[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-23":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":610},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,23,50,1856,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,464,473,485,497,509,521,533,541,553,565,577,589,598],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},389321,1,"单选题","下列关于BPR的叙述中，（）是不正确的。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","BPR需要对流程重新构思",false,{"key":24,"text":25,"correct":22},"B","BPR是对当前流程激进的破坏性创造",{"key":27,"text":28,"correct":29},"C","BPR是针对管理流程的重组",true,{"key":31,"text":32,"correct":22},"D","BPR有时会导致组织的不稳定","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},389322,"工作流技术在流程管理应用中的三个阶段分别是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"流程的设计、流程的实现、流程的改进和维护",{"key":24,"text":41,"correct":29},"流程建模、流程仿真、流程改进或优化",{"key":27,"text":43,"correct":22},"流程的计划、流程的实施、流程的维护",{"key":31,"text":45,"correct":22},"流程的分析、流程的设计、流程的实施和改进",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},389323,"围绕大型项目的目标管理，下列说法不正确的是 （ ） 。",[50,52,54,56],{"key":20,"text":51,"correct":22},"大型项目的范围一般在启动时较难清晰确定",{"key":24,"text":53,"correct":29},"大型项目目标应关注“效果”，而不关注“效率”",{"key":27,"text":55,"correct":22},"大型项目目标要分解到各子项目和各部门",{"key":31,"text":57,"correct":22},"在项目各阶段往往要调整项目目标的优先次序",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},389324,"关于大型及复杂项目的计划过程的描述正确的是 （ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"大型及复杂项目的计划主要关注项目的活动计划",{"key":24,"text":65,"correct":22},"大型及复杂项目必须建立以活动为基础的管理体系",{"key":27,"text":67,"correct":22},"大型及复杂项目建立单独的过程规范不会增加成本",{"key":31,"text":69,"correct":29},"大型及复杂项目的计划必须先考虑项目的过程计划",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},389325,"针对大型IT项目，下列选项中 （ ） 是不正确的。",[74,76,78,80],{"key":20,"text":75,"correct":22},"大型IT项目一般是在需求不十分清晰的情况下开始的，所以需要对项目进行阶段性分解",{"key":24,"text":77,"correct":22},"通常由专业的咨询公司对需求进行详细的定义",{"key":27,"text":79,"correct":22},"使用甘特图制订项目的进度计划",{"key":31,"text":81,"correct":29},"项目需求定义和需求实现通常都是一方完成的",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},389326,"以下关于复杂项目管理的描述中，错误的是 （ ） 。",[86,88,90,92],{"key":20,"text":87,"correct":22},"复杂的项目会遵循先自上而下后自下而上的计划制订过程",{"key":24,"text":89,"correct":22},"WBS的层级结构为认识、把握复杂项目的逻辑关系提供了良好的工具",{"key":27,"text":91,"correct":22},"一个复杂的项目往往有很多参与者，项目的顺利进展有赖于不同角色的协调工作",{"key":31,"text":93,"correct":29},"认知和协同环境必须意味着复杂项目的自动成功",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},389327,"当一个大型及复杂项目在 （ ） 确定后，就需要制订项目计划。",[98,100,102,104],{"key":20,"text":99,"correct":22},"需求定义",{"key":24,"text":101,"correct":22},"活动计划",{"key":27,"text":103,"correct":29},"项目过程",{"key":31,"text":105,"correct":22},"项目团队",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},389328,"关于大型及复杂项目的描述，下列说法不正确的是 （ ） 。",[110,112,114,116],{"key":20,"text":111,"correct":22},"大型及复杂项目的项目经理日常职责更集中于管理职责",{"key":24,"text":113,"correct":29},"大型及复杂项目的管理与一般项目管理的方法有质的变化",{"key":27,"text":115,"correct":22},"大型及复杂项目的管理模式以间接管理为主",{"key":31,"text":117,"correct":22},"大型及复杂项目的管理是以项目群的方式进行",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},389329,"一般某个项目的计划主要关注的是项目 （ ） 的计划。",[122,124,126,128],{"key":20,"text":123,"correct":29},"活动",{"key":24,"text":125,"correct":22},"过程",{"key":27,"text":127,"correct":22},"进度",{"key":31,"text":129,"correct":22},"范围",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},389330,"关于大型IT项目的范围管理，下列做法中， （ ） 是最合适的。",[134,136,138,140],{"key":20,"text":135,"correct":22},"在大项目经理之下设定专人负责管理，并向大项目经理进行汇报",{"key":24,"text":137,"correct":22},"采用不同的方法对不同的子系统进行管理",{"key":27,"text":139,"correct":29},"在需求清澈之后，对项目管理计划进行调整，按照计划进行范围管理",{"key":31,"text":141,"correct":22},"在进行WBS分解时，WBS的第一层按产品结构进行划分，再逐层分解",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},389332,"CMM是美国卡内基梅隆大学软件工程研究所开发的（软件）能力成熟度模型，其中_____强调软件开发过程稳定性与项目量化管理。",[146,148,150,152],{"key":20,"text":147,"correct":22},"可重复级",{"key":24,"text":149,"correct":22},"已定义级",{"key":27,"text":151,"correct":29},"已管理级",{"key":31,"text":153,"correct":22},"持续优化级",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},389333,"大型项目一般需要各单项项目机构协作以保证实现总体项目目标，以下关于大型项目协作管理说法中，不正确的是 （ ） 。",[158,160,162,164],{"key":20,"text":159,"correct":22},"大型项目团队协作的效率取决于良好的团队纪律",{"key":24,"text":161,"correct":22},"统一的项目过程有助于提高单项协作的效率，因此保证子项目管理",{"key":27,"text":163,"correct":22},"大型项目的协作属于各单项之间的内外部协作",{"key":31,"text":165,"correct":29},"大型项目的项目经理日常职责属于直接管理",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},389334,"在项目组合管理中，在主旨范围内为项目分配资源。组织级项目管理中的资源平衡过程主要是： （ ） 。的说法是正确的。",[170,172,174,176],{"key":20,"text":171,"correct":22},"首先为单个项目做资源平衡，再在项目间进行资源平衡",{"key":24,"text":173,"correct":29},"针对所有项目的需求对组织内的资源进行统一的资源平衡",{"key":27,"text":175,"correct":22},"只在单一项目内进行资源平衡",{"key":31,"text":177,"correct":22},"主要针对资源短缺的项目进行资源优化与平衡",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},389335,"在大项目管理中，往往要在项目各阶段进行项目范围确认。有关范围确认的叙述，正确的是 （ ） 。",[182,184,186,188],{"key":20,"text":183,"correct":22},"应由项目管理办公室组织项目经理、市场代表进行范围确认",{"key":24,"text":185,"correct":29},"应由项目管理办公室组织客户代表等项目干系人进行范围确认",{"key":27,"text":187,"correct":22},"软件的回归测试是质量管理范围内的内容，与范围确认关系不大",{"key":31,"text":189,"correct":22},"范围确认就是对交付的实物进行认可",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},389336,"软件能力成熟度（CMM）模型提供了一个框架，将软件过程改进的进化步骤组织成5个成熟等级，为过程不断改进奠定了循序渐进的基础。由低到高5个等级命名为 （ ） 。",[194,196,198,200],{"key":20,"text":195,"correct":29},"初始级、可重复级、已定义级、已管理级、优化级",{"key":24,"text":197,"correct":22},"初始级、已定义级、可重复级、已管理级、优化级",{"key":27,"text":199,"correct":22},"初始级、可重复级、已管理级、已定义级、优化级",{"key":31,"text":201,"correct":22},"初始级、已定义级、已管理级、可重复级、优化级",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},389337,"结合大型项目的特点，企业下列做法中，不正确的是 （ ） 。",[206,208,210,212],{"key":20,"text":207,"correct":29},"企业在制订某大项目的过程计划之前，优先制订了项目的活动计划",{"key":24,"text":209,"correct":22},"企业围绕项目周期定义了一个大型项目，未考虑项目的规模和团队构成",{"key":27,"text":211,"correct":22},"企业在管理大型项目的过程中聘任了多名项目经理",{"key":31,"text":213,"correct":22},"企业将一个大项项目分解成若干个子项目进行管理",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},389338,"大型及复杂项目因其复杂性和多变性使得范围管理尤为重要，其中应遵循的基本原则不包括 （ ） 。",[218,220,222,224],{"key":20,"text":219,"correct":22},"通过分解结构对项目进行管理",{"key":24,"text":221,"correct":22},"包含了一系列子过程，用以确保能够实现项目目标所必需的工作",{"key":27,"text":223,"correct":29},"项目过程的持续改进",{"key":31,"text":225,"correct":22},"对项目变更应该统一控制",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":27,"analysis":33},389339,"张工程师被任命为一个大型复杂项目的项目经理，他对于该项目的过程管理有以下认识，其中 （ ） 是不正确的。",[230,232,234,236],{"key":20,"text":231,"correct":22},"可把该项目分解成为一个个目标相互关联的小项目，形成项目群进行管理",{"key":24,"text":233,"correct":22},"建立统一的项目过程会大大提高项目之间的协作效率，为项目质量提供有力保证",{"key":27,"text":235,"correct":29},"需要平衡成本和收益后决定是否建立适用于本项目的过程",{"key":31,"text":237,"correct":22},"对于此类持续时间较长并且规模较大的项目来说，项目初期所建立的过程，在项目进行过程中可以不断优化和改进",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},389340,"投资大、建设周期长、专业复杂的大型项目最好采用 （ ） 的组织形式或近似的组织形式。",[242,244,246,248],{"key":20,"text":243,"correct":29},"项目型",{"key":24,"text":245,"correct":22},"职能型",{"key":27,"text":247,"correct":22},"弱矩阵型",{"key":31,"text":249,"correct":22},"直线型",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},389342,"大型项目的计划管理过程有其自身的特点。围绕大型项目计划管理过程，下列说法中不正确的是 （ ）",[254,256,258,260],{"key":20,"text":255,"correct":22},"企业可自行定义不同级别的大型项目，并采用不同的计划管理过程",{"key":24,"text":257,"correct":22},"项目计划在需求定义完成后一般要进行修订，确保计划与实际的一致性",{"key":27,"text":259,"correct":22},"大型项目的WBS可以按照组织结构、产品结构、生命周期进行分解",{"key":31,"text":261,"correct":29},"为了保持管理的一致性，每个大型项目的计划制订都要采用统一的模板",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":27,"analysis":33},389343,"CMMI中的已管理级包含的七个过程域中， （ ） 的目的在于使工作人员和管理者客观洞察过程和相关的工作产品。",[266,268,270,272],{"key":20,"text":267,"correct":22},"度量和分析",{"key":24,"text":269,"correct":22},"供应商协定管理",{"key":27,"text":271,"correct":29},"过程和产品质量保证",{"key":31,"text":273,"correct":22},"项目策划",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":27,"analysis":33},389344,"大型及复杂项目可以按照项目的 （ ） 三个角度制订分解结构。",[278,280,282,284],{"key":20,"text":279,"correct":22},"产品范围、可交付物、约束条件",{"key":24,"text":281,"correct":22},"组织体系、需求分析、基准计划",{"key":27,"text":283,"correct":29},"组织结构、产品结构、生命周期",{"key":31,"text":285,"correct":22},"组织过程资产、范围说明书、范围管理计划",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},389345,"项目组合管理是指在可利用的资源和企业战略计划的指导下，进行多个项目或项目群投资的选择和支持。项目组合管理是通过项目评价选择、多项目组合优化，确保项目符合企业的战略目标，从而实现企业收益最大化。项目组合管理可以将组织战略进一步细化到选择哪些项目来实现组织的目标。其选择的主要依据在于 （ ） 。",[290,292,294,296],{"key":20,"text":291,"correct":22},"企业的根本利益",{"key":24,"text":293,"correct":29},"平衡风险和收益",{"key":27,"text":295,"correct":22},"资源计划",{"key":31,"text":297,"correct":22},"战略目标",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":27,"analysis":33},389346,"项目组合管理的一个目标是______。",[302,304,306,308],{"key":20,"text":303,"correct":22},"管理项目组合中每个项目文件中的各项内容",{"key":24,"text":305,"correct":22},"评估组织的项目管理成熟度，并依据评估结果估算完成组织当前在建项目所需的资源",{"key":27,"text":307,"correct":29},"通过慎重选择项目或大型项目并及时剔除不满足项目组合战略目标的项目，使项目组合的价值最大",{"key":31,"text":309,"correct":22},"在组织的所有项目上平衡所使用的资源",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":27,"analysis":33},389347,"项目管理办公室是公司的一个重要部门，其所承担的重要战略职能中不包括 （ ）",[314,316,318,320],{"key":20,"text":315,"correct":22},"将组织的既定战略反映到项目",{"key":24,"text":317,"correct":22},"建立和控制项目组合",{"key":27,"text":319,"correct":29},"使用赋予项目的资源来实现项目特定目标",{"key":31,"text":321,"correct":22},"提高组织项目管理能力",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":31,"analysis":33},389348,"公司目前可用的高级程序员有9名，有5个项目即将开始进行。项目A的优先级是9，需要高级程序员5名；项目B的优先级是7，需要高级程序员3名；项目C的优先级是6，需要高级程序员2名；项目D的优先级是5，需要高级程序员2名；项目E的优先级是3，需要高级程序员1名。5个项目总共需要高级程序员13名，作为这五个项目的项目组合的经理，应采用 （ ） 策略。",[326,328,330,332],{"key":20,"text":327,"correct":22},"A. 根据项目的优先级，满足项目 A、项目B的要求，部分满足项目C的需求",{"key":24,"text":329,"correct":22},"B. 根据需要高级程序员的人数和项目优先级，满足项目",{"key":27,"text":331,"correct":22},"项目E的要求根据项目的优先级，按照比例分配给5个项目人数，然后在各个项目内进行资源的优化和平衡",{"key":31,"text":333,"correct":29},"根据项目的优先级和各个项目的进度安排，从总体上考虑5个项目间的资源平衡",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},389349,"大型信息技术项目一般在需求不十分清晰的情况下开始，项目分成两个主要阶段：需求定义阶段和需求实现阶段。关于大型信息技术项目的需求管理， （ ） 的说法是正确的。",[338,340,342,344],{"key":20,"text":339,"correct":22},"为了计划的严肃性，项目计划在需求定义完成时，不能进行大的修订",{"key":24,"text":341,"correct":29},"项目需求定义和需求实现通常是由不同的组织完成的",{"key":27,"text":343,"correct":22},"项目需求定义和需求实现一般是由一方完成的",{"key":31,"text":345,"correct":22},"项目WBS可以按照组织结构、可交付物、基准计划三个层面进行分解",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":27,"analysis":33},389350,"某企业成立项目管理办公室用于运维项目群的统一管理协调和监控，项目管理办公室（ ） 做法是不可行的。",[350,352,354,356],{"key":20,"text":351,"correct":22},"建立项目人员的储备机制为各项目提供人员应急服务",{"key":24,"text":353,"correct":22},"建立项目管理的知识库，为各项目提供知识支持",{"key":27,"text":355,"correct":29},"成立一个监理公司负责对各项目进行监督管理",{"key":31,"text":357,"correct":22},"建立运维运行管理工具平台对运维项目统一管理",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},389351,"（ ）是项目集的决策机构，负责为项目集的管理方式提供支持。",[362,364,366,368],{"key":20,"text":363,"correct":29},"项目集指导委员会",{"key":24,"text":365,"correct":22},"项目治理委员会",{"key":27,"text":367,"correct":22},"项目集变更控制委员会",{"key":31,"text":369,"correct":22},"项目管理办公室",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":31,"analysis":33},389352,"CMMI提供了两种模型表述方式：“连续式”和“阶段式”。以下说法中正确的是（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":22},"前者可以描述项目管理能力成熟度，后者可以描述组织能力成熟度",{"key":24,"text":377,"correct":22},"前者可以描述软件开发能力成熟度，后者可以描述项目管理能力成熟度",{"key":27,"text":379,"correct":22},"前者可以描述项目管理的能力成熟度，后者可以描述组织能力成熟度",{"key":31,"text":381,"correct":29},"前者可以描述过程能力成熟度，后者可以描述组织能力成熟度",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},389353,"在大型复杂IT项目管理中，为了提高项目之间的协作效率，一般建议采用的方法是（ ） 。",[386,388,390,392],{"key":20,"text":387,"correct":29},"建立一个信息共享平台，各项目可以按照不同权限浏览或编辑相应信息",{"key":24,"text":389,"correct":22},"为每个项目建立信息平台，记录自己所起草的各类记录",{"key":27,"text":391,"correct":22},"为每一个项目单独建立一套合适的过程规范",{"key":31,"text":393,"correct":22},"在各个项目之间引入竞争机制",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":27,"analysis":33},389354,"组织级项目管理OPM致力于集成（ ）内容。",[398,400,402,404],{"key":20,"text":399,"correct":22},"能力、组织战略、人、过程",{"key":24,"text":401,"correct":22},"组织战略、人、过程",{"key":27,"text":403,"correct":29},"知识、战略组织、人、过程",{"key":31,"text":405,"correct":22},"知识、组织架构、人、过程",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":24,"analysis":33},389355,"为避免大型项目多个项目之间出现资源冲突，较有效的做法是 （ ） 。",[410,412,414,416],{"key":20,"text":411,"correct":22},"项目开始实施时抢购一空资源在项目之间的分配原则，统一管理所有的项目和资源",{"key":24,"text":413,"correct":29},"定期检查项目的执行情况，根据项目进展情况和整体绩效重新排列项目的优先顺序，从资源上优先支持进展好的项目",{"key":27,"text":415,"correct":22},"将关键的子项目外包，提高项目整体绩效",{"key":31,"text":417,"correct":22},"项目实施初期投入少量资源，随着项目的进展不断增加相关资源",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":31,"analysis":33},389356,"以下关于大型IT项目的叙述中， （ ） 是不正确的。",[422,424,426,428],{"key":20,"text":423,"correct":22},"大型IT项目一般是在需求不十分清晰的情况下开始的，所以通常分解为需求定义和需求实现两个阶段",{"key":24,"text":425,"correct":22},"对大型项目进行需求定义时，往往要求对业务领域有深刻的理解",{"key":27,"text":427,"correct":22},"对大型项目进行需求实现时，往往要求对技术领域的精通",{"key":31,"text":429,"correct":29},"大型IT项目的需求定义和需求实现同通常都是由专业的咨询公司完成的",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":24,"analysis":33},389357,"以下有关大型及复杂项目管理的说法中， （ ） 是错误的。",[434,436,438,440],{"key":20,"text":435,"correct":22},"大型项目经理的日常职责更集中于管理职责",{"key":24,"text":437,"correct":29},"大型项目管理模式接近于直接管理模式",{"key":27,"text":439,"correct":22},"项目周期较长",{"key":31,"text":441,"correct":22},"团队构成较复杂",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},389358,"在大型复杂IT项目管理中，为了提高项目之间的协作效率，通常应首先（）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"确定每个项目经理的目标",{"key":24,"text":449,"correct":29},"建立统一项目过程",{"key":27,"text":451,"correct":22},"为每一个项目单独制定规范",{"key":31,"text":453,"correct":22},"制定合理的沟通计划",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":24,"analysis":33},389359,"一般，项目计划主要关注项目的活动计划，但是对大型复杂项目来说，必须优先考虑制定项目的（ ）。",[458,459,461,462],{"key":20,"text":101,"correct":22},{"key":24,"text":460,"correct":29},"过程计划",{"key":27,"text":295,"correct":22},{"key":31,"text":463,"correct":22},"组织计划",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":27,"analysis":33},389360,"在软件项目开始之前，客户就能对过程能力和风险有了定量的了解的是（ ）。",[468,469,470,471],{"key":20,"text":147,"correct":22},{"key":24,"text":149,"correct":22},{"key":27,"text":151,"correct":29},{"key":31,"text":472,"correct":22},"优化级",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":31,"analysis":33},389361,"关于项目组合和项目集说法不正确的是（ ）",[477,479,481,483],{"key":20,"text":478,"correct":22},"项目组合是由项目、项目集或子项目组合构成， 且组成部分需定期调整。",{"key":24,"text":480,"correct":22},"项目集是由项目或子项目集构成；其组成部分基 本稳定，可做必要调整",{"key":27,"text":482,"correct":22},"项目组合中各项目有优先级排序。",{"key":31,"text":484,"correct":29},"它们都没有明确的结束时间",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":24,"analysis":33},389362,"（ ） 不属于大型项目控制的三要素。",[489,491,493,495],{"key":20,"text":490,"correct":22},"项目绩效跟踪",{"key":24,"text":492,"correct":29},"质量改进",{"key":27,"text":494,"correct":22},"外部变更请求",{"key":31,"text":496,"correct":22},"变更控制",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":31,"analysis":33},389363,"某企业目前有15个运维服务合同正在执行，为提高服务质量和效率，企业采取的正确做法应包括 （ ） 。 ①建立一个服务台统一接受客户的服务请求；②设立一个运维服务部门对15个项目进行统一管理；③建立相同的目标确保各项目都能提供高质量的服务；④建立一套统一的知识库。",[501,503,505,507],{"key":20,"text":502,"correct":22},"①②③",{"key":24,"text":504,"correct":22},"②③④",{"key":27,"text":506,"correct":22},"①③④",{"key":31,"text":508,"correct":29},"①②④",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":24,"analysis":33},389364,"在滚动式计划中，____ 。",[513,515,517,519],{"key":20,"text":514,"correct":22},"关注长期目标，允许短期目标作为持续活动的一部分进行滚动",{"key":24,"text":516,"correct":29},"近期要完成的工作在工作分解结构最下层详细规划",{"key":27,"text":518,"correct":22},"远期要完成的工作在工作分解结构最下层详细规划",{"key":31,"text":520,"correct":22},"为了保证项目里程碑，在战略计划阶段做好一系列详细的活动计划",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":24,"analysis":33},389365,"某企业承担一个大型信息系统集成项目，在项目过程中，为保证项目质量，采取了以下做法，其中 （ ） 是不恰当的。",[525,527,529,531],{"key":20,"text":526,"correct":22},"项目可行性分析、系统规划、需求分析、系统设计、系统测试、系统试运行等阶段均采取了质量保证措施",{"key":24,"text":528,"correct":29},"该项目的项目经理充分重视项目质量，兼任项目QA",{"key":27,"text":530,"correct":22},"该项目的质量管理计划描述了项目的组织结构、职责、程序、工作过程以及建立质量管理所需要的资源",{"key":31,"text":532,"correct":22},"要求所有与项目质量相关的活动都要把质量管理计划作为依据",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":24,"analysis":33},389366,"对大型及复杂项目来说，必须首先考虑项目的 （ ） 计划。",[537,538,539,540],{"key":20,"text":123,"correct":22},{"key":24,"text":125,"correct":29},{"key":27,"text":127,"correct":22},{"key":31,"text":129,"correct":22},{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":24,"analysis":33},389367,"大型项目经理的日常职责集中于管理职责。大型项目经理面临更多的是 （ ） 的挑战。",[545,547,549,551],{"key":20,"text":546,"correct":22},"直接管理",{"key":24,"text":548,"correct":29},"间接管理",{"key":27,"text":550,"correct":22},"直接管理和间接管理",{"key":31,"text":552,"correct":22},"现场管理",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":24,"analysis":33},389368,"与组织在进行单项目管理时所采用的项目管理方法不同，多项目管理有其自身的特点。关于多项目管理环境下的资源平衡技术的理解。 （ ） 是正确的。",[557,559,561,563],{"key":20,"text":558,"correct":22},"多项目管理要求独立考虑单个项目的资源需求，并且考虑多个项目实施期间资金源的可获取性",{"key":24,"text":560,"correct":29},"在多项目管理发生资源冲突时，需要在多个项目之间合理地调动资源，降低资金源冲突程度",{"key":27,"text":562,"correct":22},"首先进行单一项目内的资源平衡，再进行多项目间的资源平衡",{"key":31,"text":564,"correct":22},"在进行项目选择时，主要考虑单个项目的赢利性、技术可行性资源需求",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":27,"analysis":33},389369,"大型复杂项目各子项目由于目标相同而存在，以下关于子项目的描述不恰当的是（ ） 。",[569,571,573,575],{"key":20,"text":570,"correct":22},"需明确各子项目之间相互依赖、相互配合和相互约束的关系",{"key":24,"text":572,"correct":22},"为每一个子项目的绩效测量制订明确的基准",{"key":27,"text":574,"correct":29},"一个子项目的变更不会引起其他子项目范围的巨大的变动",{"key":31,"text":576,"correct":22},"各子项目也应确定明确的范围、质量、进度、成本",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":24,"analysis":33},389370,"下列选项中，有关项目组合和项目组合管理的说法错误的是 （ ） 。",[581,583,585,587],{"key":20,"text":582,"correct":22},"项目组合是项目或大项目和其他工作的一个集合",{"key":24,"text":584,"correct":29},"组合中的项目或大项目应该是相互依赖或相关的",{"key":27,"text":586,"correct":22},"项目组合管理中，资金和支持可以依据风险\u002F回报类别来进行分配",{"key":31,"text":588,"correct":22},"项目组合管理应该定期排除不满足项目组合的战略目标的项目",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":27,"analysis":33},389371,"关于大型IT项目的范围管理，下列做法中，（）是最合适的。",[593,594,595,597],{"key":20,"text":135,"correct":22},{"key":24,"text":137,"correct":22},{"key":27,"text":596,"correct":29},"在需求清晰之后，对项目管理计划进行调整，按照计划进行范围管理",{"key":31,"text":141,"correct":22},{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":31,"analysis":33},389372,"一般来说，多项目管理从项目目标上看项目可能是孤立无关的，但是这些项目都是服务于组织的产品布局和战略规划，项目的协作管理不包括 （ ） 。",[602,604,606,608],{"key":20,"text":603,"correct":22},"共享和协调资源",{"key":24,"text":605,"correct":22},"项目进行集中的配置管理",{"key":27,"text":607,"correct":22},"统一收集和汇总项目信息",{"key":31,"text":609,"correct":29},"与甲方的技术主管部门的沟通",[611,615,618,621,624,627],{"id":612,"name":613,"category":7,"favorite":614},136,"法律职业试卷二(客观题 )",2,{"id":616,"name":617,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":619,"name":620,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":622,"name":623,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":625,"name":626,"category":7,"favorite":8},28,"安全工程师",{"id":628,"name":629,"category":7,"favorite":8},112,"安全生产法律知识"]