[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-29":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":612},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,29,50,1856,[13,34,46,58,70,82,94,106,113,125,137,148,160,172,184,196,208,220,232,244,256,268,280,292,303,315,327,339,351,363,375,387,399,411,423,435,447,459,471,483,495,507,519,528,540,552,564,576,588,600],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},389628,1,"单选题","依据GB\u002FT 16680-2015《系统与软件工程 用户文档的管理者要求》，管理者应制定和维护用户文档编制计划。（ ）不属于用户文档编制计划内容。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","文档开发过程中实施的质量控制",true,{"key":24,"text":25,"correct":26},"B","用户文档的可用性要求",false,{"key":28,"text":29,"correct":26},"C","确定用户文档需要覆盖的软件产品",{"key":31,"text":32,"correct":26},"D","每个文档的媒体和输出格式的控制模板和标准设计","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},389629,"以ANSI冠名的标准属于 （ ）",[38,40,42,44],{"key":20,"text":39,"correct":22},"国家标准",{"key":24,"text":41,"correct":26},"国际标准",{"key":28,"text":43,"correct":26},"行业标准",{"key":31,"text":45,"correct":26},"项目规范",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},389630,"根据GB\u002FT 16260.1-2006《软件工程产品质量》，软件产品使用质量特性中的可靠性，是指与软件在规定的一段时间内和规定的条件下维持其性能水平的一组软件属性。（ ）不属于维护性质量特性。",[50,52,54,56],{"key":20,"text":51,"correct":26},"可测试性",{"key":24,"text":53,"correct":26},"可修改性",{"key":28,"text":55,"correct":26},"易分析性",{"key":31,"text":57,"correct":22},"易安装性",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},389631,"下列（ ）不是易用性的质量属性",[62,64,66,68],{"key":20,"text":63,"correct":22},"易恢复性",{"key":24,"text":65,"correct":26},"易学性",{"key":28,"text":67,"correct":26},"易理解性",{"key":31,"text":69,"correct":26},"易操作性",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},389632,"易用性有（ ）个质量特性",[74,76,78,80],{"key":20,"text":75,"correct":26},"5",{"key":24,"text":77,"correct":26},"4",{"key":28,"text":79,"correct":22},"3",{"key":31,"text":81,"correct":26},"2",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},389633,"根据《GB\u002FT11457—2006 信息技术软件工程术语》中对相关软件的分类，生产性企业中所使用的过程控制软件属于 （ ） 。",[86,88,90,92],{"key":20,"text":87,"correct":26},"支持软件",{"key":24,"text":89,"correct":26},"中间件",{"key":28,"text":91,"correct":22},"应用软件",{"key":31,"text":93,"correct":26},"系统软件",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},389634,"GB\u002FT12504—1990标准中对计算机软件质量保证计划进行了规范，要求 （ ） ：必须指明成功运行该软件所需要的数据、控制命令以及运行条件等信息；必须指明所有的出错信息，含义及其修理方法；还必须描述将用户发现的错误或问题通知项目承办单位或项目委托单位的方法。",[98,100,102,104],{"key":20,"text":99,"correct":26},"软件设计说明书",{"key":24,"text":101,"correct":26},"软件验证与确认计划",{"key":28,"text":103,"correct":22},"用户文档",{"key":31,"text":105,"correct":26},"软件需求说明书",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":108,"answer":28,"analysis":33},389635,[109,110,111,112],{"key":20,"text":99,"correct":26},{"key":24,"text":101,"correct":26},{"key":28,"text":103,"correct":22},{"key":31,"text":105,"correct":26},{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":31,"analysis":33},389636,"某软件系统投入运行10天，计划运行时间为每早8点至晚6点。第二天上午发生一次失效，故障恢复用了1小时。第4天上午发生一次失效，故障恢复用了4小时。第9天上午发生一次失效，故障恢复用了1小时。根据《软件工程产品质量GB\u002F16260—2006》，该软件系统的有效性（或可用性，availability）为 （ ） 。",[117,119,121,123],{"key":20,"text":118,"correct":26},"98%",{"key":24,"text":120,"correct":26},"95%",{"key":28,"text":122,"correct":26},"80%",{"key":31,"text":124,"correct":22},"94%",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":31,"analysis":33},389637,"根据《信息技术软件产品评价质量特性及其使用指南GB\u002FT 16260—2002》的定义，（ ） 不属于质量的功能性子特性。",[129,131,133,135],{"key":20,"text":130,"correct":26},"适合性",{"key":24,"text":132,"correct":26},"准确性",{"key":28,"text":134,"correct":26},"互用性",{"key":31,"text":136,"correct":22},"适应性",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":20,"analysis":33},389638,"根据GB\u002FT 11457-2006《软件工程术语》的定义，连接两个或多个其他部件，能为相互间传递信息的硬件或软件部件叫做 （ ） 。",[141,143,145,147],{"key":20,"text":142,"correct":22},"接口",{"key":24,"text":144,"correct":26},"链接",{"key":28,"text":146,"correct":26},"模块",{"key":31,"text":89,"correct":26},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":31,"analysis":33},389639,"在GB\u002FT14393计算机软件可靠性和可维护性管理标准中，（）不是详细设计评审的内容。",[152,154,156,158],{"key":20,"text":153,"correct":26},"各单元可靠性和可维护性目标",{"key":24,"text":155,"correct":26},"可靠性和可维护性设计",{"key":28,"text":157,"correct":26},"测试文件、软件开发工具",{"key":31,"text":159,"correct":22},"测试原理、要求、文件和工具",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":31,"analysis":33},389640,"由政府或国家级的机构制定或批准的标准称为国家标准，以下由______冠名的标准不属于国家标准",[164,166,168,170],{"key":20,"text":165,"correct":26},"GB",{"key":24,"text":167,"correct":26},"BS",{"key":28,"text":169,"correct":26},"ANSI",{"key":31,"text":171,"correct":22},"IEEE",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":31,"analysis":33},389641,"根据《软件工程产品质量第1部分，质量模型GB\u002FT16260—1—2006》，在规定条件下，相对于所用资源的数量，软件产品可提供适当性能的能力成为软件产品的 （ ） 。",[176,178,180,182],{"key":20,"text":177,"correct":26},"易用性",{"key":24,"text":179,"correct":26},"稳定性",{"key":28,"text":181,"correct":26},"可靠性",{"key":31,"text":183,"correct":22},"效率",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":20,"analysis":33},389642,"根据GB\u002FT12504-2008《计算机软件质量保证计划规范》中的规定，在软件验收时，验证代码与设计文档的一致性、接口规格说明的一致性、设计实现和功能需求的一致性等检査属于（ ）。",[188,190,192,194],{"key":20,"text":189,"correct":22},"综合检査",{"key":24,"text":191,"correct":26},"功能检査",{"key":28,"text":193,"correct":26},"性能检査",{"key":31,"text":195,"correct":26},"配置检査",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":20,"analysis":33},389643,"根据《计算机软件质量保证计划规范GB\u002FT12504—1990》中关于软件质量评审和检查的规定，在软件验收时，验证代码和设计文档的一致性、接口规格说明的一致性、设计实现和功能需求的一致性等检查属于 （ ） 。",[200,202,204,206],{"key":20,"text":201,"correct":22},"综合检查",{"key":24,"text":203,"correct":26},"功能检查",{"key":28,"text":205,"correct":26},"性能检查",{"key":31,"text":207,"correct":26},"配置检查",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":24,"analysis":33},389644,"根据《软件文档管理指南 GB\u002FT16680—1996》， （ ） 不属于基本的开发文档。",[212,214,216,218],{"key":20,"text":213,"correct":26},"可行性研究和项目任务书",{"key":24,"text":215,"correct":22},"培训手册",{"key":28,"text":217,"correct":26},"需求规格说明",{"key":31,"text":219,"correct":26},"开发计划",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":31,"analysis":33},389645,"依据GB\u002FT16260.2-2006《软件工程产品质量第2部分外部质量的度量》，评估软件的帮助系统和文档的有效性是对软件进行（ ） 。",[224,226,228,230],{"key":20,"text":225,"correct":26},"易理解性度量",{"key":24,"text":227,"correct":26},"易操作性度量",{"key":28,"text":229,"correct":26},"吸引性度量",{"key":31,"text":231,"correct":22},"易学性度量",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":31,"analysis":33},389646,"根据《软件文档管理指南》（GB\u002FT 16680—1996），以下关于文档评审的叙述，___是不正确的。",[236,238,240,242],{"key":20,"text":237,"correct":26},"需求评审进一步确认开发者和设计者已了解用户要求什么及用户从开发者一方了解某些限制和约束",{"key":24,"text":239,"correct":26},"在概要设计评审过程中主要详细评审每个系统组成部分的基本设计方法和测试计划，系统规格说明应根据概要设计评审的结果加以修改",{"key":28,"text":241,"correct":26},"设计评审产生的最终文档规定系统和程序将如何设计开发和测试以满足一致同意的需求规格说明书",{"key":31,"text":243,"correct":22},"详细设计评审主要评审计算机程序、程序单元测试计划和集成测试计划",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":20,"analysis":33},389647,"依照EIA\u002FTIA—568A标准的规定，完整的综合布线系统包括 （ ） 。①建筑群子系统 ②设备间子系统 ③垂直干线子系统 ④管理子系统 ⑤水平子系统 ⑥工作区子系统",[248,250,252,254],{"key":20,"text":249,"correct":22},"①②③④⑤⑥",{"key":24,"text":251,"correct":26},"①②③④⑥",{"key":28,"text":253,"correct":26},"①②④⑥",{"key":31,"text":255,"correct":26},"②③④⑤⑥",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":28,"analysis":33},389648,"某园区的综合布线系统中专门包含一个子系统用于将终端设备连接到信息插座，包括装配软线、连接器和连接所需的扩展软线。根据EIA\u002FTIA—568A综合布线国际标准，该子系统是综合布线系统中的 （ ）",[260,262,264,266],{"key":20,"text":261,"correct":26},"水平子系统",{"key":24,"text":263,"correct":26},"设备子系统",{"key":28,"text":265,"correct":22},"工作区子系统",{"key":31,"text":267,"correct":26},"管理子系统",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":31,"analysis":33},389649,"依据标准 GB\u002FT16260.1-2006《软件工程产品质量 第 1 部分 质量模型》定义的外部和内部质量的质量模型，可将软件质量划分为（ ）个特性。",[272,274,276,278],{"key":20,"text":273,"correct":26},"三",{"key":24,"text":275,"correct":26},"四",{"key":28,"text":277,"correct":26},"五",{"key":31,"text":279,"correct":22},"六",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":24,"analysis":33},389650,"根据GB\u002FT11457—2006的规定，使客户能确认是否接受系统的正式测试为 （ ） 。",[284,286,288,290],{"key":20,"text":285,"correct":26},"合格性测试",{"key":24,"text":287,"correct":22},"验收测试",{"key":28,"text":289,"correct":26},"运行测试",{"key":31,"text":291,"correct":26},"系统测试",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":20,"analysis":33},389651,"对软件设计中软件的总体结构、外部接口、主要部件功能分配、全局数据结构以及各主要部件之间的接口等方面合适性的评价，属于 （ ） 。",[296,298,300,302],{"key":20,"text":297,"correct":22},"概要设计评审",{"key":24,"text":299,"correct":26},"详细设计评审",{"key":28,"text":301,"correct":26},"软件需求评审",{"key":31,"text":203,"correct":26},{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":20,"analysis":33},389652,"某单位的公共服务大厅为客户提供信息检索服务并办理相关行政审批事项，其信息系统运行中断将造成重大经济损失并引起服务大厅严重的秩序混乱。根据《电子信息系统机房设计规范GB 50174—2008》，该单位的电子信息系统机房的设计应该按照 （ ） 机房进行设计和施工。",[307,309,311,313],{"key":20,"text":308,"correct":22},"A级",{"key":24,"text":310,"correct":26},"B级",{"key":28,"text":312,"correct":26},"C级",{"key":31,"text":314,"correct":26},"D级",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":24,"analysis":33},389653,"根据《计算机软件可靠性和可维护性管理 GB\u002FT14394—2008》，在软件生存周期的可行性研究和计划阶段，为强调软件可靠性和可维护性要求，需要完成的活动是 （ ） 。",[319,321,323,325],{"key":20,"text":320,"correct":26},"编制软件可靠性和可维护性大纲",{"key":24,"text":322,"correct":22},"提出软件可靠性和可维护性目标",{"key":28,"text":324,"correct":26},"可靠性和可维护性概要设计",{"key":31,"text":326,"correct":26},"可靠性和可维护性目标分配",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":31,"analysis":33},389654,"根据《电子信息系统机房设计规范GB50174—2008》，下面说法正确的是 （ ） 。",[331,333,335,337],{"key":20,"text":332,"correct":26},"电子信息系统机房的耐火等级不应低于三级，可以与其他建筑物合用一个防火区",{"key":24,"text":334,"correct":26},"电子信息系统机房应有设备出入口，可以与人员共用同一出入口",{"key":28,"text":336,"correct":26},"面积大于300米的主机房，安全出口不应少于二个，且应集中设置",{"key":31,"text":338,"correct":22},"主机房的顶棚、壁板和隔断不能采用可燃有机复合材料",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":20,"analysis":33},389655,"依据GB\u002FT8566-2007《信息技术软件生存周期过程》中有关配置管理的规定，（ ）是配置控制的任务。①建立基线的文档②批准或否决变更请求③审核跟踪变更④确定和保证软件项针对其需求的功能完备性、物理完整性分析和评价变更⑤分析和评估变更⑥编制配置管理计划⑦实现、验证和发布已修改的软件项",[343,345,347,349],{"key":20,"text":344,"correct":22},"②③⑤⑦",{"key":24,"text":346,"correct":26},"①③⑤⑥",{"key":28,"text":348,"correct":26},"①③⑤⑦",{"key":31,"text":350,"correct":26},"②④⑥⑦",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":24,"analysis":33},389656,"根据《GB\u002FT 12504—90计算机软件质量保证计划规范》，评审文档质量的度量准则中的 （ ） 准则，要求在软件开发各个阶段所编写的文档的内容，必须真实地反映该阶段的工作且与该阶段的需求相一致。",[355,357,359,361],{"key":20,"text":356,"correct":26},"完备性",{"key":24,"text":358,"correct":22},"正确性",{"key":28,"text":360,"correct":26},"简明性",{"key":31,"text":362,"correct":26},"自说明性",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":28,"analysis":33},389657,"软件的质量需求是软件需求的一部分，根据《软件工程 产品质量 第1部分：质量模型 GB\u002FT 16260.1—2006》，软件产品质量需求的完整描述要包括 （ ） ，以满足开发者、维护者、需方以及最终用户的需要。 ① 内部质量的评估准则 ② 外部质量的评估准则③ 使用质量的评估准则 ④ 过程质量的评估准则",[367,369,371,373],{"key":20,"text":368,"correct":26},"①②",{"key":24,"text":370,"correct":26},"③",{"key":28,"text":372,"correct":22},"①②③",{"key":31,"text":374,"correct":26},"①②③④",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":31,"analysis":33},389658,"国际标准化组织在ISO\u002FIEC 12207－1995中将软件过程分为三类，其中不包括（ ）。",[379,381,383,385],{"key":20,"text":380,"correct":26},"基本过程",{"key":24,"text":382,"correct":26},"支持过程",{"key":28,"text":384,"correct":26},"组织过程",{"key":31,"text":386,"correct":22},"管理过程",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":24,"analysis":33},389659,"文档管理是软件开发过程中一项非常重要的工作，根据 GB\u002FT16680-1996中的相关规定，描述开发小组职责的文档属于 （ ） 。",[391,393,395,397],{"key":20,"text":392,"correct":26},"人力资源文档",{"key":24,"text":394,"correct":22},"管理文档",{"key":28,"text":396,"correct":26},"产品文档",{"key":31,"text":398,"correct":26},"开发文档",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":31,"analysis":33},389660,"某企业经过多年的发展，在产品研发、集成电路设计等方面取得了丰硕成果，积累了大量知识财富， （ ） 不属于该企业的知识产权范畴。",[403,405,407,409],{"key":20,"text":404,"correct":26},"专利权",{"key":24,"text":406,"correct":26},"版图权",{"key":28,"text":408,"correct":26},"商标权",{"key":31,"text":410,"correct":22},"产品解释权",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":28,"analysis":33},389661,"某软件开发企业，在平面媒体上刊登了其开发的财务软件销售商业广告，概要介绍了产品的功能。按照合同法规定，该商业广告属于 （ ） 。",[415,417,419,421],{"key":20,"text":416,"correct":26},"要约",{"key":24,"text":418,"correct":26},"承诺",{"key":28,"text":420,"correct":22},"要约邀请",{"key":31,"text":422,"correct":26},"承诺邀请",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":28,"analysis":33},389662,"（ ）不受《著作权法》保护。（1）文宇作品（2）口述作品（3）音乐、戏剧、曲艺（4）摄影作品（5）计算机软件（6）时事新闻（7）通用表格和公式",[427,429,431,433],{"key":20,"text":428,"correct":26},"（2）（6）（7 ）",{"key":24,"text":430,"correct":26},"（2）（5）（6）",{"key":28,"text":432,"correct":22},"（6）（7）",{"key":31,"text":434,"correct":26},"（3）（5）",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":28,"analysis":33},389663,"张某购买了一张有注册商标的应用软件光盘，擅自复制出售，其行为是侵犯（ ）行为。",[439,441,443,445],{"key":20,"text":440,"correct":26},"注册商标专用权",{"key":24,"text":442,"correct":26},"光盘所有权",{"key":28,"text":444,"correct":22},"软件著作权",{"key":31,"text":446,"correct":26},"软件专利权",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":20,"analysis":33},389664,"依据《合同法》第九十二条，合同的权利义务终止后，当事人根据交易习惯履行保密义务，该义务的依据是 （ ） 。",[451,453,455,457],{"key":20,"text":452,"correct":22},"诚实信用原则",{"key":24,"text":454,"correct":26},"协商原则",{"key":28,"text":456,"correct":26},"资源原则",{"key":31,"text":458,"correct":26},"第三方协助原则",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":20,"analysis":33},389665,"（ ） 属于评标依据。",[463,465,467,469],{"key":20,"text":464,"correct":22},"招标文件",{"key":24,"text":466,"correct":26},"企业法人营业执照复印件",{"key":28,"text":468,"correct":26},"公司业绩",{"key":31,"text":470,"correct":26},"施工组织设计",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":20,"analysis":33},389666,"（ ）指可以不经著作权人许可，无需支付报酬，使用其作品。",[475,477,479,481],{"key":20,"text":476,"correct":22},"合理使用",{"key":24,"text":478,"correct":26},"许可使用",{"key":28,"text":480,"correct":26},"强制许可使用",{"key":31,"text":482,"correct":26},"法定许可使用",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":31,"analysis":33},389667,"设甲乙丙三人独立解决某个问题的概率分别为0.45、0.55、0.6，则三人一起解决该问题的概率约为（ ）。",[487,489,491,493],{"key":20,"text":488,"correct":26},"0.53",{"key":24,"text":490,"correct":26},"0.7",{"key":28,"text":492,"correct":26},"0.8",{"key":31,"text":494,"correct":22},"0.9",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":24,"analysis":33},389668,"某软件主要由操作系统程序和数据库程序组成。受前任项目经理的安排，甲正在开发该软件的数据库程序。乙和丙都在开发软件的操作系统。新任项目经理曾和甲、乙、丙共事，统计过他们开发类似程序的缺陷率水平。如下表所示，为保证该软件的代码质量，新任项目经理应 （ ） 。",[499,501,503,505],{"key":20,"text":500,"correct":26},"调换甲、丙的工作，各自在对方编写的代码基础上继续开发",{"key":24,"text":502,"correct":22},"维持开发任务分工不变，同时让乙培训丙",{"key":28,"text":504,"correct":26},"维持开发任务分工不变，同时让甲培训丙",{"key":31,"text":506,"correct":26},"维持开发任务分工不变，同时让甲培训乙，乙培训丙",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":28,"analysis":33},389669,"假设某IT服务企业，其固定成本为30万元，每项服务的变动成本为1000元\u002F次，提供每项服务的价格为1500元\u002F次，那么该企业的盈亏平衡点为 （ ） 次。",[511,513,515,517],{"key":20,"text":512,"correct":26},"200",{"key":24,"text":514,"correct":26},"300",{"key":28,"text":516,"correct":22},"600",{"key":31,"text":518,"correct":26},"无法确定",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":24,"analysis":33},389670,"已知网络图各段路线所需费用如下图所示，图中甲线和乙线上的数宇分别代表相应点的有关费用。从甲线到乙线的最小费用路线有（ ）条",[523,525,526,527],{"key":20,"text":524,"correct":26},"1",{"key":24,"text":81,"correct":22},{"key":28,"text":79,"correct":26},{"key":31,"text":77,"correct":26},{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":28,"analysis":33},389671,"制造某种产品需要四道工序，每道工序可选用多种方法。下图列出了制造这种产品各道工序可选用的不同方法：从节点1开始，连续经过4条线段（表示4道工序所选用的方法），组成一条线路，直到节点12结束。每条线段上标记的数字表示利用相应方法每件产品可以获得的利润（元）。企业为了获取最大利润，需要找出从节点1到节点12的一条线路，使其对应的各道工序的利润之和达到最大。利用运筹方法计算后可知，制造每件产品可以获得的最大利润是 （ ） 元。",[532,534,536,538],{"key":20,"text":533,"correct":26},"28",{"key":24,"text":535,"correct":26},"31",{"key":28,"text":537,"correct":22},"33",{"key":31,"text":539,"correct":26},"34",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":24,"analysis":33},389672,"某公司希望举办一个展销会以扩大市场，选择北京、天津、上海、深圳作为候选会址。获利情况除了会址关系外，还与天气有关。天气可分为晴、多云、多雨三种。通过天气预报，估计三种天气情况可能发生的概率为0.25、0.50、0.25，其收益（单位：人民币万元）情况见下表。使用决策树进行决策的结果为 （ ）。",[544,546,548,550],{"key":20,"text":545,"correct":26},"北京",{"key":24,"text":547,"correct":22},"天津",{"key":28,"text":549,"correct":26},"上海",{"key":31,"text":551,"correct":26},"深圳",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":20,"analysis":33},389673,"某工厂是生产电源的企业，在出厂产品质量控制过程中，使用统计抽样原理检查10000部电源的质量状况。在随机抽取200个进行检查后，发现有5个电源的外观不合格、4个电源的接口不合格，其中有两个电源同时存在这两种不合格缺陷，其余电源未发现问题。根据统计抽样的基本原理，这批电源的合格率为 （ ） 。",[556,558,560,562],{"key":20,"text":557,"correct":22},"96.5%",{"key":24,"text":559,"correct":26},"96%",{"key":28,"text":561,"correct":26},"95.5%",{"key":31,"text":563,"correct":26},"90%",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":28,"analysis":33},389674,"某软件工程项目各开发阶段工作量的比例如下表所示。 假设当前已处于编码阶段，3000行程序已完成了1200行，则可估算出该工程项目开发进度已完成的比例是 （ ） 。",[568,570,572,574],{"key":20,"text":569,"correct":26},"43%",{"key":24,"text":571,"correct":26},"49%",{"key":28,"text":573,"correct":22},"57%",{"key":31,"text":575,"correct":26},"63%",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":24,"analysis":33},389675,"某项目由并行的3个活动甲、乙和丙组成，为活动甲分配3人5天可以完成，活动乙分配6人7天可以完成，活动丙分配4人2天可以完成，活动完成后人员可再调配。在此情况下，项目最短工期为（ ）天。",[580,582,584,586],{"key":20,"text":581,"correct":26},"6",{"key":24,"text":583,"correct":22},"7",{"key":28,"text":585,"correct":26},"8",{"key":31,"text":587,"correct":26},"9",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":28,"analysis":33},389676,"项目经理计划访谈所有为项目实施所雇佣的临时员工。项目经理第一日随机挑选了50名临时员工进行了访谈，第二天又随机选取了20名临时员工，发现其中5名已于昨日访谈过，便对其余15名进行了访谈。则项目经理还需要访谈约 （ ） 人才能完成访谈所有临时员工的任务。",[592,594,596,598],{"key":20,"text":593,"correct":26},"75",{"key":24,"text":595,"correct":26},"185",{"key":28,"text":597,"correct":22},"135",{"key":31,"text":599,"correct":26},"150",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":20,"analysis":33},389677,"某项目实施需要甲产品，若自制，单位产品的可变成本为12元，并需另外购买一台专用设备，该设备价格为4000元；若采购，购买量大于3000件，购买价格为13元\u002F件，购买量少于3000件时，购买价为14元\u002F件，则甲产品用量 （ ） 时，外购为宜。",[604,606,608,610],{"key":20,"text":605,"correct":22},"小于2000件",{"key":24,"text":607,"correct":26},"大于2000件，小于3000件时",{"key":28,"text":609,"correct":26},"小于3000件",{"key":31,"text":611,"correct":26},"大于3000件",[613,617,620,623,626,629],{"id":614,"name":615,"category":7,"favorite":616},136,"法律职业试卷二(客观题 )",2,{"id":618,"name":619,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":621,"name":622,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":624,"name":625,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":627,"name":628,"category":7,"favorite":8},28,"安全工程师",{"id":630,"name":631,"category":7,"favorite":8},112,"安全生产法律知识"]