[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":615},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,3,50,1856,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,333,343,352,364,376,388,400,412,424,436,447,459,471,483,495,507,519,531,543,555,567,579,591,603],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},388306,1,"单选题","项目章程在项目管理中起着非常重要的作用，以下对项目章程的描述中（ ）是错误的。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","项目章程应该由项目团队之外的人发布",false,{"key":24,"text":25,"correct":22},"B","项目章程使项目与执行组织的日常运营联系起来",{"key":27,"text":28,"correct":29},"C","项目章程不包括干系人的需求和期望",true,{"key":31,"text":32,"correct":22},"D","项目章程包括论证项目的业务方案","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},388307,"项目工作说明书是对项目所需要提供的产品、成果或服务的描述。其内容一般不包括（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"业务要求",{"key":24,"text":41,"correct":22},"产品范围描述",{"key":27,"text":43,"correct":22},"项目目标",{"key":31,"text":45,"correct":29},"技术可行性分析",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},388308,"引导技术是指团队领导者诱发团队成员积极参与活动的方法，来帮助团队和个人完成相关项目活动，（ ）一般不作为引导技术在项目中应用",[50,52,54,56],{"key":20,"text":51,"correct":29},"专家判断",{"key":24,"text":53,"correct":22},"头脑风暴",{"key":27,"text":55,"correct":22},"冲突处理",{"key":31,"text":57,"correct":22},"会议管理",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},388309,"关于项目目标的描述，不正确的是：（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"项目可以有一个目标，也可以有多个目标",{"key":24,"text":65,"correct":29},"项目目标可以量化，也可以不量化",{"key":27,"text":67,"correct":22},"项目的成果目标与约束目标可能会冲突",{"key":31,"text":69,"correct":22},"项目目标应该是具体的、可实现的",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},388310,"某拟建项目财务净现金流量如下表所示，该项目的静态投资回收期是（ ）",[74,76,78,80],{"key":20,"text":75,"correct":22},"5.4",{"key":24,"text":77,"correct":22},"5.6",{"key":27,"text":79,"correct":29},"7.4",{"key":31,"text":81,"correct":22},"7.6",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},388311,"（）includes the processes required to ensure that the project includes all the work required,and only the work required，to compete the project successfully.Managing the project scope is primarily concerned with defining and controlling what is not included in the project.",[86,88,90,92],{"key":20,"text":87,"correct":22},"Create scopE",{"key":24,"text":89,"correct":22},"Project stakeholder management",{"key":27,"text":91,"correct":29},"Project scope management",{"key":31,"text":93,"correct":22},"Project cost management",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},388312,"关于WBS的描述，不正确的是：（ ）",[98,100,102,104],{"key":20,"text":99,"correct":22},"WBS必须且只能包括100%的工作",{"key":24,"text":101,"correct":29},"WBS的元素必须指定一个或多个负责人",{"key":27,"text":103,"correct":22},"WBS应该由全体项目成员、用户和项目干系人一致确认",{"key":31,"text":105,"correct":22},"分包出去的工作也应纳入WBS中",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},388313,"一般而言，项目的范围确定后，项目的三个基本目标是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":29},"时间、成本、质量标准",{"key":24,"text":113,"correct":22},"时间、功能、成本",{"key":27,"text":115,"correct":22},"成本、功能、质量标准",{"key":31,"text":117,"correct":22},"时间、功能、质量标准",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},388314,"不能作为检验WBS是否定义完全，项目的所有任务是否都被完全分解的依据是（ ）",[122,124,126,128],{"key":20,"text":123,"correct":22},"是否明确定义了每个任务的开始和结束",{"key":24,"text":125,"correct":22},"是否每个任务都有一个可交付的成果",{"key":27,"text":127,"correct":22},"是否容易估算成本",{"key":31,"text":129,"correct":29},"是否明确了变更申请",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},388315,"（ ）描述了项目范围的形成过程。",[134,136,138,140],{"key":20,"text":135,"correct":29},"它在项目的早期被描述出来并随着项目的进展而更加详细",{"key":24,"text":137,"correct":22},"它是在项目章程中被定义并且随着项目的进展进行必要的变更",{"key":27,"text":139,"correct":22},"在项目早期，项目范围包含某些特定的功能和其他功能，并且随着项目的进展添加更详细的特征",{"key":31,"text":141,"correct":22},"它是在项目的早期被描述出来并随着范围的蔓延而更加详细",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},388316,"以下关于项目范围和产品范围的叙述中，不正确的是：（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"项目范围是为了获得具有规定特性和功能的产品、服务和结果，而必须完成的项目工作",{"key":24,"text":149,"correct":22},"产品范围是表示产品、服务和结果的特性和功能",{"key":27,"text":151,"correct":29},"项目范围是否完成以产品要求作为衡量标准",{"key":31,"text":153,"correct":22},"项目的目标是项目范围管理计划编制的一个基本依据",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},388317,"范围控制的目的是监控项目的状态，如“项目的工作范围状态和产品范围状态”，范围控制不涉及（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"影响导致范围变更的因素",{"key":24,"text":161,"correct":22},"确保所有被请求的变更按照项目整体变更控制过程处理",{"key":27,"text":163,"correct":22},"范围变更发生时管理实际的变更",{"key":31,"text":165,"correct":29},"确定范围变更是否已经发生",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},388318,"以下关于创建工作分解结构（WBS）的叙述中，（ ）是不准确的。",[170,172,174,176],{"key":20,"text":171,"correct":22},"当前较常用的工作分解结构表示形式主要有分级的树型结构和列表",{"key":24,"text":173,"correct":29},"WBS最低层次的工作单元是工作包，业内一般把1个人1周能干完的工作称为一个工作包",{"key":27,"text":175,"correct":22},"创建WBS的输入包括详细的项目范围说明书、项目管理计划、组织过程资产",{"key":31,"text":177,"correct":22},"创建WBS的输出包括WBS和WBS字典、范围基准、更新的项目管理计划",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},388319,"大型项目可能包括一些超出单个项目范围的工作。项目范围是否完成以在（ ）中规定的任务是否完成作为衡量标志。①项目管理计划②项目范围说明书③WBS④产品验收标准⑤更新的项目文档⑥WBS字典",[182,184,186,188],{"key":20,"text":183,"correct":22},"①②③④",{"key":24,"text":185,"correct":29},"①②③⑥",{"key":27,"text":187,"correct":22},"①③④⑤",{"key":31,"text":189,"correct":22},"②④⑤⑥",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},388320,"某项目工期为一年，项目经理对负责项目工作分解结构编制的小张提出了如下要求或建议，其中（ ）是不妥当的。",[194,196,198,200],{"key":20,"text":195,"correct":29},"应该在2周内把全年工作都分解到具体工作包",{"key":24,"text":197,"correct":22},"可根据项目生命周期的阶段进行第一层分解，而把可交付物安排在第二层",{"key":27,"text":199,"correct":22},"可考虑以一个人80小时能完成的工作作为一个工作包",{"key":31,"text":201,"correct":22},"可采用树形结构和列表形式相结合的方式进行分解",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},388321,"通常把被批准的详细的项目范围说明书和与之相关的（ ）作为项目的范围基准，并在整个项目的生命期内对之进行监控、核实和确认。",[206,208,210,212],{"key":20,"text":207,"correct":22},"产品需求",{"key":24,"text":209,"correct":22},"项目管理计划",{"key":27,"text":211,"correct":29},"WBS以及WBS字典",{"key":31,"text":213,"correct":22},"合同",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},388322,"（ ）属于控制范围的活动。",[218,220,222,224],{"key":20,"text":219,"correct":22},"与客户仔细讨论项目范围说明书，并请客户签字",{"key":24,"text":221,"correct":29},"当客户提出新的需求时，说服用户放弃新的需求",{"key":27,"text":223,"correct":22},"确认项目范围是否覆盖了需要完成的产品或服务进行的所有活动",{"key":31,"text":225,"correct":22},"确认每项工作是否有明确的质量最标准",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},388323,"以下关于工程项目范围确认与质量控制的表述中，正确的是（ ）",[230,232,234,236],{"key":20,"text":231,"correct":29},"范围确认是有关工作结果的可接受问题，质量控制是有关工作结果是否满足质量需求的问题",{"key":24,"text":233,"correct":22},"范围确认与质量控制相同",{"key":27,"text":235,"correct":22},"质量控制通常是在范围确认之前进行，这2个过程是串行执行的",{"key":31,"text":237,"correct":22},"范围确认的输入包含项目分解结构字典，质量控制输入不包含项目分解结构字典",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},388324,"项目范围管理过程包括：范围计划、（ ）、范围定义、创建WBS、范围确认、范围控制6个主要过程。",[242,244,246,248],{"key":20,"text":243,"correct":29},"收集需求",{"key":24,"text":245,"correct":22},"范围定义",{"key":27,"text":247,"correct":22},"范围变更",{"key":31,"text":249,"correct":22},"编制范围说明书",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":27,"analysis":33},388325,"详细的项目范围说明书是指导项目成功实施的关键文件。（ ）不应该属于范围定义的输入。",[254,256,258,260],{"key":20,"text":255,"correct":22},"项目章程",{"key":24,"text":257,"correct":22},"项目范围管理计划",{"key":27,"text":259,"correct":29},"批准的变更申请",{"key":31,"text":261,"correct":22},"项目合同文本",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":27,"analysis":33},388326,"某项目包含 A、 B、 C、 D、 E、 F、G七个活动，各活动的历时估算和活动间的逻辑关系如下表所示，活动C的总浮动时间是1天，该项目工期是（ ）天",[266,268,270,272],{"key":20,"text":267,"correct":22},"13",{"key":24,"text":269,"correct":22},"14",{"key":27,"text":271,"correct":29},"15",{"key":31,"text":273,"correct":22},"16",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},388327,"在进行项目活动历时估算时，如果很难获得项目工作的详细信息，可采用（ ）作为项目活动历时估算的工具。",[278,280,282,284],{"key":20,"text":279,"correct":22},"参数式估算法",{"key":24,"text":281,"correct":29},"类比估算法",{"key":27,"text":283,"correct":22},"预留时间估算法",{"key":31,"text":285,"correct":22},"历时的三点估算法",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":27,"analysis":33},388328,"活动排序的工具和技术有多种，工具和技术的选取由若干因素决定。如果项目经理决定在进度计划编制中使用标准化的项目进度网络图，这可能因为（ ）",[290,292,294,296],{"key":20,"text":291,"correct":22},"该项目非常独特，在不同的阶段需要专门的网络图",{"key":24,"text":293,"correct":22},"在现有网络上具有可以获取的资源管理软件",{"key":27,"text":295,"correct":29},"在项目中包含几个相同或几乎相同的可交付成果",{"key":31,"text":297,"correct":22},"项目中存在多条关键路径",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},388329,"项目进度制定是一个迭代的过程。如果起始和结束的日期不合实际，则项目可能无法按计划完成。因此你认识到进度控制的重要性，你与你的团队一起来定义怎样管理进度变更。你用以下哪种方法记录你的决定（ ）",[302,304,306,308],{"key":20,"text":303,"correct":22},"进度变更控制过程",{"key":24,"text":305,"correct":29},"进度管理计划",{"key":27,"text":307,"correct":22},"进度风险计划",{"key":31,"text":309,"correct":22},"服务水平协议",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":20,"analysis":33},388330,"在进度控制中使用假设情景分析的目的是（ ）",[314,316,318,320],{"key":20,"text":315,"correct":29},"评审各种情景，使进度与计划保持一致",{"key":24,"text":317,"correct":22},"记录请求的变更",{"key":27,"text":319,"correct":22},"针对何时应更新进度基准，提供额外详情",{"key":31,"text":321,"correct":22},"更新活动属性",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},388331,"某项工程的活动明细如下表（时间：周；费用：万元）: 项目总预算由原先的60万元增加到63万元，根据上表，在预算约束下该工程最快能完成时间为（ ）周",[326,328,330,331],{"key":20,"text":327,"correct":29},"9",{"key":24,"text":329,"correct":22},"8",{"key":27,"text":269,"correct":22},{"key":31,"text":332,"correct":22},"12",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":24,"analysis":33},388332,"某项目由并行的3个活动甲、乙和丙组成，为活动甲分配3人5天可以完成活动乙分配6人7天可以完成，活动丙分配4人2天可以完成，活动完成后人员可再调配。在此情况下，项目最短工期为（ ）天，此时人员最少配置为10人。",[337,339,341,342],{"key":20,"text":338,"correct":22},"6",{"key":24,"text":340,"correct":29},"7",{"key":27,"text":329,"correct":22},{"key":31,"text":327,"correct":22},{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":27,"analysis":33},388333,"某项目由并行的3个活动甲、乙和丙组成，为活动甲分配3人5天可以完成活动乙分配6人7天可以完成，活动丙分配4人2天可以完成，活动完成后人员可再调配。在此情况下，项目最短工期为7天，此时人员最少配置为（ ）人。",[347,348,349,351],{"key":20,"text":338,"correct":22},{"key":24,"text":327,"correct":22},{"key":27,"text":350,"correct":29},"10",{"key":31,"text":267,"correct":22},{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":24,"analysis":33},388334,"前导图和箭线图都是网络图。它们之间的主要差别是：（ ）",[356,358,360,362],{"key":20,"text":357,"correct":22},"箭线图在活动期间与PERT图合并",{"key":24,"text":359,"correct":29},"前导图将活动作为节点",{"key":27,"text":361,"correct":22},"箭线图不能指明关键路径",{"key":31,"text":363,"correct":22},"前导图将浮动时间作为活动历时的一部分",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":20,"analysis":33},388335,"你计划在户外进行项目管理培训课程中有关团队建设的部分。参加者将从事一个游戏以淘汰“最弱的”队员。赢的人将得到公司的达尔文奖。你只能在一年的某些时段安排此活动，因为该活动将在格林兰进行。开始这项活动的最佳时间是7月中旬。当你发展项目计划时，更通用的日期约束之一是（ ）",[368,370,372,374],{"key":20,"text":369,"correct":29},"最早开始日期",{"key":24,"text":371,"correct":22},"固定的最晚开始",{"key":27,"text":373,"correct":22},"最晚结束日期",{"key":31,"text":375,"correct":22},"固定的最早结束",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":27,"analysis":33},388336,"进度变更的控制活动包括：（ ）",[380,382,384,386],{"key":20,"text":381,"correct":22},"判断项目进度的当前状态，对造成进度变更的因素施加影响，查明进度是否已经改变，在实际变更出现时对其进行调整。",{"key":24,"text":383,"correct":22},"判断项目进度的当前状态，对造成成本变更的因素施加影响，查明进度是否已经改变，在实际变更出现时对其进行管理。",{"key":27,"text":385,"correct":29},"判断项目进度的当前状态，对造成进度变更的因素施加影响，查明进度是否已经改变，在实际变更出现时对其进行管理。",{"key":31,"text":387,"correct":22},"判断项目进度的当前状态，对造成进度变更的因素施加影响，查明进度改变的原因，在实际变更出现时对其进行调整。",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":31,"analysis":33},388337,"一个新测试中心将在两年内建成。项目发起人和项目经理已经确定并且高层次估算已经开始。预计该项目可以在预算内按进度计划完成。唯一的难点是获得完成工作所需的具有正确专门技能的人力资源。在这种情况下，项目经理应建立（ ）。",[392,394,396,398],{"key":20,"text":393,"correct":22},"风险分析",{"key":24,"text":395,"correct":22},"责任分配矩阵",{"key":27,"text":397,"correct":22},"责任图",{"key":31,"text":399,"correct":29},"受资源限制的进度计划",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":27,"analysis":33},388338,"在下面的项目网络图中（时间单位为天），活动B的自由时差和总时差分别为0、1，如果活动A的实际开始时间是5月1日早8时，在不延误项目工期的情况下，活动B最晚应在（ ）前结束。",[404,406,408,410],{"key":20,"text":405,"correct":22},"5月5日早8时",{"key":24,"text":407,"correct":22},"5月6日早8时",{"key":27,"text":409,"correct":29},"5月7日早8时",{"key":31,"text":411,"correct":22},"5月8日早8时",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":24,"analysis":33},388339,"某项目经理在对项目历时进行估算时，认为正常情况下完成项目需要42天，同时也分析了影响项目工期的因素，认为最快可以在35天内完成工作，而在最不利的条件下则需要55天完成任务。采用三点估算得到的工期是（ ）天。",[416,418,420,422],{"key":20,"text":417,"correct":22},"42",{"key":24,"text":419,"correct":29},"43",{"key":27,"text":421,"correct":22},"44",{"key":31,"text":423,"correct":22},"55",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":31,"analysis":33},388340,"某项目经理正在进行活动资源估算，他可以采用的方法或技术中不包括（ ）",[428,430,432,434],{"key":20,"text":429,"correct":22},"己有案例的估算数据",{"key":24,"text":431,"correct":22},"项目管理软件",{"key":27,"text":433,"correct":22},"多方案分析",{"key":31,"text":435,"correct":29},"储备分析",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":24,"analysis":33},388341,"项目经理对某软件开发流程中的“概要设计”活动进行历时估算时，参考了以往相关项目活动情况，他采用的是（ ）方法",[440,441,443,445],{"key":20,"text":51,"correct":22},{"key":24,"text":442,"correct":29},"类比估算",{"key":27,"text":444,"correct":22},"参数估算",{"key":31,"text":446,"correct":22},"三点估算",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":24,"analysis":33},388342,"以下关于关键路径法的叙述，（ ）是不正确的。",[451,453,455,457],{"key":20,"text":452,"correct":22},"如果关键路径中的一个活动延迟，将会影响整个项目计划",{"key":24,"text":454,"correct":29},"关键路径包括所有项目进度控制点",{"key":27,"text":456,"correct":22},"如果有两个或两个以上的路径长度一样，就有可能存在多个关键路径",{"key":31,"text":458,"correct":22},"关键路径可随项目的进展而改变",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":31,"analysis":33},388343,"项目经理对某软件需求分析活动历时估算的结果是：该活动用时2周（假定每周工作时间是5天）。随后对其进行储备分析，确定的增加时间是2天。以下针对该项目储备分析结果的叙述中，（ ）是不正确的。",[463,465,467,469],{"key":20,"text":464,"correct":22},"增加软件需求分析的应急时间是2天",{"key":24,"text":466,"correct":22},"增加软件需求分析的缓冲时间是该活动历时的20%",{"key":27,"text":468,"correct":22},"增加软件需求分析的时间储备是20%",{"key":31,"text":470,"correct":29},"增加软件需求分析的历时标准差是2天",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":31,"analysis":33},388344,"资源分析人员在对某项目进行活动资源估算分析时，发现的主要问题是：该项目依赖张工的经验和个人能力，但同时张工还在其它项目中担任重要角色。为了保证项目资源的使用不发生冲突，资源分析人员在进行资源估算时应提交（ ）。",[475,477,479,481],{"key":20,"text":476,"correct":22},"专家评审意见",{"key":24,"text":478,"correct":22},"活动属性",{"key":27,"text":480,"correct":22},"资源类比估算清单",{"key":31,"text":482,"correct":29},"活动资源日历",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":27,"analysis":33},388345,"活动资源估算的输出不包括（ ）。",[487,489,491,493],{"key":20,"text":488,"correct":22},"资源分解结构",{"key":24,"text":490,"correct":22},"请求的变更",{"key":27,"text":492,"correct":29},"项目进度网络图",{"key":31,"text":494,"correct":22},"资源日历",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":27,"analysis":33},388346,"在制订进度计划时，已经完成了:①绘制进度网络图;②活动资源估算;③活动历时估算。此时，为了确定各项活动的时差可进行（ ）.",[499,501,503,505],{"key":20,"text":500,"correct":22},"资源平衡分析",{"key":24,"text":502,"correct":22},"进度压缩分析",{"key":27,"text":504,"correct":29},"关键路线分析",{"key":31,"text":506,"correct":22},"假设情景分析",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":20,"analysis":33},388347,"项目进度表至少包括每项计划活动的计划开始日期与计划完成日期，常见的做法是用一种或多种格式的图形表示。在下面的图表中，常用于表示项目进度表的是（ ）",[511,513,515,517],{"key":20,"text":512,"correct":29},"横道图",{"key":24,"text":514,"correct":22},"排列图",{"key":27,"text":516,"correct":22},"鱼骨图",{"key":31,"text":518,"correct":22},"趋势图",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":20,"analysis":33},388348,"某信息系统集成项目计划6周完成，项目经理就前4周的项目进展情况进行分析和汇报情况如下，项目的成本执行指数CPI为（ ）。",[523,525,527,529],{"key":20,"text":524,"correct":29},"0.83",{"key":24,"text":526,"correct":22},"0.87",{"key":27,"text":528,"correct":22},"0.88",{"key":31,"text":530,"correct":22},"0.95",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":24,"analysis":33},388349,"（ ）不属于制定预算过程的输出。",[535,537,539,541],{"key":20,"text":536,"correct":22},"成本基准",{"key":24,"text":538,"correct":29},"范围基准",{"key":27,"text":540,"correct":22},"项目资金需求",{"key":31,"text":542,"correct":22},"更新的活动成本估算",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":31,"analysis":33},388350,"如果挣值EV是300万元，实际成本AC是350万元，计划值PV是375万元。进度执行指数显示（ ）。",[547,549,551,553],{"key":20,"text":548,"correct":22},"仅以原始计划速率的86%进行项目",{"key":24,"text":550,"correct":22},"正在以原始计划速率的93%进行项目",{"key":27,"text":552,"correct":22},"正在以原始计划速率的107%进行项目",{"key":31,"text":554,"correct":29},"仅以原始计划速率的80%进行项目",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":27,"analysis":33},388351,"自下而上估算方法是指估算单个工作包或细节最详细的活动的成本，然后将这些详细的成本汇总到更高层级估算的方法，下面关于该方法的描述中（ ）是错误的。",[559,561,563,565],{"key":20,"text":560,"correct":22},"其精确性取决于估算对象的规模和复杂程度",{"key":24,"text":562,"correct":22},"便于报告和跟踪",{"key":27,"text":564,"correct":29},"适于对项目情况了解较少时采用",{"key":31,"text":566,"correct":22},"该估算方法的准确性通常高于其他估算方法",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":27,"analysis":33},388352,"你作为项目经理正致力于通过自动售货机和快餐业来向大众推销山羊奶。你的首要任务是准备一个项目成本估计。你准备使用类比估计。下面（ ）不是类比估计的特征",[571,573,575,577],{"key":20,"text":572,"correct":22},"提供严密的估计",{"key":24,"text":574,"correct":22},"是专家判断的一种形式",{"key":27,"text":576,"correct":29},"在实际成本+-10%以内的准确率",{"key":31,"text":578,"correct":22},"利用以前的类似项目的成本作为当前项目成本估计的基础",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":20,"analysis":33},388353,"某大型项目进行到两年时，使用挣值法所需的三个中间变量的数值分别是：计划值PV为400万元，实际成本AC为200万元，挣值EV为100万元。基于该项目的成本偏差，下列描述中正确的是（ ）；基于该项目的成本绩效指数，下列描述中正确的是成本绩效指数小于1，且实际发生的成本是预算成本的2倍。",[583,585,587,589],{"key":20,"text":584,"correct":29},"项目成本偏差为负，且项目处于超支状态",{"key":24,"text":586,"correct":22},"项目成本偏差为正，且项目处于超支状态",{"key":27,"text":588,"correct":22},"项目成本偏差为负，且项目处于成本节约状态",{"key":31,"text":590,"correct":22},"项目成本偏差为正，且项目处于成本节约状态",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":20,"analysis":33},388354,"项目管理计划应整合其他规划过程的所有子计划和基准，一经确定即成为项目的基准。在项目管理中通常将（ ）合并为一个绩效测量基准，这些基准可应用于挣值测量从而判断项目的整体绩效。",[595,597,599,601],{"key":20,"text":596,"correct":29},"范围基准、成本基准、进度基准",{"key":24,"text":598,"correct":22},"质量基准、成本基准、范围基准",{"key":27,"text":600,"correct":22},"质量基准、进度基准、范围基准",{"key":31,"text":602,"correct":22},"质量基准、进度基准、成本基准",{"id":604,"libraryId":5,"type":15,"typeLabel":16,"stem":605,"options":606,"answer":24,"analysis":33},388355,"未分配的预算属于下列（ ）内容",[607,609,611,613],{"key":20,"text":608,"correct":22},"管理储备金",{"key":24,"text":610,"correct":29},"业绩衡量基准线",{"key":27,"text":612,"correct":22},"客户和发起人管理总帐目表",{"key":31,"text":614,"correct":22},"一般管理和行政费用",[616,620,623,626,629,632],{"id":617,"name":618,"category":7,"favorite":619},136,"法律职业试卷二(客观题 )",2,{"id":621,"name":622,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":624,"name":625,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":627,"name":628,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":630,"name":631,"category":7,"favorite":8},28,"安全工程师",{"id":633,"name":634,"category":7,"favorite":8},112,"安全生产法律知识"]