[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":618},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,22,50,1856,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,526,538,550,562,574,582,594,606],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},389270,1,"单选题","项目变更是项目管理中的一项重要工作，项目变更控制委员会是______.",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","执行机构",false,{"key":24,"text":25,"correct":22},"B","固定机构",{"key":27,"text":28,"correct":29},"C","决策机构",true,{"key":31,"text":32,"correct":22},"D","管理机构","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},389271,"在项目的实施阶段，当客户明确提出某项需求需要更改时，项目经理应该 （ ） 。",[38,40,42,44],{"key":20,"text":39,"correct":22},"与客户方领导进行沟通，尽量劝说其不要更改需求",{"key":24,"text":41,"correct":29},"先评估变更会对项目带来怎样的影响，然后再与客户商量解决措施",{"key":27,"text":43,"correct":22},"接受客户的变更请求，启动变更控制流程，遵循变更流程进行更改",{"key":31,"text":45,"correct":22},"汇报给高层领导，由领导决定",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},389272,"项目规模小并且与其他项目的关联度小时，变更的提出与处理过程可在操作上力求简便和高效。关于小项目变更，不正确的说法是 （ ） 。",[50,52,54,56],{"key":20,"text":51,"correct":22},"对变更产生的因素施加影响以防止不必要的变更并减少无谓的评估",{"key":24,"text":53,"correct":22},"应明确变更的组织与分工合作",{"key":27,"text":55,"correct":22},"变更流程也要规范化",{"key":31,"text":57,"correct":29},"对变更的申请和确认，既可以是书面的也可以是口头的，以简化程序",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},389273,"项目经理在综合变更中主要负责 （ ） 。",[62,64,66,68],{"key":20,"text":63,"correct":29},"评估变更对项目的影响",{"key":24,"text":65,"correct":22},"评估变更的应对方案",{"key":27,"text":67,"correct":22},"将变更由技术要求转换为资源要求",{"key":31,"text":69,"correct":22},"批准可否使用储备资源",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},389274,"一项新的国家标准出台，某项目经理意识到新标准中的某些规定将导致其目前负责的一个项目必须重新设定一项技术指标，该项目经理首先应该 ：",[74,76,78,80],{"key":20,"text":75,"correct":29},"撰写一份书面的变更请求",{"key":24,"text":77,"correct":22},"召开一次变更控制委员会会议，讨论所面临的问题",{"key":27,"text":79,"correct":22},"通知受到影响的项目干系人将采取新的项目计划",{"key":31,"text":81,"correct":22},"修改项目计划和WBS，以保证该项目产品符合新标准",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},389275,"当 （ ） 时，要正式通过变更审批。",[86,88,90,92],{"key":20,"text":87,"correct":22},"0.7版的项目管理计划调整",{"key":24,"text":89,"correct":22},"某活动在自由时差内的进度调整",{"key":27,"text":91,"correct":29},"某活动负责人要求进度提前",{"key":31,"text":93,"correct":22},"项目经理安排一次临时加班",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},389276,"项目变更是项目管理中的一项重要工作，项目变更控制委员参与变更管理时，一般不进行（ ）工作",[98,100,102,104],{"key":20,"text":99,"correct":29},"变更执行",{"key":24,"text":101,"correct":22},"变更结果确认",{"key":27,"text":103,"correct":22},"变更计划确认",{"key":31,"text":105,"correct":22},"变更方案选择",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},389277,"某公司正在为某省公安部门开发一套边防出入境管理系统，该系统包括15个业务模块，计划开发周期为9个月，即在今年10月底之前交付。开发团队一共有15名工程师。今年7月份，中央政府决定开放某省个人到香港旅游，并在8月15日开始实施。为此客户要求公司在新系统中实现新的业务功能，该功能实现预计有5个模块，并要求在8月15日前交付实施。但公司无法立刻为项目组提供新的人力资源。面对客户的变更需求，以下（）处理方法最合适。",[110,112,114,116],{"key":20,"text":111,"correct":22},"拒绝客户的变更需求，要求签订一个新合同，通过一个新项目来完成",{"key":24,"text":113,"correct":22},"接受客户的变更需求，并争取如期交付，建立公司的声誉",{"key":27,"text":115,"correct":29},"采用多次发布的策略，将20个模块重新排定优先次序，并在8月15日之前发布一个包含到香港旅游业务功能的版本，其余延后交付",{"key":31,"text":117,"correct":22},"在客户同意增加项目预算的条件下，接受客户的变更需求，并如期交付项目成果。",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},389278,"项目的需求文档应精准描述要交付的产品，应能反映出项目的变更。当不得不作出变更时，应该（ ）对被影响的需求文件进行处理。",[122,124,126,128],{"key":20,"text":123,"correct":22},"从关注高层系统需求变更的角度",{"key":24,"text":125,"correct":22},"从关注底层功能需求变更的角度",{"key":27,"text":127,"correct":29},"按照从高层到底层的顺序",{"key":31,"text":129,"correct":22},"按照从底层到高层的顺序",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},389279,"变更管理有两个重要的用途，一是（ ）；二是变更度量分析，帮助组织提升自身的项目管理能力。",[134,136,138,140],{"key":20,"text":135,"correct":22},"分析变更的原因，并管理这些原因",{"key":24,"text":137,"correct":22},"规避风险，确保项目顺利",{"key":27,"text":139,"correct":22},"限制变更，维持项目的计划",{"key":31,"text":141,"correct":29},"控制变更，保证项目可控",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},389280,"下列选项中，属于变更控制委员会主要任务的是 （ ） 。",[146,148,150,152],{"key":20,"text":147,"correct":22},"提出变更申请",{"key":24,"text":149,"correct":22},"评估变更影响",{"key":27,"text":151,"correct":29},"评价、审批变更",{"key":31,"text":153,"correct":22},"实施变更",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},389281,"下图是变更控制管理流程图，该流程图缺失（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"评估影响记录",{"key":24,"text":161,"correct":22},"配置审计",{"key":27,"text":163,"correct":22},"变更定义",{"key":31,"text":165,"correct":29},"记录变更实施情况",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},389282,"在项目中实施变更应以 （ ） 为依据。",[170,172,174,176],{"key":20,"text":171,"correct":22},"项目干系人的要求",{"key":24,"text":173,"correct":22},"项目管理团队的要求",{"key":27,"text":175,"correct":29},"批准的变更请求",{"key":31,"text":177,"correct":22},"公司制度",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},389283,"某公司为多个行业编写客户账目管理软件，张某是该公司的项目经理。现在有一个客户要求进行范围变更， （ ） 不是此变更所关注的。",[182,184,186,188],{"key":20,"text":183,"correct":22},"管理变更",{"key":24,"text":185,"correct":29},"变更筛选",{"key":27,"text":187,"correct":22},"影响导致变更的原因",{"key":31,"text":189,"correct":22},"确定变更已经发生",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},389284,"某系统集成项目的项目经理在制定项目章程时，必须要考虑涉及并影响项目的环境和组织因素（ ）不属于环境和组织因素的内容。",[194,196,198,200],{"key":20,"text":195,"correct":22},"公司文化和结构",{"key":24,"text":197,"correct":22},"员工绩效评估记录",{"key":27,"text":199,"correct":29},"变更控制流程",{"key":31,"text":201,"correct":22},"项目管理信息系统",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},389285,"以下关于企业战略的说法， （ ） 是正确的。",[206,208,210,212],{"key":20,"text":207,"correct":22},"战略可通过分析、选择、评估、匹配四个步骤来制订",{"key":24,"text":209,"correct":22},"战略分析是对企业内外部环境的分析",{"key":27,"text":211,"correct":29},"战略包含三个层次：公司战略、业务战略、职能战略",{"key":31,"text":213,"correct":22},"常见的综合战略只有防御和扩张两张",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},389286,"一个产业的竞争状态取决于五种基本竞争力量：新竞争者的进入、替代品的威胁、买方的讨价还价能力、供应者的讨价还价能力以及（）",[218,220,222,224],{"key":20,"text":219,"correct":22},"买方的意向",{"key":24,"text":221,"correct":22},"宏观经济环境",{"key":27,"text":223,"correct":22},"国家政策",{"key":31,"text":225,"correct":29},"现有竞争者之间的竞争",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},389287,"某公司刚刚发布了新的5年战略计划后，该公司的一个项目经理从一个客户那里收到一个新的产品要求，这个要求与公司过去5年战略计划相一致，但不符合新战略计划的目标。该产品描述具有有效的商业驱动，并有助于直接推动公司发展，作为项目经理，恰当的做法是 （ ） 。",[230,232,234,236],{"key":20,"text":231,"correct":22},"为这个项目做成本\u002F收益分析，然后提交管理层批准",{"key":24,"text":233,"correct":29},"把该产品要求提交给管理层审核和批准",{"key":27,"text":235,"correct":22},"把本公司经营方向的变化通知给客户，并请客户重新审视这个项目",{"key":31,"text":237,"correct":22},"向管理层索要项目章程并开始编制WBS",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},389288,"以下关于企业战略说法中，不正确的是 （ ） 。",[242,244,246,248],{"key":20,"text":243,"correct":22},"为了企业战略的正确实施和执行，需要制订企业战略计划",{"key":24,"text":245,"correct":29},"战略计划适用于稳定的环境和可预期的环境，而长期计划可应对环境的改变",{"key":27,"text":247,"correct":22},"制订企业战略时制订应变计划更有利于企业面对瞬息万变的内外部环境",{"key":31,"text":249,"correct":22},"企业战略的计划的工作方式可以自上而下、自下而上、上下结合或者设立特别小组，依照企业各自的实际情况和条件灵活执行",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":27,"analysis":33},389290,"下列关于企业文化的叙述中，不正确的是（）",[254,256,258,260],{"key":20,"text":255,"correct":22},"反映了企业的内部价值观",{"key":24,"text":257,"correct":22},"反映了企业中人员的态度和做事方式",{"key":27,"text":259,"correct":29},"企业文化总能发挥积极的作用",{"key":31,"text":261,"correct":22},"可以体现在企业战略中",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},389291,"某公司主营业务是开发面向金融行业的企业内部管理信息系统，在全国主要城市市场占有率达到50%以上，有两家实力稍弱的竞争对手。随着国家相关政策的出台，金融行业加强内部监管变得越来越重要。公司的基本情况如下：① 公司财务经营状况较好，近年来营业额和利润率逐年增长，但市场增长的趋势已经开始减缓。② 公司前期注重投资自主研发，科研实力较强，已形成自主研发队伍，能够满足研发要求，但随着行业的发展和企业内部管理信息系统本身科技含量相对有限，较小公司的同质性产品开始进入市场。③ 公司产品市场主要集中在北京和上海等金融业较发达城市，供给大型机构和证劵公司内部管理使用。④ 公司内部管理制度较为完善，但人员流动率较高。假设你是这家IT公司的战略事业部经理，你需要为公司制订未来5年的发展规划。你针对该公司进行了SWOT分析，正确的判断是 （ ） 。",[266,268,270,272],{"key":20,"text":267,"correct":29},"企业研发能力较强，财务经营状况较好，内部管理制度较为完善属于优势",{"key":24,"text":269,"correct":22},"公司产品市场主要集中在北京、上海等金融城市，没有向二线城市扩展，可以看作是威胁",{"key":27,"text":271,"correct":22},"有两家实力稍弱的竞争对手和较小公司的同质性产品开始进入市场都属于威胁",{"key":31,"text":273,"correct":22},"国家相关政策的出台，金融行业加强内部监管变得越来越重要，这说明行业有相关政策利好消息，属于优势",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},389292,"战略管理的主要活动可以分为下列中的（）",[278,280,282,284],{"key":20,"text":279,"correct":22},"战略分析、战略执行、战略评估",{"key":24,"text":281,"correct":29},"战略制定、战略执行、战略评估",{"key":27,"text":283,"correct":22},"战略分析、战略制定、战略执行",{"key":31,"text":285,"correct":22},"战略分析、战略制定、战略评估",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},389293,"如果一个企业经常采用竞争性定价或生产高质量产品来阻止竞争对手的进入，从而保持自己的稳定，它应该属于 （ ） 。",[290,292,294,296],{"key":20,"text":291,"correct":22},"开拓型战略组织",{"key":24,"text":293,"correct":29},"防御型战略组织",{"key":27,"text":295,"correct":22},"分析性战略组织",{"key":31,"text":297,"correct":22},"反应型战略组织",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":27,"analysis":33},389294,"外包模式是近些年来非常重要的管理概念和经营方法，企业将其部分业务或服务进行外包可以为其带来很多利益，以下 （ ） 不属于外包管理可以为企业带来的益处",[302,304,306,308],{"key":20,"text":303,"correct":22},"降低相关业务或生产的成本",{"key":24,"text":305,"correct":22},"使企业可以专注于自己的擅长的领域",{"key":27,"text":307,"correct":29},"提升员工的能力和工作效率",{"key":31,"text":309,"correct":22},"改善服务，提高核心竞争力",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},389295,"正在开发的产品和组织的整体战略之间通过 （ ） 联系在一起。",[314,316,318,320],{"key":20,"text":315,"correct":22},"项目发起人的要求",{"key":24,"text":317,"correct":22},"项目计划",{"key":27,"text":319,"correct":22},"产品质量",{"key":31,"text":321,"correct":29},"产品描述",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},389296,"某公司主营业务是开发面向金融行业的企业内部管理信息系统，在全国主要城市市场占有率达到50%以上，有两家实力稍弱的竞争对手。随着国家相关政策的出台，金融行业加强内部监管变得越来越重要。公司的基本情况如下：① 公司财务经营状况较好，近年来营业额和利润率逐年增长，但市场增长的趋势已经开始减缓。② 公司前期注重投资自主研发，科研实力较强，已形成自主研发队伍，能够满足研发要求，但随着行业的发展和企业内部管理信息系统本身科技含量相对有限，较小公司的同质性产品开始进入市场。③ 公司产品市场主要集中在北京和上海等金融业较发达城市，供给大型机构和证劵公司内部管理使用。④ 公司内部管理制度较为完善，但人员流动率较高。假设你是这家IT公司的战略事业部经理，你需要为公司制订未来5年的发展规划。不考虑其他内外部环境因素，你认为公司在未来5年内面临的最大外部环境问题是 （ ）",[326,328,330,332],{"key":20,"text":327,"correct":29},"市场趋于饱和",{"key":24,"text":329,"correct":22},"竞争对手过于强大",{"key":27,"text":331,"correct":22},"人员流失率较高",{"key":31,"text":333,"correct":22},"行业存在垄断状况",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":27,"analysis":33},389297,"根据企业内外环境的分析，运用SWOT配比技术就可以提出不同的企业战略。S-T战略是 （ ） 。",[338,340,342,344],{"key":20,"text":339,"correct":22},"发挥优势、利用机会",{"key":24,"text":341,"correct":22},"利用机会、克服弱点",{"key":27,"text":343,"correct":29},"利用优势、回避威胁",{"key":31,"text":345,"correct":22},"减小弱点、回避威胁",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":31,"analysis":33},389298,"内部管理信息系统本身科技含量相对有限，较小公司的同质性产品开始进入市场。③ 公司产品市场主要集中在北京和上海等金融业较发达城市，供给大型机构和证劵公司内部管理使用。④ 公司内部管理制度较为完善，但人员流动率较高。假设你是这家IT公司的战略事业部经理，你需要为公司制订未来5年的发展规划。在公司未来5年发展规划中 （ ） 不是优先考虑的战略。",[350,352,354,356],{"key":20,"text":351,"correct":22},"大力开发金融行业应用软件类的高级产品或其他行业的类似产品，更好满足客户需求",{"key":24,"text":353,"correct":22},"完善内部管理机制，重点放在员工稳定和减少流失率上，特别是对于高科技研发人员的流失率需要控制",{"key":27,"text":355,"correct":22},"突出公司在专业上的优势，积极开拓二线城市市场",{"key":31,"text":357,"correct":29},"将研发管理作为根本大事来做，投资建立独立的研发中心，加大研发投资",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":27,"analysis":33},389299,"以下有关行业集中度的说法，错误的是 （ ） 。",[362,364,366,368],{"key":20,"text":363,"correct":22},"计算行业集中度要考虑该行业中企业的销售额、职工人数、资产额等因素",{"key":24,"text":365,"correct":22},"行业集中度较小则表明该行业为竞争型",{"key":27,"text":367,"correct":29},"计算行业集中度要涉及该行业的大多数企业",{"key":31,"text":369,"correct":22},"稳定的集中度曲线表明市场竞争结构相对稳定",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":31,"analysis":33},389300,"流程管理是企业管理的一个重要内容，一般来说流程管理不包括 （ ）",[374,376,378,380],{"key":20,"text":375,"correct":22},"管理流程",{"key":24,"text":377,"correct":22},"操作流程",{"key":27,"text":379,"correct":22},"支持流程",{"key":31,"text":381,"correct":29},"改进流程",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":31,"analysis":33},389301,"___是一种能够实现过程集成的技术，一般用于用户的业务流程经常发生改变的场合。",[386,388,390,392],{"key":20,"text":387,"correct":22},"业务流",{"key":24,"text":389,"correct":22},"控制流",{"key":27,"text":391,"correct":22},"流媒体",{"key":31,"text":393,"correct":29},"工作流",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},389302,"管理信息系统规划的方法有很多，最常使用的方法有三种：关键成功因素法（Critical Success Factors，CS F）、战略目标集转化法（Strategy Set Transformation，SST）和企业系统规划法（Business System Planning，BSP）。U\u002FC（Use\u002FCreate）矩阵法作为系统分析阶段的工具，主要在 （ ） 中使用。",[398,400,402,404],{"key":20,"text":399,"correct":29},"BSP",{"key":24,"text":401,"correct":22},"CSF",{"key":27,"text":403,"correct":22},"SST",{"key":31,"text":405,"correct":22},"CSF和SST",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":27,"analysis":33},389303,"软件过程改进（Software Process Improvement，SPI）是帮助软件企业对其软件（制作）过程的改变（进）进行计划、实施的过程，根据相关标准，软件过程改进一般从 （ ） 开始。",[410,412,414,416],{"key":20,"text":411,"correct":22},"计划变更",{"key":24,"text":413,"correct":22},"领导建议",{"key":27,"text":415,"correct":29},"问题分析",{"key":31,"text":417,"correct":22},"知识创新",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":31,"analysis":33},389304,"企业为显著提高产品质量、工作效率和服务能力，并显著控制成本，对当前业务流程进行破坏性地重新设计称为业务流程重组（BPR）。下列 （ ） 原则可以有效指导BPR项目实施。",[422,424,426,428],{"key":20,"text":423,"correct":22},"尽量要那些提供流程输入的人来执行流程操作",{"key":24,"text":425,"correct":22},"将决策点放到基层活动中，减少对流程的控制",{"key":27,"text":427,"correct":22},"对地理上集中的资源看作是分散地来处理",{"key":31,"text":429,"correct":29},"组织机构设计要围绕企业的产出，而不是一项一项的任务",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":20,"analysis":33},389305,"以下关于业务流程管理（BPM）的叙述中不正确的是（ ） 。",[434,436,438,440],{"key":20,"text":435,"correct":29},"良好的业务流程管理的步骤包括流程设计、流程执行、流程评估，流程执行是其中最重要的一个环节",{"key":24,"text":437,"correct":22},"业务流程设计要关注内部顾客、外部顾客和业务的需求",{"key":27,"text":439,"correct":22},"业务流程执行关注的是执行的效率和效果",{"key":31,"text":441,"correct":22},"良好的业务流程评估的基础是建立有效、公开、公认和公平的评估标准、评估指标和评估方法",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":31,"analysis":33},389306,"在实施企业业务流程改造的过程中，许多企业领导人和员工在变革之初对变革抱有很大期望和热情，但在变革实施以后发现似乎一切又恢复了老样子，其遗憾的原因往往在于变革的设计者和领导者未能在变革中坚持企业流程改造的核心原则，即____ 。",[446,448,450,452],{"key":20,"text":447,"correct":22},"以流程为中心的原则",{"key":24,"text":449,"correct":22},"以人为本的团队式管理原则",{"key":27,"text":451,"correct":22},"顾客导向原则",{"key":31,"text":453,"correct":29},"以上都是",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":27,"analysis":33},389307,"业务流程重组的实施步骤包括：项目的启动，拟定变革计划，建立项目团队，重新设计（）并实施，持续改进，重新开始。",[458,460,462,464],{"key":20,"text":459,"correct":22},"已有流程",{"key":24,"text":461,"correct":22},"系统架构",{"key":27,"text":463,"correct":29},"目标流程",{"key":31,"text":465,"correct":22},"企业架构",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":31,"analysis":33},389308,"在软件开发中采用工作流技术可以 （ ） 。①降低开发风险 ②提高工作效率 ③提高对流程的控制与管理④提升开发过程的灵活性 ⑤提高对客户响应的预见性",[470,472,474,476],{"key":20,"text":471,"correct":22},"①③④⑤",{"key":24,"text":473,"correct":22},"①②④⑤",{"key":27,"text":475,"correct":22},"①②③④",{"key":31,"text":477,"correct":29},"①②③⑤",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":27,"analysis":33},389309,"对 ERP项目最准确的定位是（）",[482,484,486,488],{"key":20,"text":483,"correct":22},"信息系统集成项",{"key":24,"text":485,"correct":22},"技术改造项目",{"key":27,"text":487,"correct":29},"管理变革项",{"key":31,"text":489,"correct":22},"作业流实施项目",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":27,"analysis":33},389310,"在企业业务流程管理和重组过程中，及时和有效的评估是企业重要的学习途径。良好评估的基础是必须建立有效、公开、公认和公平的评估标准、评估指标和评估方法。评估标准和指标来源于公司的业务目标和流程要求，评估的方法主要关注 （ ） 。",[494,496,498,500],{"key":20,"text":495,"correct":22},"业务流程的遵循性评估、有效性评估和公平性评估",{"key":24,"text":497,"correct":22},"业务流程的遵循性评估、公平性评估和绩效评估",{"key":27,"text":499,"correct":29},"业务流程的遵循性评估，有效性评估和绩效评估",{"key":31,"text":501,"correct":22},"业务流程的可靠性评估，有效性评估和绩效评估",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":31,"analysis":33},389311,"BPR理论以“流程”为变革的核心线索，把跨职能的企业业务流程作为基本工作单元，多层BPR实施体系分为观念重建层、 （ ） 三层。",[506,508,510,512],{"key":20,"text":507,"correct":22},"制度重建层和组织重建层",{"key":24,"text":509,"correct":22},"制度重建层和业务重建层",{"key":27,"text":511,"correct":22},"流程重建层和业务重建层",{"key":31,"text":513,"correct":29},"流程重建层和组织重建层",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":24,"analysis":33},389312,"为保证成功实施BPR项目，下列说法正确的是 （ ） 。",[518,520,522,524],{"key":20,"text":519,"correct":22},"企业人员不一定参与到重组的具体工作中",{"key":24,"text":521,"correct":29},"要保证BPR项目在启动时就建立起有效的领导机制",{"key":27,"text":523,"correct":22},"只需要重要的企业员工对BPR项目的理解和参与",{"key":31,"text":525,"correct":22},"对无法衡量的部分，BPR实施中尽量包括进来",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":24,"analysis":33},389313,"基于业务流程重组的信息系统规划主要步骤是 （ ） 。",[530,532,534,536],{"key":20,"text":531,"correct":22},"系统战略规划阶段、系统流程规划阶段、系统功能规划阶段和系统实施阶段",{"key":24,"text":533,"correct":29},"系统战略规划阶段、系统流程规划阶段、系统数据规划阶段、系统功能规划阶段和系统实施阶段",{"key":27,"text":535,"correct":22},"系统战略规划阶段、系统流程规划阶段、系统数据规划阶段和系统实施阶段",{"key":31,"text":537,"correct":22},"系统战略规划阶段、系统流程规划阶段、系统方案规划阶段、系统功能规划阶段和系统实施阶段",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},389314,"业务流程管理信息化是将生产流程、业务流程、各类行政审批流程、认识处理流程、财务管理流程等需要多人协作实施的任务，全部或部分交由计算机处理的过程，对于企业来说，一般讲业务流程分为四个层次，其中资源能力计划和相关预算属于 （ ） 层次。",[542,544,546,548],{"key":20,"text":543,"correct":22},"战略",{"key":24,"text":545,"correct":29},"计划",{"key":27,"text":547,"correct":22},"运作",{"key":31,"text":549,"correct":22},"生产流程",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":27,"analysis":33},389315,"某系统集成企业进行业务流程重组，在实施的过程中企业发生了多方面、多层次的变化，假定该企业的实施是成功的，则（）不应该是实施所带来的变化。",[554,556,558,560],{"key":20,"text":555,"correct":22},"企业文化的变化",{"key":24,"text":557,"correct":22},"服务质量的变化",{"key":27,"text":559,"correct":29},"业务方向的变化",{"key":31,"text":561,"correct":22},"组织管理的变化",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":27,"analysis":33},389316,"在进行业务流程改进时，通过对作业成本的确认和计量，消除“不增值作业”、改进“可增值作业”，将企业的损失、浪费减少到最低限度，从而促进企业管理水平提高的方法是（ ） 。",[566,568,570,572],{"key":20,"text":567,"correct":22},"矩阵图法",{"key":24,"text":569,"correct":22},"蒙特卡罗法",{"key":27,"text":571,"correct":29},"ABC法",{"key":31,"text":573,"correct":22},"帕累托法",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":27,"analysis":33},389317,"某系统集成企业进行业务流程重组，在实施的过程中企业发生了多方面、多层次的变化，假定该企业的实施是成功的，则 （ ） 不应是该实施所带来的变化。",[578,579,580,581],{"key":20,"text":555,"correct":22},{"key":24,"text":557,"correct":22},{"key":27,"text":559,"correct":29},{"key":31,"text":561,"correct":22},{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":20,"analysis":33},389318,"绘制数据流图是软件设计过程的一部分，用以表明信息在系统中的流向。数据流图的基本组成部分包括（ ） 。",[586,588,590,592],{"key":20,"text":587,"correct":29},"数据流、加工、数据存储和外部实体",{"key":24,"text":589,"correct":22},"数据流的源点和终点、数据存储、数据文件和外部实体",{"key":27,"text":591,"correct":22},"数据的源点和终点、加工、数据和数据流文件",{"key":31,"text":593,"correct":22},"数据、加工和数据存储",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":24,"analysis":33},389319,"经济计量分析的工作程序依次是 （ ） 。",[598,600,602,604],{"key":20,"text":599,"correct":22},"设定模型、检验模型、估计模型、改进模型",{"key":24,"text":601,"correct":29},"设定模型、估计参数、检验模型、应用模型",{"key":27,"text":603,"correct":22},"估计模型、应用模型、检验模型、改进模型",{"key":31,"text":605,"correct":22},"搜集资料、设定模型、估计参数、应用模型",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":20,"analysis":33},389320,"某系统集成企业为提升企业竞争能力，改进管理模式，使业务流程合理化实施了（），对业务流程进行了重新设计，使企业在成本、质量和服务质量等方面得到了提高。",[610,612,614,616],{"key":20,"text":611,"correct":29},"BPR",{"key":24,"text":613,"correct":22},"CCB",{"key":27,"text":615,"correct":22},"ARIS",{"key":31,"text":617,"correct":22},"BPM",[619,623,626,629,632,635],{"id":620,"name":621,"category":7,"favorite":622},136,"法律职业试卷二(客观题 )",2,{"id":624,"name":625,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":627,"name":628,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":630,"name":631,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":633,"name":634,"category":7,"favorite":8},28,"安全工程师",{"id":636,"name":637,"category":7,"favorite":8},112,"安全生产法律知识"]