[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-21":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":592},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,21,50,1856,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,213,225,237,245,257,265,273,285,297,305,317,329,341,353,365,374,386,398,410,422,434,446,458,470,482,494,502,514,526,538,550,560,572,580],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},389220,1,"单选题","在软件配置管理中，版本控制的目的是按照一定的规则保存配置项的 （ ） 。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","重要版本",false,{"key":24,"text":25,"correct":22},"B","基线版本",{"key":27,"text":28,"correct":29},"C","所有版本",true,{"key":31,"text":32,"correct":22},"D","需要得版本","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},389221,"某软件开发组针对两个相关联但工作环境可能有些差异的系统1（对应&ldquo;用户1&rdquo;）和系统2（对应&ldquo;用户2&rdquo;）进行配置管理。产品设计阶段的内部设计模块对应如下：用户1：采用 A、 B、 C、 D、E和F模块用户2：采用 A、 B、 C、 D、 E、G和H模块根据配置管理要求，以下做法正确的是 （ ） 。",[38,40,42,44],{"key":20,"text":39,"correct":22},"A. 在设计阶段用户1和用户2对应的相同模块的配置项可以合并为一个配置项",{"key":24,"text":41,"correct":22},"B. 在设计阶段只需分别建立模块H的配置项，形成不同的基线",{"key":27,"text":43,"correct":29},"在设计阶段就要对两个用户所要求的所有模块分别建立配置项并形成基线",{"key":31,"text":45,"correct":22},"在后续开发阶段两个用户所要求的所有模块都要作为不同的分配置进行管理",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},389222,"在配置管理中，基线是一组经过审查并且达成一致的规范或工作产品，是开发工作的基础。配置管理员根据《项目计划文档》、《配置管理计划》、《配置项管理表》等文档，创建 （ ） 基线。",[50,52,54,56],{"key":20,"text":51,"correct":22},"内部或外部",{"key":24,"text":53,"correct":22},"设计或构造",{"key":27,"text":55,"correct":22},"计划或发行",{"key":31,"text":57,"correct":29},"构造或发行",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},389223,"某软件企业为规范配置管理活动，确保项目配置管理的有效性，避免出现混乱现象，对配置管理库状况进行审计，确定配置库中的配置项和建立的基线的正确性、完整性，并且记录审计结果。该企业的配置审计内容应包括 （ ） 。 ①评估基线的完整性 ②检查配置记录是否正确反映了配置项的配置情况③审查配置项的结构完整性 ④对配置项进行技术评审⑤验证配置项的完备性和正确性 ⑥验证是否符合配置管理标准和规程⑦对审计后提出的各项行动进行跟踪，直到结束",[62,64,66,68],{"key":20,"text":63,"correct":29},"①②③④⑤⑥",{"key":24,"text":65,"correct":22},"①③⑤⑥⑦",{"key":27,"text":67,"correct":22},"②④⑤⑥⑦",{"key":31,"text":69,"correct":22},"①②③④⑦",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},389224,"配置识别是软件项目管理中的一项重要工作，它的工作内容不包括 （ ） 。",[74,76,78,80],{"key":20,"text":75,"correct":22},"确定需要纳入配置管理的配置项",{"key":24,"text":77,"correct":22},"确定配置项的获取时间和所有者",{"key":27,"text":79,"correct":22},"为识别的配置项分配唯一的标识",{"key":31,"text":81,"correct":29},"对识别的配置项进行审计",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},389225,"（ ） 不是创建基线或发行基线的主要步骤。",[86,88,90,92],{"key":20,"text":87,"correct":22},"获得CCB的授权",{"key":24,"text":89,"correct":22},"确定基线配置项",{"key":27,"text":91,"correct":22},"形成文件",{"key":31,"text":93,"correct":29},"建立配置管理系统",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},389226,"下面任务中， （ ） 不是在配置管理工程中执行的内容。",[98,100,102,104],{"key":20,"text":99,"correct":22},"确认一个条目或一个系统的功能和物理特征",{"key":24,"text":101,"correct":22},"针对特征控制变更",{"key":27,"text":103,"correct":22},"对项目范围进行审核以检验当前的项目范围是否与预定的要求相符",{"key":31,"text":105,"correct":29},"允许对变更自动承认",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},389227,"程序员小张在某项目中编写了源代码文件X的0.1版（以下简称Xv0.1）。随后的开发中小张又修改了Xv0.1，得到文件X的1.0版（以下简称Xv1.0）。经过正式评审后，Xv1.0被纳入基线进行配置管理。下列后续活动中符合配置管理要求的是 （ ） 。",[110,112,114,116],{"key":20,"text":111,"correct":22},"文件Xv1.0进入基线后，配置管理员小李从配置库中删除了文件Xv0.1",{"key":24,"text":113,"correct":29},"程序员小张被赋予相应的权限，可以直接读取受控库中的文件Xv1.0",{"key":27,"text":115,"correct":22},"小张直接对Xv1.0进行了变更，之后通知了项目经理",{"key":31,"text":117,"correct":22},"经过变更申请、变更评估并决定实施变更后，变更实施人完成了变更，随后立即发布了变更，在第一时间内将变更内容和结果通知所有相关人员",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},389228,"以下关于软件版本控制的叙述中，正确的是：（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"软件开发人员对源文件的修改在配置库中进行",{"key":24,"text":125,"correct":29},"受控库用于管理当前基线和控制对基线的变更",{"key":27,"text":127,"correct":22},"版本管理与发布由CCB执行",{"key":31,"text":129,"correct":22},"软件版本升级后，新基线存入产品库且版本号更新，旧版本可删除",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},389229,"配置项的状态有三种：草稿、正式发布和正在修改。以下叙述中，不正确的是（ ） 。",[134,136,138,140],{"key":20,"text":135,"correct":22},"配置项刚建立时状态为“草稿”，通过评审后，状态变为“正式发布”",{"key":24,"text":137,"correct":22},"配置项的状态变为“正式发布”后，若需要修改必须依照变更控制流程进行",{"key":27,"text":139,"correct":22},"已发布的配置项通过了伽的审批同意更改，此时其状态变为“正在修改”",{"key":31,"text":141,"correct":29},"通过了变更控制流程审批的配置项，修改完成后即可发布，其状态再次变为“正式发布”",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},389230,"在这个状态变化过程中，图中的（1）、（2）、（3）三个状态依次为 （ ） 。",[146,148,150,152],{"key":20,"text":147,"correct":22},"工作状态、受控状态、评审状态",{"key":24,"text":149,"correct":22},"评审状态、工作状态、受控状态",{"key":27,"text":151,"correct":29},"工作状态、评审状态、受控状态",{"key":31,"text":153,"correct":22},"受控状态、评审状态、工作状态",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},389231,"在软件质量模型中，比较有代表性的有McCall提出的软件质量模型。在这个质量模型中，软件的质量特性被分成了三组，即产品转移、产品修改和____。",[158,160,162,164],{"key":20,"text":159,"correct":22},"产品开发",{"key":24,"text":161,"correct":22},"产品销售",{"key":27,"text":163,"correct":22},"产品升级",{"key":31,"text":165,"correct":29},"产品运行",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},389232,"实施软件配置管理包括4个最基本活动，其中不包括 （ ） 。",[170,172,174,176],{"key":20,"text":171,"correct":22},"配置项标识",{"key":24,"text":173,"correct":29},"配置项优化",{"key":27,"text":175,"correct":22},"配置状态报告",{"key":31,"text":177,"correct":22},"配置审计",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},389233,"通过建设学习型组织使员工顺利地进行知识交流，是知识学习与共享的有效方法。以下关于学习型组织的描述，正确的包括（）。①学习型组织有利于集中组织资源完成知识的商品化②学习型组织有利于开发组织员工的团队合作精神③建设金字塔型的组织结构有利于构建学习型组织④学习型组织的松散管理弱化了对环境的适应能力⑤学习型组织有利于开发组织的知识更新和深化",[182,184,186,188],{"key":20,"text":183,"correct":22},"①②③",{"key":24,"text":185,"correct":29},"①②⑤",{"key":27,"text":187,"correct":22},"②③④",{"key":31,"text":189,"correct":22},"③④⑤",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},389234,"把产品技能和知识带到项目团队的恰当方式是 （ ） 。",[194,196,198,200],{"key":20,"text":195,"correct":22},"让项目经理去学校学习三年，获得一个项目管理硕士学位，这样就能保证他学到项目管理的所有知识",{"key":24,"text":197,"correct":22},"找一个项目团队，其成员具备的知识与技能能够满足项目的需要",{"key":27,"text":199,"correct":22},"让项目团队在项目的实际工作中实习",{"key":31,"text":201,"correct":29},"找到可以获得必要的技能和知识的来源",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},389235,"下面关于知识管理的叙述中，正确的包括（）① 扁平化组织结构设计有利于知识在组织内部的交流 ② 实用新型专利权、外观设计专利权的期限为20年③ 按照一定方式建立显性知识索引库，可以方便组织内部知识分享④ 对知识产权的保护，要求同一智力成果在所有缔约国（或地区）内所获得的法律保护是一致的",[206,208,210,211],{"key":20,"text":207,"correct":29},"①③",{"key":24,"text":209,"correct":22},"①③④",{"key":27,"text":187,"correct":22},{"key":31,"text":212,"correct":22},"②④",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":27,"analysis":33},389236,"以下关于本次课程，下列说法正确的是（）",[217,219,221,223],{"key":20,"text":218,"correct":22},"系统集成项目管理工程师考试是软考的高级资格",{"key":24,"text":220,"correct":22},"系统集成资质目前由工信部进行评审和批准",{"key":27,"text":222,"correct":29},"本课程的主讲老师为薛大龙博士",{"key":31,"text":224,"correct":22},"该考试为全国统考，100分满分，60分及格",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":31,"analysis":33},389237,"下列措施中不利于企业构建知识管理制度平台的是（ ） 。",[229,231,233,235],{"key":20,"text":230,"correct":22},"建立知识库",{"key":24,"text":232,"correct":22},"要求员工按组织规定参与知识管理",{"key":27,"text":234,"correct":22},"用经济利益手段驱动员工参与知识管理",{"key":31,"text":236,"correct":29},"建立金字塔型组织结构",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":31,"analysis":33},389238,"下列措施中不利于企业构建知识管理制度平台的是 （ ） 。",[241,242,243,244],{"key":20,"text":230,"correct":22},{"key":24,"text":232,"correct":22},{"key":27,"text":234,"correct":22},{"key":31,"text":236,"correct":29},{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":20,"analysis":33},389239,"现代企业信息系统的一个明显特点是，企业从依靠信息进行管理向 （ ） 转化。",[249,251,253,255],{"key":20,"text":250,"correct":29},"知识管理",{"key":24,"text":252,"correct":22},"管理信息",{"key":27,"text":254,"correct":22},"管理数据",{"key":31,"text":256,"correct":22},"决策管理",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":24,"analysis":33},389240,"通过建设学习型组织使员工顺利地进行知识交流，是知识学习与共享的有效方法。以下关于学习型组织的描述，正确的包括 （ ） 。①学习型组织有利于集中组织资源完成知识的商品化②学习型组织有利于开发组织员工的团队合作精神③建设金字塔型的组织结构有利于构建学习型组织④学习型组织的松散管理弱化了对环境的适应能力⑤学习型组织有利于开发组织的知识更新和深化",[261,262,263,264],{"key":20,"text":183,"correct":22},{"key":24,"text":185,"correct":29},{"key":27,"text":187,"correct":22},{"key":31,"text":189,"correct":22},{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":20,"analysis":33},389241,"下面关于知识管理的叙述中，正确的包括 （ ） 。①扁平化组织结构设计有利于知识在组织内部的交流②实用新型专利权、外观设计专利权的期限为20年③按照一定方式建立显性知识索引库，可以方便组织内部知识分享④对知识产权的保护，要求同一智力成果在所有缔约国（或地区）内所获得的法律保护是一致的",[269,270,271,272],{"key":20,"text":207,"correct":29},{"key":24,"text":209,"correct":22},{"key":27,"text":187,"correct":22},{"key":31,"text":212,"correct":22},{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":31,"analysis":33},389242,"下列关于知识管理的叙述，不确切的是（） 。",[277,279,281,283],{"key":20,"text":278,"correct":22},"知识管理为企业实现显性知识和隐性知识共享提供新的途径",{"key":24,"text":280,"correct":22},"知识地图是一种知识导航系统，显示不同的知识存储之间重要的动态联系",{"key":27,"text":282,"correct":22},"知识管理包括建立知识库；促进员工的知识交流；建立尊重知识的内部环境；把知识作为资产来管理",{"key":31,"text":284,"correct":29},"知识管理属于人力资源管理的范畴",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":27,"analysis":33},389243,"配置项版本控制过程的步骤是（ ） 。①技术评审或领导审批②正式发布③修改处于“草稿”状态的配置项④创建配置项",[289,291,293,295],{"key":20,"text":290,"correct":22},"①④③②",{"key":24,"text":292,"correct":22},"③②①④",{"key":27,"text":294,"correct":29},"④③①②",{"key":31,"text":296,"correct":22},"④③②①",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":24,"analysis":33},389244,"实施软件配置管理包括4个最基本的活动，其中不包括（ ） 。",[301,302,303,304],{"key":20,"text":171,"correct":22},{"key":24,"text":173,"correct":29},{"key":27,"text":175,"correct":22},{"key":31,"text":177,"correct":22},{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":24,"analysis":33},389245,"进行配置管理的第一步是（）。",[309,311,313,315],{"key":20,"text":310,"correct":22},"制定识别配置项的准则",{"key":24,"text":312,"correct":29},"建立并维护配置管理的组织方针",{"key":27,"text":314,"correct":22},"制定配置项管理表",{"key":31,"text":316,"correct":22},"建立CCB",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":27,"analysis":33},389246,"某软件开发项目计划设置如下基线：需求基线、设计基线、产品基线。在编码阶段，详细设计文件需要变更，以下叙述中， （ ） 是正确的。",[321,323,325,327],{"key":20,"text":322,"correct":22},"设计文件评审已通过，直接变更即可",{"key":24,"text":324,"correct":22},"设计基线已经建立，不允许变更",{"key":27,"text":326,"correct":29},"设计基线已经建立，若变更必须走变更控制流程",{"key":31,"text":328,"correct":22},"详细设计与设计基线无关，直接变更即可",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":20,"analysis":33},389247,"下列针对某文档处理软件的说明中，不适宜作为需求描述的是 （ ） 。",[333,335,337,339],{"key":20,"text":334,"correct":29},"采用基于字符串匹配的快速分词方法",{"key":24,"text":336,"correct":22},"找出文档的拼写错误并提供替换项列表来替换拼错的词",{"key":27,"text":338,"correct":22},"找到错词并予以高亮度提示，显示提供替换词的对话框",{"key":31,"text":340,"correct":22},"用户应能有效地纠正文档中的拼写错误",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":27,"analysis":33},389248,"在项目配置项中有基线配置项和非基线配置项，（ ）一般属于非基线配置项。",[345,347,349,351],{"key":20,"text":346,"correct":22},"详细设计",{"key":24,"text":348,"correct":22},"概要设计",{"key":27,"text":350,"correct":29},"进度计划",{"key":31,"text":352,"correct":22},"源代码",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":20,"analysis":33},389249,"配置审计包括物理审计和功能审计， （ ） 属于功能审计的范畴。",[357,359,361,363],{"key":20,"text":358,"correct":29},"代码走查",{"key":24,"text":360,"correct":22},"变更过程的规范性审核",{"key":27,"text":362,"correct":22},"介质齐备性检查",{"key":31,"text":364,"correct":22},"配置项齐全性审核",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":27,"analysis":33},389250,"以下关于本次课程，下列说法正确的是（）。",[369,371,372,373],{"key":20,"text":370,"correct":22},"信息系统项目管理师考试是软考的高级资格，考过后即拿到正高级",{"key":24,"text":220,"correct":22},{"key":27,"text":222,"correct":29},{"key":31,"text":224,"correct":22},{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":20,"analysis":33},389251,"项目组的测试人员在软件系统测试时发现了一个重大缺陷并报告给了项目经理，项目经理接下来应该（ ）",[378,380,382,384],{"key":20,"text":379,"correct":29},"提交一个变更申请",{"key":24,"text":381,"correct":22},"和质量保证人员商量如何修改",{"key":27,"text":383,"correct":22},"将任务分配给开发人员小王修改",{"key":31,"text":385,"correct":22},"评估是否需要修改",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":27,"analysis":33},389252,"项目进行过程中，客户要求进度提前，围绕整体变更管理，项目经理以下做法，正确的是 （ ） 。",[390,392,394,396],{"key":20,"text":391,"correct":22},"进度变更和整体变更应一步到位，不要反复迭代",{"key":24,"text":393,"correct":22},"进度变更对成本、人力资源的影响，可在变更实施时再进行评价",{"key":27,"text":395,"correct":29},"先要求提出变更申请，走进度变更流程，然后根据变更后的新基线再进行相关的成本、人力资源等的变更",{"key":31,"text":397,"correct":22},"只要变更内容正确，即可执行变更",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":31,"analysis":33},389253,"以下关于变更控制委员会（CC B）的描述错误的是 （ ） 。",[402,404,406,408],{"key":20,"text":403,"correct":22},"CCB也称为配置控制委员会，是配置项变更的监管组织。",{"key":24,"text":405,"correct":22},"CCB任务是对建议的配置项变更作出评价、审批以及监督已批准变更的实施",{"key":27,"text":407,"correct":22},"CCB组织可以只有一个人",{"key":31,"text":409,"correct":29},"对于所有项目，CCB包括的人员一定要面面俱到，应涵盖变更涉及的所有团体，才能保证其管理的有效性",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":31,"analysis":33},389254,"某项目已制定了详细的范围说明书，并完成了WBS 分解。在项目执行过程中，项目经理在进行下一周工作安排的时候，发现 WBS 中遗漏了一项重要的工作，那么接下来他应该首先 （ ） 。",[414,416,418,420],{"key":20,"text":415,"correct":22},"组织项目组讨论，修改WBS",{"key":24,"text":417,"correct":22},"修改项目管理计划，并重新评审",{"key":27,"text":419,"correct":22},"汇报给客户，与其沟通，重新编写项目文档",{"key":31,"text":421,"correct":29},"填写项目变更申请，对产生的工作量进行估算，等待变更委员会审批",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":20,"analysis":33},389255,"在项目管理领域，经常把不受控制的变更称为项目“范围蔓延”。为了防止出现这种现象，需要控制变更。批准或拒绝变更申请的直接组织称为①，定义范围变更的流程包括必要的书面文件②和授权变更的批准等级；则正确的是 （ ）。",[426,428,430,432],{"key":20,"text":427,"correct":29},"①变更控制委员会；②纠正行动、跟踪系统",{"key":24,"text":429,"correct":22},"①项目管理办公室；②偏差分析、配置管理",{"key":27,"text":431,"correct":22},"①变更控制委员会；②偏差分析、变更管理计划",{"key":31,"text":433,"correct":22},"①项目管理办公室；②纠正行动、配置管理",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":31,"analysis":33},389256,"项目变更贯穿于整个项目过程的始终，项目经理应让项目干系人（特别是业主）认识到：",[438,440,442,444],{"key":20,"text":439,"correct":22},"在项目策划阶段，变更成本较高",{"key":24,"text":441,"correct":22},"在项目执行阶段，变更成本较低",{"key":27,"text":443,"correct":22},"在项目编码开始前，变更成本较低",{"key":31,"text":445,"correct":29},"在项目策划阶段，变更成本较低",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":27,"analysis":33},389257,"某项目在执行过程中，软件的需求基线已经确定后，客户需要增加新的功能，但该需求变更会对已经完成系统的稳定性有较大影响。作为项目负责人处理这些需求变更，下列（ ） 做法是不合适的。",[450,452,454,456],{"key":20,"text":451,"correct":22},"利用原型法给用户提供预览，以帮助准确把握用户的真实需求",{"key":24,"text":453,"correct":22},"可以跟客户说不，并与其商议在后续项目或下一版本中满足他们的要求",{"key":27,"text":455,"correct":29},"秉承“客户至上”的原则，召集有关人员开始变更工作，满足客户的要求",{"key":31,"text":457,"correct":22},"利用在项目初期文档化的视图、范围、限制，与变更项比较，决定是否采用此项变更",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":27,"analysis":33},389258,"某电子政务信息化建设项目的项目经理得知一项新的政府管理方面的要求将会引起该项目范围的变更，为此，项目经理应该首先 （ ） 。",[462,464,466,468],{"key":20,"text":463,"correct":22},"召集一次变更控制委员会会议",{"key":24,"text":465,"correct":22},"改变工作分解包，项目时间表和项目计划以反映该管理要求",{"key":27,"text":467,"correct":29},"准备变更请求",{"key":31,"text":469,"correct":22},"制订新的项目计划并通知项目干系人",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":27,"analysis":33},389259,"小王是某软件开发公司负责某项目的项目经理，该项目已经完成了前期的工作进入实现阶段，但用户提出要增加一项新的功能，小王应该 （ ）",[474,476,478,480],{"key":20,"text":475,"correct":22},"立即实现该变更",{"key":24,"text":477,"correct":22},"拒绝该变更",{"key":27,"text":479,"correct":29},"通过变更控制过程管理该变更",{"key":31,"text":481,"correct":22},"要求客户与公司领导协商",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":27,"analysis":33},389260,"某大型项目的变更策略规定：把变更分为重大、紧急、一般和标准变更，并规定了不同级别的审批权限，比如重大变更由CCB审批，并规定标准变更属于预授权变更，可不用再走审批流程。此项目变更策略 （ ） 。",[486,488,490,492],{"key":20,"text":487,"correct":22},"可行",{"key":24,"text":489,"correct":22},"不可行，主要是变更不能分级别，应统一管理",{"key":27,"text":491,"correct":29},"不可行，分四级可以，但审批都应由CCB批准",{"key":31,"text":493,"correct":22},"不可行，标准变更规定有问题",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":27,"analysis":33},389261,"某项目在执行过程中，软件的需求基线已经确定后，客户需要增加新的功能，但该需求变更会对已经完成系统的稳定性有较大影响。作为项目负责人处理这些需求变更，下列 （ ） 做法是不合适的。",[498,499,500,501],{"key":20,"text":451,"correct":22},{"key":24,"text":453,"correct":22},{"key":27,"text":455,"correct":29},{"key":31,"text":457,"correct":22},{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":31,"analysis":33},389262,"某系统集成公司的变更管理程序中有如下规定：“变更控制委员会由公司管理人员、甲方主管、项目经理、关键开发人员、关键测试人员、质量保证代表和配置管理代表组成。变更控制委员会的职责为：批准基线的建立和配置项的确定；代表项目经理和所有可能因基线变更而受到影响的团体利益；审批对基线的变更；批准基线库产品的建立。”下面说法中正确的是 （ ） 。",[506,508,510,512],{"key":20,"text":507,"correct":22},"质量保证代表应负责独立监督项目的质量过程，不应加入变更控制委员会",{"key":24,"text":509,"correct":22},"变更应由项目组以外的组织负责审批，项目经理、开发人员和测试人员不应加入变更控制委员会",{"key":27,"text":511,"correct":22},"变更控制委员会只应代表公司领导和项目经理的利益，不应代表所有可能因基线变更而受到影响的团体利益",{"key":31,"text":513,"correct":29},"该公司的上述规定是根据公司的实际情况制订的，可以有效运转",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":31,"analysis":33},389263,"通常，项目整体变更管理过程涉及到负责批准或拒绝变更请求的变更控制委员会，下列关于变更控制委员会的描述中，错误的是 （ ） 。",[518,520,522,524],{"key":20,"text":519,"correct":22},"在一些大的复杂的项目中，可能会有多个变更控制委员会，他们负有不同的职责",{"key":24,"text":521,"correct":22},"变更控制委员会的角色和职责应在变更控制和配置控制过程中予以明确定义",{"key":27,"text":523,"correct":22},"变更控制委员会的角色和职责应取得所有关键项目干系人的认可",{"key":31,"text":525,"correct":29},"变更控制委员会更新项目计划、任务清单和时间表，以反映变更对已做或正在做工作的影响",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":20,"analysis":33},389264,"变更管理首要完成的任务是 （ ） 。",[530,532,534,536],{"key":20,"text":531,"correct":29},"分析变更的必要性和合理性，确定是否实施变更",{"key":24,"text":533,"correct":22},"记录变更信息，填写变更控制单",{"key":27,"text":535,"correct":22},"做出变更，并交上级审批",{"key":31,"text":537,"correct":22},"修改相应的软件配置项（基线），确立新的版本",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":31,"analysis":33},389265,"一般来说变更控制流程的作用不包括____ 。",[542,544,546,548],{"key":20,"text":543,"correct":22},"列出要求变更的手续",{"key":24,"text":545,"correct":22},"记录要求变更的事项",{"key":27,"text":547,"correct":22},"描述管理层对变更的影响",{"key":31,"text":549,"correct":29},"确定要批准还是否决变更请求",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":27,"analysis":33},389266,"李先生是某软件开发公司负责项目的项目经理，该项目已经完成了前期的工作进入了实现阶段，但用户提出要增加一项新的功能，李先生应该 （ ） 。",[554,555,557,558],{"key":20,"text":477,"correct":22},{"key":24,"text":556,"correct":22},"认为用户要求合理、立即实现该变更",{"key":27,"text":479,"correct":29},{"key":31,"text":559,"correct":22},"要求用户与公司领导协调",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":24,"analysis":33},389267,"项目将要完成时，客户要求对工作范围进行较大的变更，项目经理应 （ ） 。",[564,566,568,570],{"key":20,"text":565,"correct":22},"执行变更",{"key":24,"text":567,"correct":29},"将变更能造成的影响通知客户",{"key":27,"text":569,"correct":22},"拒绝变更",{"key":31,"text":571,"correct":22},"将变更作为新项目来执行",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":24,"analysis":33},389268,"项目将要完成时，客户要求对工作范围进行较大的变更，项目经理应（）。",[576,577,578,579],{"key":20,"text":565,"correct":22},{"key":24,"text":567,"correct":29},{"key":27,"text":569,"correct":22},{"key":31,"text":571,"correct":22},{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":27,"analysis":33},389269,"某企业的管理系统进入试运行阶段，公司领导在试用该系统时认为他使用的出差报销表格的栏目设置不合理，便电话要求负责系统建设的项目经理修改，根据变更管理的要求，项目经理正确的做法是 （ ） 。",[584,586,588,590],{"key":20,"text":585,"correct":22},"告诉公司领导，项目试运行结束后再统一修改",{"key":24,"text":587,"correct":22},"让开发人员修改，再通知公司领导确认",{"key":27,"text":589,"correct":29},"将公司领导的要求记录下来，确认变更内容后提出正式的变更申请",{"key":31,"text":591,"correct":22},"亲自督促对该表格的修改，完成后亲自确认并向公司领导汇报",[593,597,600,603,606,609],{"id":594,"name":595,"category":7,"favorite":596},136,"法律职业试卷二(客观题 )",2,{"id":598,"name":599,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":601,"name":602,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":604,"name":605,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":607,"name":608,"category":7,"favorite":8},28,"安全工程师",{"id":610,"name":611,"category":7,"favorite":8},112,"安全生产法律知识"]