村20人，戊村70人，己村90人。从甲村到乙村的最短路程是（ ） 。",[86,87,89,90],{"key":20,"text":29,"correct":22},{"key":24,"text":88,"correct":26},"11",{"key":28,"text":32,"correct":22},{"key":31,"text":91,"correct":22},"14",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":24,"analysis":33},389734,"载重量限24吨的某架货运飞机执行将一批金属原料运往某地的任务。待运输的各箱原料的重量、运输利润如下表所示。经优化安排，该飞机本次运输可以获得的最大利润为 （ ） 千元。",[96,97,98,100],{"key":20,"text":88,"correct":22},{"key":24,"text":29,"correct":26},{"key":28,"text":99,"correct":22},"9",{"key":31,"text":25,"correct":22},{"id":102,"libraryId":5,"type":15,"typeLabel":16,"stem":103,"options":104,"answer":28,"analysis":33},389735,"假设每台机床只能完成一道工序，现有四道工序需要分配到四台机床上，分配成本（以元计）如下所表示，由于工艺要求，工序一不能分配到机床丙上，工序三又不能分配到机床丁上。成本最低的分配方案中，其成本是 （ ）",[105,106,108,109],{"key":20,"text":32,"correct":22},{"key":24,"text":107,"correct":22},"13",{"key":28,"text":91,"correct":26},{"key":31,"text":63,"correct":22},{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":28,"analysis":33},389736,"某项目由并行的3个活动甲、乙和丙组成，为活动甲分配3人5天可以完成，活动乙分配6人7天可以完成，活动丙分配4人2天可以完成，活动完成后人员可再调配。在此情况下，人员最少配置为（ ）。",[114,115,116,117],{"key":20,"text":21,"correct":22},{"key":24,"text":99,"correct":22},{"key":28,"text":29,"correct":26},{"key":31,"text":107,"correct":22},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},389737,"请作答第2空：",[122,124,126,128],{"key":20,"text":123,"correct":22},"O(lgn)",{"key":24,"text":125,"correct":26},"O(n",{"key":28,"text":127,"correct":22},"O(n2)",{"key":31,"text":129,"correct":22},"O(nlgn)",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},389738,"某企业需要采用甲、乙、丙三种原材料生产Ⅰ、Ⅱ两种产品。生产两种产品所需原材料数量、单位产品可获得利润以及企业现有原材料数如表所示：取得最大利润时，原材料 （ ） 尚有剩余。",[134,136,138,140],{"key":20,"text":135,"correct":26},"甲",{"key":24,"text":137,"correct":22},"乙",{"key":28,"text":139,"correct":22},"丙",{"key":31,"text":141,"correct":22},"乙和丙",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},389739,"三个备选投资方案的决策损益表如下，如果采用最大最小决策标准（悲观主义），则选择 （ ） 。",[146,148,150,152],{"key":20,"text":147,"correct":22},"方案A",{"key":24,"text":149,"correct":22},"方案B",{"key":28,"text":151,"correct":26},"方案C",{"key":31,"text":153,"correct":22},"方案D",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},389740,"某工厂生产甲、乙两种产品，生产1公斤甲产品需要煤9公斤、电4度、油3公斤，生产1公斤乙产品需要煤4公斤、电5度、油10公斤。该工厂现有煤360公斤、电200度、油300公斤。已知甲产品每公斤利润为7千元，乙产品每公斤利润为1.2万元，为了获取最大利润应该生产乙产品 （ ） 公斤。",[158,160,162,164],{"key":20,"text":159,"correct":22},"22",{"key":24,"text":161,"correct":22},"23",{"key":28,"text":163,"correct":26},"24",{"key":31,"text":165,"correct":22},"25",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},389741,"某公司准备将新招聘的4名销售员分配到下属3个销售点甲、乙和丙。各销售点增加若干名销售员后可增加的月销售额如下表： 根据此表，只要人员分配适当，公司每月最多可以增加销售额 （ ） 千元。",[170,172,174,176],{"key":20,"text":171,"correct":22},"43",{"key":24,"text":173,"correct":22},"47",{"key":28,"text":175,"correct":26},"48",{"key":31,"text":177,"correct":22},"49",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},389742,"决策树分析法通常用决策树图表进行分析，根据下图的决策树分析法计算，图中机会节点的预期收益EMV分别是90和 （ ） （单位：万元）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"160",{"key":24,"text":185,"correct":22},"150",{"key":28,"text":187,"correct":26},"140",{"key":31,"text":189,"correct":22},"100",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},389743,"项目经理向客户推荐了四种供应商选择方案。每个方案损益值已标在下面的决策树上。根据预期收益值，应选择设备供应商 （ ）",[194,196,198,200],{"key":20,"text":195,"correct":26},"1",{"key":24,"text":197,"correct":22},"2",{"key":28,"text":199,"correct":22},"3",{"key":31,"text":201,"correct":22},"4",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},389744,"下图是一个选择出行路线的“决策树图”，统计路线1和路线2堵车和不堵车的用时和其发生的概率（P），计算出路线1和路线2的加权平均用时，根据计算结果选择出行路线。以下结论中，正确的是（ ） 。",[206,208,210,212],{"key":20,"text":207,"correct":26},"路线1的加权平均用时为4 0.5分钟，路线2的加权平均用时为4 8分钟，因此选择路线1",{"key":24,"text":209,"correct":22},"路线1的加权平均用时为6 2.5分钟，路线2的加权平均用时为4 0分钟，因此选择路线2",{"key":28,"text":211,"correct":22},"路线1的加权平均用时为4 0.5分钟，路线2的加权平均用时为4 4分钟，因此选择路线1",{"key":31,"text":213,"correct":22},"由于路线2堵车和不堵车时间都比路线1短；因此选择路线2",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},389745,"用一辆载重量为 10 吨的卡车装运某仓库中的货物（不用考虑装车时货物的大小），这些货物单件的重量和运输利润如下表。适当选择装运一些货物各若干件，就能获得最大总利润（ ）元。",[218,220,222,224],{"key":20,"text":219,"correct":22},"530",{"key":24,"text":221,"correct":22},"534",{"key":28,"text":223,"correct":22},"536",{"key":31,"text":225,"correct":26},"538",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},389746,"某工厂生产甲、乙两种产品，生产1公斤甲产品需要煤9公斤、电4度、油3公斤，生产1公斤乙产品需要煤4公斤、电5度、油10公斤。该工厂现有煤360公斤、电200度、油300公斤。已知甲产品每公斤利润为7千元，乙产品每公斤利润为1.2万元，为了获取最大利润应该生产甲产品 （ ） 公斤。",[230,232,233,234],{"key":20,"text":231,"correct":26},"20",{"key":24,"text":69,"correct":22},{"key":28,"text":159,"correct":22},{"key":31,"text":161,"correct":22},{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":24,"analysis":33},389747,"两家工厂A1和A2向三个零售店B1、B2和B3供应某种商品。A1和A2可供应的商品件数是200和300，而B1、B2和B3的需求量是100件、200件和50件。各工厂和零售店之间可以进行转运。如果运输的单位成本如下所示（例如：表中第4列第3行的数字“5”表示将一件商品从A2运到B1的成本）。 在最优的转运安排中，满足各零售商需求的运输总成本是 （ ） 。",[239,241,243,245],{"key":20,"text":240,"correct":22},"1750",{"key":24,"text":242,"correct":26},"1550",{"key":28,"text":244,"correct":22},"1350",{"key":31,"text":246,"correct":22},"850",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":24,"analysis":33},389748,"某市场上某种零件由甲、乙、丙、丁四厂供货，供货数量之比为 4:3:2:1。各厂产品的合格率分别为 99%、 98%、97.5%和 95%。某抽检员发现了一件次品，它属于（ ）厂的概率最大。",[251,252,253,254],{"key":20,"text":135,"correct":22},{"key":24,"text":137,"correct":26},{"key":28,"text":139,"correct":22},{"key":31,"text":255,"correct":22},"丁",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":31,"analysis":33},389749,"某项目年生产能力为8万台，年固定成本为1000万元，预计产品单台售价为500元，单台产品可变成本为300元。则项目的盈亏平衡点产量为（ ）万台。",[260,262,263,264],{"key":20,"text":261,"correct":22},"1.3",{"key":24,"text":197,"correct":22},{"key":28,"text":201,"correct":22},{"key":31,"text":265,"correct":26},"5",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":24,"analysis":33},389750,"某企业需要采用甲、乙、丙三种原材料生产Ⅰ、Ⅱ两种产品。生产两种产品所需原材料数量、单位产品可获得利润以及企业现有原材料数如表所示： 则公司可以获得的最大利润是 （ ） 万元。",[270,271,273,275],{"key":20,"text":69,"correct":22},{"key":24,"text":272,"correct":26},"34",{"key":28,"text":274,"correct":22},"39",{"key":31,"text":175,"correct":22},{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":24,"analysis":33},389751,"某企业要投产一种新产品，生产方案有四个：A新建全自动生产线；B新建半自动生产线；C购置旧生产设备；D外包加工生产。未来该产品的销售前景估计为很好、一般和较差三种、不同情况下该产品的收益值如下：（单位：百万元） 用后悔值（在同样的条件下，宣传方案所产生的收益损失值）的方案决策应该选（ ）方案。",[280,282,284,286],{"key":20,"text":281,"correct":22},"新建全自动生产线",{"key":24,"text":283,"correct":26},"新建半自动生产线",{"key":28,"text":285,"correct":22},"购置旧生产设备",{"key":31,"text":287,"correct":22},"外包加工生产",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":31,"analysis":33},389752,"某软件的工作量是20000行，由4人组成的开发小组开发，每个程序员的生产效率是5000行\u002F人月，每对程序员的沟通成本是250行\u002F人月，则该软件需要开发 （ ） 月。",[292,293,295,297],{"key":20,"text":195,"correct":22},{"key":24,"text":294,"correct":22},"1.04",{"key":28,"text":296,"correct":22},"1.05",{"key":31,"text":298,"correct":26},"1.08",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":28,"analysis":33},389753,"已知网络图各段路线所需费用如下图所示，图中甲线和乙线上的数宇分别代表相应点的有关费用。从甲线到乙线的最小费用为（ ） 。",[303,305,307,308],{"key":20,"text":304,"correct":22},"1 5",{"key":24,"text":306,"correct":22},"16",{"key":28,"text":65,"correct":26},{"key":31,"text":309,"correct":22},"18",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":28,"analysis":33},389754,"某楼层共有60个信息点，其中信息点的最远距离为65米，最近距离为35米，则该布线工程大约需要（ ）米的线缆（布线时线缆的计划长度为实际使用量的1.1倍）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"4290",{"key":24,"text":317,"correct":22},"2310",{"key":28,"text":319,"correct":26},"3 3 0 0",{"key":31,"text":321,"correct":22},"6 6 0 0",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},389755,"某企业计划研发甲、乙、丙、丁四种产品。每种产品必须依次由设计部门、制造部门和检验部门进行设计、制造和检验，而每个部门必须按同样的顺序处理这几种产品。各种产品各项工作所需的时间如下表。 只要适当安排好产品研究顺序，企业最快可以在 （ ） 天全部完成这四种产品的研发。",[326,328,330,332],{"key":20,"text":327,"correct":26},"84",{"key":24,"text":329,"correct":22},"86",{"key":28,"text":331,"correct":22},"91",{"key":31,"text":333,"correct":22},"93",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},389756,"The life cycle of aproject is a description of the various phases of the project from thebeginning to the end. One of the followings is not a phase of the traditionalproject life cycle, It is（ ）.",[338,340,342,344],{"key":20,"text":339,"correct":22},"development",{"key":24,"text":341,"correct":26},"concept",{"key":28,"text":343,"correct":22},"system analysis",{"key":31,"text":345,"correct":22},"implementation",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},389757,"Estimating schedule activity costs involves developing an approximation of the costs of theresources needed to complete each schedule activity. Cost estimating includes identifying andconsidering various costing alternatives. For example, in most application areas, additional workduring a design phase is widely held to have the potential for reducing the cost of the executionphase and product operations. The cost estimating process considers whether the expectedsavings can offset the cost of the",[350,352,354,356],{"key":20,"text":351,"correct":26},"project scope statement",{"key":24,"text":353,"correct":22},"statement of work",{"key":28,"text":355,"correct":22},"project management plan",{"key":31,"text":357,"correct":22},"project policy",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":28,"analysis":33},389758,"（）represents the information assets characterized by such a High volume, Velocity and Variety to require specific Technology and Analytical Methods for its transformation into Value.",[362,364,366,368],{"key":20,"text":363,"correct":22},"Internet plus",{"key":24,"text":365,"correct":22},"Industry 4.0",{"key":28,"text":367,"correct":26},"Big data",{"key":31,"text":369,"correct":22},"Cloud computing",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},389759,"（） is the process of obtaining the stakeholders\\' formal acceptance of thecompleted project scope. Verifying the scope includes reviewing deliverables and work results toensure that all were completed satisfactorily.",[374,376,378,380],{"key":20,"text":375,"correct":22},"Project acceptance",{"key":24,"text":377,"correct":26},"Scope verification",{"key":28,"text":379,"correct":22},"Scope definition",{"key":31,"text":381,"correct":22},"WBS Creation",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":28,"analysis":33},389760,"（ ）is one of the tools and techniques. A.Decomposition",[386,388,390,392],{"key":20,"text":387,"correct":22},"Fish bone Diagram",{"key":24,"text":389,"correct":22},"Precedence Diagramming Metho",{"key":28,"text":391,"correct":26},"of Sequence Activities",{"key":31,"text":393,"correct":22},"Expert Judgment",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":24,"analysis":33},389761,"Software configuration management（SCM）is the task of tracking and controlling changes in the software. Configuration management practices include configuration identification，change control, （ ） and configuration audit.",[398,400,402,404],{"key":20,"text":399,"correct":22},"milestones marking",{"key":24,"text":401,"correct":26},"status reporting",{"key":28,"text":403,"correct":22},"stakeholder management",{"key":31,"text":405,"correct":22},"quality audit",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":20,"analysis":33},389762,"Quality management has four main components：quality planning .，quality assurance.，quality control and quality（）.",[410,412,414,416],{"key":20,"text":411,"correct":26},"improvement",{"key":24,"text":413,"correct":22},"change",{"key":28,"text":415,"correct":22},"spiral",{"key":31,"text":417,"correct":22},"evolution",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":31,"analysis":33},389763,"PDM is a method of constructing a project schedule network diagram that uses boxesor rectangles, referred to as nodes, to represent activities and connects them with arrows thatshow the dependencies.This method includes following types of dependencies or precedence relationships:F-S, the initiation of the successor activity, depends upon the completion of thepredecessor activity.（） , the initiation of the successor activity, depends upon the initiation of thepredecessor activity.",[422,424,426,428],{"key":20,"text":423,"correct":22},"F-S",{"key":24,"text":425,"correct":22},"F-F",{"key":28,"text":427,"correct":22},"S-F",{"key":31,"text":429,"correct":26},"S-S",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":24,"analysis":33},389764,"（71）is the science of hiding information。Whereas the goal of cryptography is to make data unreadable by a third party。the goal of steganography is to hide the data from a third party。In this article,I will discuss what steganography is,what purposes it serves,and will provide an example using available software。 There are a large number of steganographic（2）that most of us are familiar with(especially if you watch a lot of spy movies),ranging from invisible ink and microdots to secreting a hidden message in the second letter of each word of a large body of text and spread spectrum radio communication。With computers and networks,there are many other ways of hiding informations,such as: Covert channels(c,g,Loki and some distributed denial-of-service tools use the Internet Control（3）Protocol,or ICMP,as the communication channel between the“bad guy”and a compromicyed system) Hidden text within Web pages Hiding files in“plain sight”(c,g，what better place to“hide”a file than with an important sounding name in the c:\\winnt system32 directory) Null ciphers(c,g,using the first letter of each word to form a hidden message in an otherwise innocuous text) steganography today,however,is significantly more（4）than the example about suggest,allowing a user to hide large amounts of information within image and audio。These forms of steganography often are used in conjunction with cryptography so the information is double protected;first it is encrypted and then hidden so that an advertisement first。find the information(an often difficult task in and of itself)and the decrypted it。 The simplest approach to hiding data within an image file is called（5）signature insertion。In this method ,we can take the binary representation of the hidden data and the bit of each byte within the covert image。If we are using 24-bit color the amount and will be minimum and indiscriminate to the human eye。 （74）处的单词应是",[434,436,438,440],{"key":20,"text":435,"correct":22},"powerful",{"key":24,"text":437,"correct":26},"sophistication",{"key":28,"text":439,"correct":22},"advanced",{"key":31,"text":441,"correct":22},"easy",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":31,"analysis":33},389765,"Requirements management is a （ ） process throughout a project．A requirement is a capability to which a project outcome（product or service）should conform.",[446,448,450,452],{"key":20,"text":447,"correct":22},"persistent",{"key":24,"text":449,"correct":22},"continuing",{"key":28,"text":451,"correct":22},"permanent",{"key":31,"text":453,"correct":26},"continuous",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":31,"analysis":33},389766,"Requirements management is the process of （73） ，analyzing，tracing，prioritizing and agreeing on requirements and then controlling changes and communicating to relevant stakeholders．",[458,460,462,464],{"key":20,"text":459,"correct":22},"communicating",{"key":24,"text":461,"correct":22},"collecting",{"key":28,"text":463,"correct":22},"filing",{"key":31,"text":465,"correct":26},"documenting",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":24,"analysis":33},389767,"The uncertainty of an event is measured by its probability of occurrence and is inversely proportional to that. The more uncertain an event is. The more information is required to resolve uncertainty of that event. The amount of information is measured in （ ） .",[470,472,474,476],{"key":20,"text":471,"correct":22},"possibility",{"key":24,"text":473,"correct":26},"bits",{"key":28,"text":475,"correct":22},"bps",{"key":31,"text":477,"correct":22},"probability",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":24,"analysis":33},389768,"During this phase，the analyst must become fully aware of the （ ）。 A.main symptom",[482,484,486,488],{"key":20,"text":483,"correct":22},"root problem",{"key":24,"text":485,"correct":26},"final blueprint",{"key":28,"text":487,"correct":22},"dat",{"key":31,"text":489,"correct":22},"specification",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":28,"analysis":33},389769,"all the following tools and techniques are helpful to accurately confirming customers needs,except （ ）",[494,496,498,500],{"key":20,"text":495,"correct":22},"questionnaires",{"key":24,"text":497,"correct":22},"prototyping approaches",{"key":28,"text":499,"correct":26},"fishbone diagrams",{"key":31,"text":501,"correct":22},"interviews",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":33,"analysis":33},389770,"（ ）is one of the tools and techniques of Sequence Activities. A.Decomposition",[506,507,508],{"key":20,"text":387,"correct":22},{"key":24,"text":389,"correct":22},{"key":28,"text":393,"correct":22},{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":28,"analysis":33},389771,"A data warehouse is a subject-oriented data set used for reporting and analusis. Data warehouses can be subdivided into （ ） . Which store subsets of data from a warehouse. A.OLTPs",[513,515,516,518],{"key":20,"text":514,"correct":22},"transactions",{"key":24,"text":487,"correct":22},{"key":28,"text":517,"correct":26},"sarts",{"key":31,"text":519,"correct":22},"OLAPs",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":24,"analysis":33},389772,"Your company CEO just sent you an E-mail asking you to make a …on your project，which has been in progress for 10 months，to allIdentified internal and external stakeholders. He scheduled the presentation for next Monday.You expect more than 50 people to atten D．The first step in preparing the presentation is to （ ） . A.define the audience",[524,526,528,530],{"key":20,"text":525,"correct":22},"determine the objective",{"key":24,"text":527,"correct":26},"decide on the general form of the presentation",{"key":28,"text":529,"correct":22},"plan",{"key":31,"text":531,"correct":22},"presentation strategy",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":28,"analysis":33},389773,"Documentation of a software package is normally produced for two purposes. One is to explain the （ ） of the software and describe how to use them.",[536,538,540,542],{"key":20,"text":537,"correct":22},"plans",{"key":24,"text":539,"correct":22},"cost",{"key":28,"text":541,"correct":26},"features",{"key":31,"text":543,"correct":22},"schedules",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":33,"analysis":33},389774,"The strategies for handling risk comprise of two main types: negative risks，and positive risks. The goal of the plan is to minimize threats and maximize opportunities. When dealing with negative risks, there are three main response strategies – （ ） , Transfer, Mitigate. A.Challenge",[548,550,552],{"key":20,"text":549,"correct":22},"Exploit",{"key":24,"text":551,"correct":22},"Avoi",{"key":28,"text":553,"correct":22},"Enhance",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":20,"analysis":33},389775,"（ ）seeks to buildconfidence that a future output or an unfinished output, will be completed in amanner that meets the specified requirements and expectations.",[558,560,562,564],{"key":20,"text":559,"correct":26},"Quality assurance",{"key":24,"text":561,"correct":22},"Quality plan",{"key":28,"text":563,"correct":22},"Quality control",{"key":31,"text":565,"correct":22},"Quality metrics",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":24,"analysis":33},389776,"（ ） Assesses the priority of identified risks using their probability of occurring，the corresponding impact on project objectives if the risks do occur，as well as other factors such as the time frame and risk tolerance of the project constraints of cost，schedule，scope，and quality.",[570,572,574,576],{"key":20,"text":571,"correct":22},"Quantitative Risk Analysis",{"key":24,"text":573,"correct":26},"Qualitative Risk Analysis",{"key":28,"text":575,"correct":22},"Enterprise Environmental Factors",{"key":31,"text":577,"correct":22},"Risk Management Plan",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":20,"analysis":33},389777,"（ ） is a collection of data sets，which is so large and complex that is becomes difficult to process using on-hand database management tools or traditional data processing applications. A.Big data",[582,584,586,588],{"key":20,"text":583,"correct":26},"Cluster",{"key":24,"text":585,"correct":22},"Parallel computing",{"key":28,"text":587,"correct":22},"Dat",{"key":31,"text":589,"correct":22},"warehouse",[591,595,598,601,604,607],{"id":592,"name":593,"category":7,"favorite":594},136,"法律职业试卷二(客观题 )",2,{"id":596,"name":597,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":599,"name":600,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":602,"name":603,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":605,"name":606,"category":7,"favorite":8},28,"安全工程师",{"id":608,"name":609,"category":7,"favorite":8},112,"安全生产法律知识"]