[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":612},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,24,50,1856,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,247,257,269,281,293,305,317,328,340,349,361,373,385,397,409,421,433,445,457,468,480,492,504,516,528,540,552,564,576,588,600],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},389373,1,"单选题","关于典型的大型、复杂信息系统项目，下列做法中， （ ） 是不正确的。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","项目团队构成复杂，不仅包括项目内部人员体系，也包括合作方人员体系",false,{"key":24,"text":25,"correct":22},"B","项目规模较大，目标构成复杂，往往分解成目标相互关联的小项目",{"key":27,"text":28,"correct":29},"C","项目沟通成本大幅度上升，项目经理应该直接管理各子项目内的沟通",true,{"key":31,"text":32,"correct":22},"D","项目管理方法与小型项目相比发生了根本的改变","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},389374,"关于项目管理办公室（PMO）的叙述， （ ） 是错误的。",[38,40,42,44],{"key":20,"text":39,"correct":22},"PMO可以为项目管理提供支持服务",{"key":24,"text":41,"correct":29},"PMO应该位于组织的中心区域",{"key":27,"text":43,"correct":22},"PMO可以为项目管理提供培训、标准化方针及程序",{"key":31,"text":45,"correct":22},"PMO可以负责项目的行政管理",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},389375,"项目组合管理可以将组织战略进一步细化到选择哪些项目来实现组织的目标，其选择的主要依据在于 （ ） 。",[50,52,54,56],{"key":20,"text":51,"correct":29},"交付能力和收益",{"key":24,"text":53,"correct":22},"追求人尽其才",{"key":27,"text":55,"correct":22},"追求最低的风险",{"key":31,"text":57,"correct":22},"平衡人力资源专长",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},389376,"关于项目管理办公室对多项目的管理，以下叙述不正确的是 （ ） 。",[62,64,66,68],{"key":20,"text":63,"correct":22},"使用项目管理系统可强化对各项目的监控",{"key":24,"text":65,"correct":22},"出于成本考虑，一般不对单个项目建立独立的一套过程规范",{"key":27,"text":67,"correct":22},"项目管理办公室不仅要对各项目实施有效监控，还要负责对各项目进行专业指导",{"key":31,"text":69,"correct":29},"为了不对各个项目的实施造成影响，项目管理办公室一般不对各项目进行资源平衡",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},389377,"在项目组合管理中，对结构化的项目进行选择和优先级排序，一般会直接用到（ ）技术。",[74,76,78,80],{"key":20,"text":75,"correct":22},"需求分析",{"key":24,"text":77,"correct":22},"挣值分析",{"key":27,"text":79,"correct":29},"财务分析",{"key":31,"text":81,"correct":22},"计划评审",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},389378,"在对大型及复杂项目实施跟踪和控制的过程中，需要重点关注的环节是 （ ） 。",[86,88,90,92],{"key":20,"text":87,"correct":22},"对项目过程的持续改进",{"key":24,"text":89,"correct":22},"对项目总体计划的实时更新",{"key":27,"text":91,"correct":29},"加强绩效报告的有效性并处理好项目的变更",{"key":31,"text":93,"correct":22},"确定项目实现其质量目标的方法",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},389379,"下列叙述中，错误的是 （ ） 。",[98,100,102,104],{"key":20,"text":99,"correct":22},"企业可通过PMO来实施组织级项目管理",{"key":24,"text":101,"correct":22},"项目管理知识主要用于指导项目级管理",{"key":27,"text":103,"correct":29},"大型项目必须建立组织级管理",{"key":31,"text":105,"correct":22},"可以对有组织级管理的大型项目单独建立一套过程规范",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},389380,"大型复杂项目中，统一的项目过程体系可以保证项目质量。在统一过程体系中，（ ）相对更重要，以使过程制度达到期望的效果。",[110,112,114,116],{"key":20,"text":111,"correct":22},"制定过程",{"key":24,"text":113,"correct":22},"执行过程",{"key":27,"text":115,"correct":29},"监督过程",{"key":31,"text":117,"correct":22},"改进过程",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},389381,"解决组织中多个项目之间的资源冲突问题，一般不宜采用的方法是 （ ） 。",[122,124,126,128],{"key":20,"text":123,"correct":29},"制定资源计划时，每个项目预留尽量多的资源富余量",{"key":24,"text":125,"correct":22},"检查组织内部的资源使用情况，看是否有资源分配不合理的情况",{"key":27,"text":127,"correct":22},"制定资源在项目间分配的原则，重要的项目优先得到资源",{"key":31,"text":129,"correct":22},"将组织中的资源进行统一管理，避免资源浪费和过度使用",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},389382,"项目组合管理是指为了实现特定的战略业务目标，对一个或多个项目组合进行集中管理,包括识别、排序、授权、管理和控制项目，项目集和其他有关工作。以下关于项目组合管理的叙述中（ ）是不正确的。",[134,136,138,140],{"key":20,"text":135,"correct":29},"项目组合管理主要采用的是自下而上的管理方式",{"key":24,"text":137,"correct":22},"项目组合管理过程一般是进行组织决策的过程",{"key":27,"text":139,"correct":22},"项目组合管理要确保与组织战略协调一致",{"key":31,"text":141,"correct":22},"通过审核项目和项目集来确定资源分配的优先顺序",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},389383,"项目组合管理实施的主要过程不包括（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":29},"评估项目组合管理战略计划",{"key":24,"text":149,"correct":22},"定义项目组合管理的愿景和计划",{"key":27,"text":151,"correct":22},"实施项目组合管理过程",{"key":31,"text":153,"correct":22},"改进项目组合管理过程",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},389384,"在大型复杂IT项目管理中，为了提高项目之间的协作效率，通常应首先 （ ） 。",[158,160,162,164],{"key":20,"text":159,"correct":22},"确保每个项目经理都明确项目的总体目标",{"key":24,"text":161,"correct":29},"建立统一的项目过程作为IT项目管理的基础",{"key":27,"text":163,"correct":22},"为每一个项目单独建立一套合适的过程规范",{"key":31,"text":165,"correct":22},"制定合理的沟通计划",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},389385,"有关大型及复杂项目管理的说法中， （ ） 是错误的。",[170,172,174,176],{"key":20,"text":171,"correct":22},"大型项目经理的日常职责更集中于管理职责",{"key":24,"text":173,"correct":29},"大型项目管理模式接近于直接管理模式",{"key":27,"text":175,"correct":22},"在大型项目中应明确大项目经理和子项目经理各自的职责",{"key":31,"text":177,"correct":22},"在大型项目中应建立统一的项目过程",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},389386,"在项目组合管理中，项目排序是对项目创造的 （ ） 和投入进行分析，以选择出对组织最有利项目的过程。",[182,184,186,188],{"key":20,"text":183,"correct":22},"功能性交付物",{"key":24,"text":185,"correct":22},"交付物",{"key":27,"text":187,"correct":22},"期望货币值",{"key":31,"text":189,"correct":29},"期望价值",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},389387,"以下关于大型复杂项目和多项目管理的叙述中，不正确的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"大型复杂项目必须建立以过程为基础的管理体系",{"key":24,"text":197,"correct":29},"为了确保大型复杂项目的过程制度起到预期作用，必须在项目团队内部建立统一的体系，包括制定过程、计划过程、执行过程",{"key":27,"text":199,"correct":22},"大型复杂项目的项目过程确定后，再制定项目计划",{"key":31,"text":201,"correct":22},"大型IT项目大都是在需求不十分清晰的情况下开始的，所以项目自然分成需求定义和需求实现两个主要阶段",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},389388,"大型复杂项目与一般项目管理比较， （ ） 。",[206,208,210,212],{"key":20,"text":207,"correct":22},"管理原理不同",{"key":24,"text":209,"correct":22},"管理方法和工具不同",{"key":27,"text":211,"correct":22},"管理程序不同",{"key":31,"text":213,"correct":29},"管理范围不同",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},389389,"对于大型及复杂项目而言，在制订活动计划之前，必须要确定用什么方法和过程来完成项目。 （ ） 就是满足这一要求的项目管理方法。",[218,220,222,224],{"key":20,"text":219,"correct":29},"过程计划",{"key":24,"text":221,"correct":22},"基准计划",{"key":27,"text":223,"correct":22},"生命周期计划",{"key":31,"text":225,"correct":22},"统一的项目过程",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},389390,"（ ） 不属于项目型组织的缺点。",[230,232,234,236],{"key":20,"text":231,"correct":29},"目标单一",{"key":24,"text":233,"correct":22},"员工缺乏事业上的连续性和保障",{"key":27,"text":235,"correct":22},"不利于沟通、技术知识共享",{"key":31,"text":237,"correct":22},"难以监测和控制",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},389391,"大型复杂项目的项目管理有别于单项目管理，，对于大型复杂项目来说，在该计划中一般不会包括（ ） 。",[242,243,245,246],{"key":20,"text":113,"correct":22},{"key":24,"text":244,"correct":29},"裁剪过程",{"key":27,"text":115,"correct":22},{"key":31,"text":111,"correct":22},{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":24,"analysis":33},389392,"项目选择和项目优先级排序是项目组合管理的重要内容，其中 （ ） 不属于结构化的项目选择和优先级排序的方法。",[251,253,254,255],{"key":20,"text":252,"correct":22},"DIPP分析",{"key":24,"text":187,"correct":29},{"key":27,"text":79,"correct":22},{"key":31,"text":256,"correct":22},"决策表技术",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":31,"analysis":33},389393,"在项目组合管理中，确定项目优先级的主要决定因素是 （ ） 。",[261,263,265,267],{"key":20,"text":262,"correct":22},"项目的进度",{"key":24,"text":264,"correct":22},"项目组合的收益",{"key":27,"text":266,"correct":22},"项目总成本",{"key":31,"text":268,"correct":29},"组织战略",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":31,"analysis":33},389394,"大型复杂项目，一般具有周期较长规模较大、目标构成复杂等特征，因此大型复杂项目的控制过程与普通项目的控制过程有较大差别。（ ）不属于大型复杂项目控制过程的重要因素。",[273,275,277,279],{"key":20,"text":274,"correct":22},"项目绩效跟踪",{"key":24,"text":276,"correct":22},"外部变更请求",{"key":27,"text":278,"correct":22},"变更控制",{"key":31,"text":280,"correct":29},"里程碑设置",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":31,"analysis":33},389395,"以下做法中， （ ） 对于提高大型复杂项目的协作管理帮助最小",[285,287,289,291],{"key":20,"text":286,"correct":22},"建立统一的项目过程，以提高协作效率",{"key":24,"text":288,"correct":22},"加强项目团队管理，制定有效的沟通机制",{"key":27,"text":290,"correct":22},"在项目组织内要约定统一的信息采集、发送、报告的机制",{"key":31,"text":292,"correct":29},"大型项目经理采用“间接管理”的方式，将大项目分解成粒度尽量小的项目群",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":31,"analysis":33},389396,"在大型项目的管理中，项目成功的一个关键因素是项目团队具有很高的效率。 （ ）是关于团队效率的正确解释。",[297,299,301,303],{"key":20,"text":298,"correct":22},"个体效率高，则协作效率高",{"key":24,"text":300,"correct":22},"更应该关注个体上的效率而不是协作上的效率",{"key":27,"text":302,"correct":22},"协作效率等于单个的个体效率之和",{"key":31,"text":304,"correct":29},"更应该关注协作上的效率而不是个体上的效率",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":20,"analysis":33},389397,"项目组合管理是一个保证组织内所有项目都经过风险和收益分析，平衡资源的方法论，其中 （ ） 是项目组合管理工作的一个要素。",[309,311,313,315],{"key":20,"text":310,"correct":29},"提高资源利用效率",{"key":24,"text":312,"correct":22},"风险管理",{"key":27,"text":314,"correct":22},"范围管理",{"key":31,"text":316,"correct":22},"项目战术管理",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":31,"analysis":33},389398,"大型复杂项目的项目管理有别于单项目管理，，对于大型复杂项目来说，首先应该制定的计划是（ ） 。",[321,323,325,327],{"key":20,"text":322,"correct":22},"进度计划",{"key":24,"text":324,"correct":22},"成本计划",{"key":27,"text":326,"correct":22},"范围计划",{"key":31,"text":219,"correct":29},{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":20,"analysis":33},389399,"项目组合管理是一个保证组织内所有项目都经过风险和收益分析及平衡的方法论。作为公司的项目经理进行项目组合管理时，（ ）应是重点考虑的要素。",[332,334,336,338],{"key":20,"text":333,"correct":29},"资源利用效率",{"key":24,"text":335,"correct":22},"项目进度控制",{"key":27,"text":337,"correct":22},"范围变更",{"key":31,"text":339,"correct":22},"项目质量",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":27,"analysis":33},389400,"在大型负责项目计划过程中，建立统一的项目过程将提高项目之间的协作效率，有力地保证项目质量。这就要求在项目团队内部建立一个体系，一般来说，统一的项目过程不包括 （ ） 。",[344,345,346,348],{"key":20,"text":111,"correct":22},{"key":24,"text":115,"correct":22},{"key":27,"text":347,"correct":29},"优化过程",{"key":31,"text":113,"correct":22},{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":24,"analysis":33},389401,"根据《中华人民共和国合同法》，隐蔽工程在隐蔽以前，承包人应当通知（ ） 来检查。若其没有及时来检查，承包人可以顺延工程日期，并有权要求赔偿停工等造成的损失。",[353,355,357,359],{"key":20,"text":354,"correct":22},"承建人",{"key":24,"text":356,"correct":29},"发包人",{"key":27,"text":358,"correct":22},"分包人",{"key":31,"text":360,"correct":22},"设计",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":27,"analysis":33},389402,"以下关于投标文件送达的叙述， （ ） 是错误的。",[365,367,369,371],{"key":20,"text":366,"correct":22},"投标人必须按照招标文件规定的地点、在规定的时间内送达投标文件",{"key":24,"text":368,"correct":22},"投递投标书的方式最好是直接送达或委托代理人送达，以便获得招标机构已收到投标书的回执",{"key":27,"text":370,"correct":29},"如果以邮寄方式送达的，投标人应保证投标文件能够在截止日期之前投递即可",{"key":31,"text":372,"correct":22},"招标人收到标书以后应当签收，在开标前不得开启",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":27,"analysis":33},389403,"某单位要对一个网络集成项目进行招标，由于现场答辩环节没有一个定量的标准，相关负责人在制定该项评分细则时规定本项满分为10分，但是评委的打分不得低于5分。这一规定反映了制定招标评分标准时 （ ）",[377,379,381,383],{"key":20,"text":378,"correct":22},"以客观事实为依据",{"key":24,"text":380,"correct":22},"得分应能明显分出高低",{"key":27,"text":382,"correct":29},"严格控制自由裁量权",{"key":31,"text":384,"correct":22},"评分标准应便于评审",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":27,"analysis":33},389404,"根据《中华人民共和国政府采购法》的规定，当______时不采用竞争性谈判方式采购。",[389,391,393,395],{"key":20,"text":390,"correct":22},"技术复杂或性质特殊，不能确定详细规格或具体要求",{"key":24,"text":392,"correct":22},"采用招标所需时间不能满足用户紧急需要",{"key":27,"text":394,"correct":29},"发生了不可预见的紧急情况不能从其他供应商处采购",{"key":31,"text":396,"correct":22},"不能事先计算出价格总额",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":20,"analysis":33},389405,"______指可以不经著作权人许可，无需支付报酬，使用其作品",[401,403,405,407],{"key":20,"text":402,"correct":29},"合理使用",{"key":24,"text":404,"correct":22},"许可使用",{"key":27,"text":406,"correct":22},"强制许可使用",{"key":31,"text":408,"correct":22},"法定许可使用",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":31,"analysis":33},389406,"W公司想要对本单位的内部网络和办公系统进行改造，希望通过招标选择承建商，为此，W公司进行了一系列活动。以下 （ ） 活动不符合《中华人民共和国招标投标法》的要求。",[413,415,417,419],{"key":20,"text":414,"correct":22},"对此项目的承建方和监理方的招标工作，W公司计划由同一家招标代理机构负责招标，并计划在同一天开标",{"key":24,"text":416,"correct":22},"W公司根据此项目的特点和需要编制了招标文件，并确定了提交投标文件的截止日期",{"key":27,"text":418,"correct":22},"有四家公司参加了投标，其中一家投标单位在截止日期之后提交投标文件，W公司认为其违反了招标文件要求，没有接受该投标单位的投标文件",{"key":31,"text":420,"correct":29},"W公司根据招标文件的要求，在三家投标单位中选择了其中一家作为此项目的承建商，并只将结果通知了中标企业",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":20,"analysis":33},389407,"为说明某一问题，在学术论文中需要引用某些资料，以下叙述中错误的是（）。",[425,427,429,431],{"key":20,"text":426,"correct":29},"既可引用发表的作品，也可引用未发表的作品",{"key":24,"text":428,"correct":22},"只能限于介绍、评论作品",{"key":27,"text":430,"correct":22},"只要不构成自己作品的主要部分，可适当引用资料",{"key":31,"text":432,"correct":22},"不必征得原作者的同意，不需要向他支付报酬",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":24,"analysis":33},389408,"______与《中华人民共和国政府采购法》的有关内容一致。",[437,439,441,443],{"key":20,"text":438,"correct":22},"政府采购是指各级国家机关、事业单位和团体组织，使用贷款、财政性资金或自筹资金采购依法制订的集中采购目录以内的或者采购限额标准以上的货物、工程和服务的行为",{"key":24,"text":440,"correct":29},"货物是指各种形态和种类的物品，包括原材料、燃料、设备、产品等。工程是指建设工程，包括建筑物和构筑物的新建、改建、扩建、装修、拆除、修缮等",{"key":27,"text":442,"correct":22},"在技术咨询合同、技术服务合同履行过程中，受托人利用委托人提供的技术资料和工作条件完成的新的技术成果，属于受托人。委托人利用受托人的工作成果完成的新的技术成果，属于委托人。当事人另有约定的，按照其约定",{"key":31,"text":444,"correct":22},"中标人按照合同约定或者经招标人同意，可以将中标项目的部分非主体、非关键性工作分包给他人完成",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":27,"analysis":33},389409,"软件公司的软件产品注册商标为M，为确保公司在市场竞争中占据优势，对员工进行了保密约束。此情形下该公司不享有：",[449,451,453,455],{"key":20,"text":450,"correct":22},"商业秘密权",{"key":24,"text":452,"correct":22},"著作权",{"key":27,"text":454,"correct":29},"专利权",{"key":31,"text":456,"correct":22},"商标权",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":31,"analysis":33},389410,"王某买了一件美术作品原件，则他享有该美术作品的（）。",[461,462,464,466],{"key":20,"text":452,"correct":22},{"key":24,"text":463,"correct":22},"所有权",{"key":27,"text":465,"correct":22},"展览权",{"key":31,"text":467,"correct":29},"所有权和展览权",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":20,"analysis":33},389411,"当事人应当按照约定全面履行自己的义务，下面说法不正确的是（ ）",[472,474,476,478],{"key":20,"text":473,"correct":29},"价款或者报酬不明确的，按照订立合同的地方的市场价格履行",{"key":24,"text":475,"correct":22},"履行地点不明确，给付货币的，在接收货币一方所在地履行",{"key":27,"text":477,"correct":22},"履行方式不明确的，按照有利于实现合同目的的方式履行",{"key":31,"text":479,"correct":22},"履行期限不明确的，债务人可以随时履行，债权人随时要求履行，但应当给对方必要的准备时间。",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":27,"analysis":33},389412,"根据《中华人民共和国招标投标法》的规定，以下叙述中，不正确的是（ ）。",[484,486,488,490],{"key":20,"text":485,"correct":22},"国务院发展计划部门确定的国家重点项目和省、自治区、直辖市人民政府确定的地方重点项目不适宜公开招标的，经国务院发展计划部门或者省、自治区、直辖市人民政府批准，可以进行邀请招标",{"key":24,"text":487,"correct":22},"机招标人有权自行选择招标代理机构，委托其办理招标事宜。任何单位和个人不得以任何方式为招标人指定招标理构",{"key":27,"text":489,"correct":29},"招标项目按照国家有关规定需要履行项目审批手续的，可在招标前审批，也 可招标后履行审批手续",{"key":31,"text":491,"correct":22},"招标人需要在招标文件中如实载明招标项目有相应资金或者资金来源已经落实",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":20,"analysis":33},389413,"关于电子政务项目档案管理下列说法不正确的是（ ）",[496,498,500,502],{"key":20,"text":497,"correct":29},"电子政务项目实施机构应明确电子政务项目档案工作主管领导，制定档案工作计划，建立健全归档制度、档案分类编号方案等管理制度和业务规范，配备档案管理人员，提供档案管理所需经费、设备、场地等条件。",{"key":24,"text":499,"correct":22},"电子政务项目实施机构应对参建单位进行档案管理交底、指导、培训，对参建单位移交的档案进行审核、验收。",{"key":27,"text":501,"correct":22},"建设单位的档案管理部门应对电子政务项目的档案管理进行业务指导并提出具体要求，对实施机构制定的档案管理制度和业务规范进行审查，对电子政务档案的收集、整理、移交进行业务指导。",{"key":31,"text":503,"correct":22},"电子政务项目档案是在电子政务项目建设全过程中形成的、具有保存价值的各种形式和载体的历史记录，是电子政务项目竣工验收、运行维护、升级改造等工作的重要依据。",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":20,"analysis":33},389414,"以下采用单一来源采购方式的活动， 是不恰当的。",[508,510,512,514],{"key":20,"text":509,"correct":29},"某政府部门为建立内部办公系统，已从一个供应商采购了120万元的网络设备，由于办公地点扩大，打算继续从原供应商采购15万元的设备",{"key":24,"text":511,"correct":22},"某地区发生自然灾害，当地民政部门需要紧急采购一批救灾物资",{"key":27,"text":513,"correct":22},"某地方主管部门需要采购一种市政设施，目前此种设施国内仅有一家厂商生产",{"key":31,"text":515,"correct":22},"某政府机关为升级其内部办公系统，与原承建商签订了系统维护合同",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":31,"analysis":33},389415,"依照政府采购法采用竞争性谈判方式采购是（ ）",[520,522,524,526],{"key":20,"text":521,"correct":22},"具有特殊性，只能从有限范围的供应商处采购的。",{"key":24,"text":523,"correct":22},"只能从唯一供应商处采购的。",{"key":27,"text":525,"correct":22},"采购的货物规格、标准统一、现货货源充足且价格变化幅度小的政府采购项目",{"key":31,"text":527,"correct":29},"采用招标所需时间不能满足用户紧急需要的。",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":31,"analysis":33},389416,"以下对著作权的表述， （ ） 是错误的。",[532,534,536,538],{"key":20,"text":533,"correct":22},"中国公民、法人或者其他组织的作品，不论是否发表，享有著作权",{"key":24,"text":535,"correct":22},"对作品、作品的片段或者不构成作品的数据或者其他材料选择、编排体现独创性的新生作品，称为汇编作品，其著作权由汇编人享有",{"key":27,"text":537,"correct":22},"公民为完成法人或者其他组织工作任务所创作的作品是职务作品，其一般职务作品的著作权由作者享有",{"key":31,"text":539,"correct":29},"职务作品完成两年内，作者在任何情况下均不可以许可第三人以与单位使用的相同方式使用该作品",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":24,"analysis":33},389417,"在建设工程合同的订立过程中，投标人根据招标内容在约定期限内向招标人提交的投标文件，此为（ ）",[544,546,548,550],{"key":20,"text":545,"correct":22},"要约邀请",{"key":24,"text":547,"correct":29},"要约",{"key":27,"text":549,"correct":22},"承诺",{"key":31,"text":551,"correct":22},"承诺生效",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":27,"analysis":33},389419,"对违反本办法其他规定的或因管理不善、弄虚作假，造成严重超概算、质量低劣、损失浪费、安全事故或者其他责任事故的，项目审批部门可予以（ ）",[556,558,560,562],{"key":20,"text":557,"correct":22},"取消资格",{"key":24,"text":559,"correct":22},"取消项目",{"key":27,"text":561,"correct":29},"通报批评",{"key":31,"text":563,"correct":22},"移交有关部门依法追究刑事责任",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":31,"analysis":33},389420,"依据《中华人民共和国政府采购法》，在招标采购中， （ ） 做法不符合关于废标的规定。",[568,570,572,574],{"key":20,"text":569,"correct":22},"出现影响采购公正的违法、违规行为的应予废标",{"key":24,"text":571,"correct":22},"符合专业条件的供应商或者对招标文件作出实质响应的供应商不足三家的应予废标",{"key":27,"text":573,"correct":22},"投标人的报价均超过了采购预算，采购人不能支付的应予废标",{"key":31,"text":575,"correct":29},"某投标人被废标后，采购人将废标理由仅通知该投标人",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":20,"analysis":33},389421,"评标委员中，技术、经济等方面的专家不得少于成员总数的 （ ） 。",[580,582,584,586],{"key":20,"text":581,"correct":29},"2\u002F3",{"key":24,"text":583,"correct":22},"1\u002F2",{"key":27,"text":585,"correct":22},"1\u002F3",{"key":31,"text":587,"correct":22},"2\u002F5",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":27,"analysis":33},389422,"某公司在制订招标评分标准时，下列做法较合适的是 （ ） 。",[592,594,596,598],{"key":20,"text":593,"correct":22},"对业绩评定的标准是：好、不好",{"key":24,"text":595,"correct":22},"服务能力评定标准是：根据其通过ISO20000认证情况酌情打分",{"key":27,"text":597,"correct":29},"价格分采用低价优先法计算",{"key":31,"text":599,"correct":22},"按照ISO9000认证情况，将质量标准分为7个档次",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":27,"analysis":33},389423,"某地政府采取询价方式采购网络设备， （ ） 是符合招投标法要求的。",[604,606,608,610],{"key":20,"text":605,"correct":22},"询价小组由采购人的代表和有关专家共8人组成",{"key":24,"text":607,"correct":22},"被询价的A供应商提供第一次报价后，发现报价有误，调整后提交了二次报价",{"key":27,"text":609,"correct":29},"询价小组根据采购需求，从符合资格条件的供应商名单中确定三家供应商，并向其发出询价通知书让其报价",{"key":31,"text":611,"correct":22},"采购人根据符合采购需求、质量和服务相等且报价最低的原则确定成交供应商，最后将结果通知成交供应商",[613,617,620,623,626,629],{"id":614,"name":615,"category":7,"favorite":616},136,"法律职业试卷二(客观题 )",2,{"id":618,"name":619,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":621,"name":622,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":624,"name":625,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":627,"name":628,"category":7,"favorite":8},28,"安全工程师",{"id":630,"name":631,"category":7,"favorite":8},112,"安全生产法律知识"]