[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-20":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":596},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,20,50,1856,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,212,224,235,243,254,266,278,287,299,311,323,335,347,359,371,383,395,407,419,431,443,455,466,478,490,499,511,523,531,541,553,564,576,588],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},389170,1,"单选题","问题日志是（ ）的输入",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","识别干系人",false,{"key":24,"text":25,"correct":22},"B","规划干系人",{"key":27,"text":28,"correct":22},"C","管理干系人参与",{"key":30,"text":31,"correct":32},"D","控制干系人参与",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},389171,"（ ） 是项目干系人管理的主要目的。",[38,40,42,44],{"key":20,"text":39,"correct":22},"识别项目的所有潜在用户来确保完成项目总体设计",{"key":24,"text":41,"correct":22},"避免项目干系人提出不一致的要求",{"key":27,"text":43,"correct":22},"通过制订对项目干系人调查表来关注对项目的评价",{"key":30,"text":45,"correct":32},"避免项目干系人在项目管理中出现严重分歧",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},389172,"以下关于项目干系人管理的叙述中， （ ） 的表述是不正确的。",[50,52,54,56],{"key":20,"text":51,"correct":32},"对项目干系人的管理，由项目团队每个成员分别负责",{"key":24,"text":53,"correct":22},"项目干系人管理提高了干系人的满意度",{"key":27,"text":55,"correct":22},"项目干系人管理帮助解决与干系人相关的事宜",{"key":30,"text":57,"correct":22},"项目干系人管理加强了人员的协调行动能力",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},389173,"在某企业承建的一个信息系统集成项目中，建设方注重交付时间和质量，承建方公司老总注重项目利润，质量监控部经理注重项目的质量，人力资源部经理注重项目人力使用效率。下列围绕项目干系人管理的叙述错误的是 （ ）",[62,64,66,68],{"key":20,"text":63,"correct":22},"各项目干系人的目标可能是相互矛盾的",{"key":24,"text":65,"correct":22},"在项目不同阶段，干系人的要求要有不同的优先级别",{"key":27,"text":67,"correct":32},"重点考虑客户要求，人力资源部经理意见可忽略",{"key":30,"text":69,"correct":22},"当质量、进度、成本目标发生矛盾时，项目经理要进行平衡",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},389174,"在沟通管理中不仅要“用别人喜欢被对待的方式来对待他们”，而且还需要根据自身面临的情况，灵活采取适当的沟通措施。如重复对方的话，让对方确认，以真正了解对方的意图时，一般采用 （ ） 。",[74,76,78,80],{"key":20,"text":75,"correct":22},"假设性问题",{"key":24,"text":77,"correct":32},"探寻式问题",{"key":27,"text":79,"correct":22},"开放式问题",{"key":30,"text":81,"correct":22},"封闭式问题",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},389175,"（ ） 是用于编制沟通计划的输入。",[86,88,90,92],{"key":20,"text":87,"correct":32},"项目章程",{"key":24,"text":89,"correct":22},"沟通管理计划",{"key":27,"text":91,"correct":22},"沟通频率",{"key":30,"text":93,"correct":22},"沟通术语词汇表",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},389176,"广泛使用 （ ） 沟通最有可能帮助解决复杂问题。",[98,100,102,104],{"key":20,"text":99,"correct":22},"书面",{"key":24,"text":101,"correct":32},"口头",{"key":27,"text":103,"correct":22},"正式",{"key":30,"text":105,"correct":22},"非正式",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},389177,"作为乙方的系统集成项目经理与其单位高层领导沟通时，使用频率最少的沟通工具是（ ） 。",[110,112,114,116],{"key":20,"text":111,"correct":22},"状态报告",{"key":24,"text":113,"correct":32},"界面设计报告",{"key":27,"text":115,"correct":22},"需求分析报告",{"key":30,"text":117,"correct":22},"趋势报告",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},389178,"在进行项目干系人分析时，经常用到权力\u002F利益分析法，（ ）属于第二区域的项目干系人 。",[122,124,126,128],{"key":20,"text":123,"correct":32},"项目客户",{"key":24,"text":125,"correct":22},"项目团队成员",{"key":27,"text":127,"correct":22},"项目经理",{"key":30,"text":129,"correct":22},"供应商",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},389179,"在配置管理中，用于管理当前基线和控制对基线的变更的配置库是 （ ） 。",[134,136,138,140],{"key":20,"text":135,"correct":22},"动态库",{"key":24,"text":137,"correct":22},"备份库",{"key":27,"text":139,"correct":32},"受控库",{"key":30,"text":141,"correct":22},"静态库",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},389180,"以下关于配置项的描述中，不正确的是 （ ） 。",[146,148,150,152],{"key":20,"text":147,"correct":22},"使用配置管理工具后，所有配置项要以一定的目录结构保存在配置库中",{"key":24,"text":149,"correct":32},"所有配置项的操作权限应该由项目经理严格统一管理",{"key":27,"text":151,"correct":22},"所有配置项都必须按照相关规定进行统一编号",{"key":30,"text":153,"correct":22},"基线配置项要向软件开发人员开放读取的权限",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":30,"analysis":33},389181,"在以下基于配置库的变更控制的图示中，①应为（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"读写",{"key":24,"text":161,"correct":22},"删除",{"key":27,"text":163,"correct":22},"变更",{"key":30,"text":165,"correct":32},"复制",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},389182,"基线由一组配置项组成，这些配置项构成了一个相对稳定的逻辑实体，是一组经过（ ） 正式审查、批准、达成一致的范围或工作产品 。",[170,172,174,176],{"key":20,"text":171,"correct":22},"用户",{"key":24,"text":173,"correct":22},"配置管理员",{"key":27,"text":175,"correct":32},"配置控制委员会",{"key":30,"text":177,"correct":22},"专家组",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},389183,"某个配置项的版本由1.11变为1.12，按照配置版本号规则表明 （ ） 。",[182,184,186,188],{"key":20,"text":183,"correct":22},"目前配置项处于正在修改状态，配置项版本升级幅度较大",{"key":24,"text":185,"correct":32},"目前配置项处于正在修改状态，配置项版本升级幅度较小",{"key":27,"text":187,"correct":22},"目前配置项处于正式发布状态，配置项版本升级幅度较小",{"key":30,"text":189,"correct":22},"目前配置项处于正式发布状态，配置项版本升级幅度较大",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},389184,"根据配置版本号规则，某个配置项的版本号是1.0说明 （ ） 。",[194,196,198,200],{"key":20,"text":195,"correct":22},"目前配置项处理第一次“正在修改”状态",{"key":24,"text":197,"correct":32},"目前配置项处于第一次“正式发布”状态",{"key":27,"text":199,"correct":22},"目前配置项处于“草稿”状态",{"key":30,"text":201,"correct":22},"目前配置项处于“不可变更”状态",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},389185,"软件系统的版本号由3部分构成，即主版本号+次版本号+修改号。某个配置项的版本号是1.0，按照配置版本号规则表明 （ ） 。",[206,207,209,210],{"key":20,"text":201,"correct":22},{"key":24,"text":208,"correct":32},"目前配置项处于“正式发布”状态",{"key":27,"text":199,"correct":22},{"key":30,"text":211,"correct":22},"目前配置项处于“正在修改”状态",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":27,"analysis":33},389186,"在集成项目实施中，建设方要求建立项目配置管理。关于配置管理，以下叙述正确的是 （ ） 。",[216,218,220,222],{"key":20,"text":217,"correct":22},"配置管理适合软件开发过程，集成过程无法建立配置管理",{"key":24,"text":219,"correct":22},"配置管理必须要有配置工具，否则无法建立",{"key":27,"text":221,"correct":32},"如果没有专用工具，用手工方式也可以进行配置管理",{"key":30,"text":223,"correct":22},"配置库中把各设施登记清楚就可以",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":24,"analysis":33},389187,"如果一个配置项的版本号为1.1，那么这个配置项处于 （ ） 状态。",[228,230,231,233],{"key":20,"text":229,"correct":22},"草稿",{"key":24,"text":103,"correct":32},{"key":27,"text":232,"correct":22},"修改",{"key":30,"text":234,"correct":22},"完成",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":20,"analysis":33},389188,"某个配置项的版本由1.0变为2.0，按照配置版本号规则表明 （ ） 。",[239,240,241,242],{"key":20,"text":189,"correct":32},{"key":24,"text":187,"correct":22},{"key":27,"text":183,"correct":22},{"key":30,"text":185,"correct":22},{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":27,"analysis":33},389189,"根据配置项版本编号规则，版本编号为1.72的配置项应处于 （ ） 状态。",[247,249,251,253],{"key":20,"text":248,"correct":22},"第一次正式发布",{"key":24,"text":250,"correct":22},"修改后重新正式发布",{"key":27,"text":252,"correct":32},"正在修改",{"key":30,"text":229,"correct":22},{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":27,"analysis":33},389190,"项目组对某重要资源实施基于角色的访问控制。项目经理（PM）为系统管理员。项目成员角色还包括配置管理员（CM）、分析人员、设计人员、开发人员和质量保证人员（Q A），其中CM和QA同时参与多个项目。下面关于该资源访问权限分配的说法正确的是 （ ） 。",[258,260,262,264],{"key":20,"text":259,"correct":22},"CM的访问权限应由PM分配，且应得到QA的批准",{"key":24,"text":261,"correct":22},"QA的访问权限应由PM分配，其不参与项目时应将其权限转给CM",{"key":27,"text":263,"correct":32},"分析人员、设计人员、开发人员的访问权限应由CM分配，且应得到QA的批准",{"key":30,"text":265,"correct":22},"PM的访问权限由其自己分配，且PM不在时其权限不能转给QA和CM",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":30,"analysis":33},389191,"项目组成员中有一名专职的文件管理员，其主要职责之一是负责项目组的文件收发和保管。针对于文件收发环节，以下叙述不正确的是 （ ） 。",[270,272,274,276],{"key":20,"text":271,"correct":22},"电子版文件可通过授权系统来控制收发",{"key":24,"text":273,"correct":22},"对于纸制文件可以采用编号、盖章等方法控制文件的有效性",{"key":27,"text":275,"correct":22},"发给客户的文件可以不进行文件回收管理",{"key":30,"text":277,"correct":32},"对现场使用的外来文件可不进行文件收发管理",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":27,"analysis":33},389192,"基线由一组配置项组成，这些配置项构成了一个相对稳定的逻辑实体，是一组经过（ ） 正式审查，批准，达成一致的范围或工作产品。",[282,283,284,286],{"key":20,"text":171,"correct":22},{"key":24,"text":173,"correct":22},{"key":27,"text":285,"correct":32},"配置管理委员会",{"key":30,"text":177,"correct":22},{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":20,"analysis":33},389193,"配置审核的实施可以 （ ） 。",[291,293,295,297],{"key":20,"text":292,"correct":32},"防止向用户交付用户手册的不正确版本",{"key":24,"text":294,"correct":22},"确保项目进度的合理性",{"key":27,"text":296,"correct":22},"确认项目分解结构的合理性",{"key":30,"text":298,"correct":22},"确保活动资源的可用性",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":30,"analysis":33},389194,"以下有关基线的叙述，错误的是 （ ） 。",[303,305,307,309],{"key":20,"text":304,"correct":22},"基线由一组配置项组成",{"key":24,"text":306,"correct":22},"基线不能再被任何人任意修改",{"key":27,"text":308,"correct":22},"基线是一组经过正式审查并且达成一致的范围或工作产品",{"key":30,"text":310,"correct":32},"产品的测试版本不能被看作基线",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":24,"analysis":33},389195,"基线是项目配置管理的基础。（ ）不属于基线定义中的内容。",[315,317,319,321],{"key":20,"text":316,"correct":22},"建立基线的事件",{"key":24,"text":318,"correct":32},"基线识别",{"key":27,"text":320,"correct":22},"受控制项",{"key":30,"text":322,"correct":22},"批准基线变更的权限",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":30,"analysis":33},389196,"关于配置管理计划的制订和审批，下面说法正确的是 （ ） 。",[327,329,331,333],{"key":20,"text":328,"correct":22},"配置管理计划应由配置管理人员制订，由项目经理审批",{"key":24,"text":330,"correct":22},"配置管理计划应由项目经理制订，由配置控制委员会审批",{"key":27,"text":332,"correct":22},"配置管理计划应由项目经理制订，由QA人员审批",{"key":30,"text":334,"correct":32},"配置管理计划应由配置管理人员制订，由配置控制委员会审批",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":20,"analysis":33},389197,"某软件企业为了及时、准确地获得某软件产品配置项的当前状态，了解软件开发活动的进展状况，要求项目组出具配置状态报告，该报告内容应包括:（ ）。①各变更请求概要：变更请求号、申请日期、申请人、状态、发布版本、变更结束日期②基线库状态：库标识、至某日预计库内配置项数、实际配置项数、与前版本差异描述③发布信息：发布版本、计划发布时间、实际发布时间、说明④备份信息：备份日期、介质、备份存放位置⑤配置管理工具状态⑥设备故障信息：故障编号、设备编号、申请日期、申请人、故障描述、状态。",[339,341,343,345],{"key":20,"text":340,"correct":32},"①②③⑤",{"key":24,"text":342,"correct":22},"②③④⑥",{"key":27,"text":344,"correct":22},"①②③④",{"key":30,"text":346,"correct":22},"②③④⑤",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":27,"analysis":33},389198,"以下关于文档管理的描述中，（ ） 是正确的。",[351,353,355,357],{"key":20,"text":352,"correct":22},"程序源代码清单不属于文档",{"key":24,"text":354,"correct":22},"文档按项目周期角度可以分为开发文档和管理文档两大类",{"key":27,"text":356,"correct":32},"文档按重要性和质量要求可以分为正式文档和非正式文档",{"key":30,"text":358,"correct":22},"《软件文档管理指南》明确了软件项目文档的具体分类",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":27,"analysis":33},389199,"根据《软件文档管理指南GB\u002FT16680—1996》，文档策略是有上级（资深）管理者准备并支持的，对下级开发单位或开发人员提供指导。支持有效文档策略的基本条件中不包括（ ） 。",[363,365,367,369],{"key":20,"text":364,"correct":22},"文档需要覆盖整个软件生存期",{"key":24,"text":366,"correct":22},"文档标准应被标识和使用",{"key":27,"text":368,"correct":32},"文档规定管理者的主要职责",{"key":30,"text":370,"correct":22},"文档应适合于它的读者",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":20,"analysis":33},389200,"创建基线是项目配置管理的一项重要内容，创建基线或发现基线的主要步骤是（ ）",[375,377,379,381],{"key":20,"text":376,"correct":32},"获取CCB的授权、创建构造基线或发行基线、形成文件、使基线可用",{"key":24,"text":378,"correct":22},"形成文件、获取CCB的授权、创建构造基线或发现基线、使基线可用",{"key":27,"text":380,"correct":22},"使基线可用、获取CCB的授权、形成文件、创建构造基线或发行基线",{"key":30,"text":382,"correct":22},"获取CCB的授权、创建构造基线或发行基线、使基线可用、形成文件",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":27,"analysis":33},389201,"软件配置管理受控制的对象应是 （ ） 。",[387,389,391,393],{"key":20,"text":388,"correct":22},"软件元素",{"key":24,"text":390,"correct":22},"软件项目",{"key":27,"text":392,"correct":32},"软件配置项",{"key":30,"text":394,"correct":22},"软件过程",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":24,"analysis":33},389202,"（ ） 不属于管理文档。",[399,401,403,405],{"key":20,"text":400,"correct":22},"变更控制记录",{"key":24,"text":402,"correct":32},"开发计划",{"key":27,"text":404,"correct":22},"项目总结报告",{"key":30,"text":406,"correct":22},"需求文件评审记录",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":24,"analysis":33},389203,"下列选项中，不属于配置审核的作用是 （ ） 。",[411,413,415,417],{"key":20,"text":412,"correct":22},"防止向用户提交不适合的产品",{"key":24,"text":414,"correct":32},"确保项目范围的正确",{"key":27,"text":416,"correct":22},"确保变更遵循变更控制规程",{"key":30,"text":418,"correct":22},"找出各配置项间不匹配的现象",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":24,"analysis":33},389204,"某软件项目的《需求规格说明书》第一次正式发布时，版本号为V1.0，此后，由于发现了几处错误，对该《需求规格说明书》进行了2次小的升级，此时版本号应为（ ） 。",[423,425,427,429],{"key":20,"text":424,"correct":22},"V1.1 1",{"key":24,"text":426,"correct":32},"V1.2",{"key":27,"text":428,"correct":22},"V2.0",{"key":30,"text":430,"correct":22},"V2.1",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":27,"analysis":33},389205,"配置项的版本号规则与配置项的状态相关，以下叙述中正确的是 （ ） 。",[435,437,439,441],{"key":20,"text":436,"correct":22},"处于“正式”状态的配置项版本号格式为x.y，当配置项升级幅度较大时，可以将变动部分制作为配置项的附件，附件版本依次为1.0，1.1，……",{"key":24,"text":438,"correct":22},"处于“修改”状态的配置项版本号格式为X.YZ，其中X保持不变，YZ在01～99之间递增",{"key":27,"text":440,"correct":32},"处于“草稿”状态的配置项版本号格式为O.YZ，随着草稿的修正，YZ取值逐渐递增，而YZ的初值和幅值由用户自行把握",{"key":30,"text":442,"correct":22},"处于“草稿”状态的配置项版本号格式为x.YZ，当配置项通过评审，状态第一次成为“正式”时，版本号直接设置为1.0",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":24,"analysis":33},389206,"某系统集成企业为做好项目配置管理，对配置库中的操作权限进行了以下定义： 同时对项目相关人员在该开发库中的操作权限进行了如下分配，其中√表示该人员具有相应权限，?表示该人员没有相应权限。",[447,449,451,453],{"key":20,"text":448,"correct":22},"①√，②×，③×，④√，⑤√",{"key":24,"text":450,"correct":32},"①√，②√，③√，④×，⑤√",{"key":27,"text":452,"correct":22},"①√，②√，③×，④×，⑤√",{"key":30,"text":454,"correct":22},"①×，②√，③√，④×，⑤×",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":20,"analysis":33},389207,"在信息系统开发某个阶段工作结束时，应将工作产品及有关信息存入配置库的（ ）。",[459,460,462,464],{"key":20,"text":139,"correct":32},{"key":24,"text":461,"correct":22},"开发库",{"key":27,"text":463,"correct":22},"产品库",{"key":30,"text":465,"correct":22},"知识库",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":20,"analysis":33},389208,"项目验收时发现项目经理签字确认的《需求规格说明书》纸质文档内容与配置服务器上的产品库同一文档内容不一致，最有可能是在（ ）的执行上出现了问题。",[470,472,474,476],{"key":20,"text":471,"correct":32},"文档管理规范",{"key":24,"text":473,"correct":22},"文档目录编写标准",{"key":27,"text":475,"correct":22},"文档书写规范",{"key":30,"text":477,"correct":22},"图表编号规则",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":30,"analysis":33},389209,"（）不是创建基线或发行基线的主要步骤。",[482,484,486,488],{"key":20,"text":483,"correct":22},"获得CCB的授权",{"key":24,"text":485,"correct":22},"确定基线配置项",{"key":27,"text":487,"correct":22},"形成文件",{"key":30,"text":489,"correct":32},"建立配置管理系统",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":27,"analysis":33},389210,"按照软件配罝管理的基本指导思想，受控制的对象应是（ ）。",[494,495,496,498],{"key":20,"text":388,"correct":22},{"key":24,"text":390,"correct":22},{"key":27,"text":497,"correct":32},"软件配罝项",{"key":30,"text":394,"correct":22},{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":24,"analysis":33},389211,"在配置项版本控制过程中，处于“正式发布”状态的配置项的版本号格式为 （ ） （X、Y、Z均为1～9的数字）",[503,505,507,509],{"key":20,"text":504,"correct":22},"0.YZ",{"key":24,"text":506,"correct":32},"X.Y",{"key":27,"text":508,"correct":22},"X.Y.Z",{"key":30,"text":510,"correct":22},"X.YZ",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":27,"analysis":33},389212,"基线由一组配置项组成，这些配置项构成了一个相对稳定的逻辑实体，其主要属性一般主要包括 （ ）",[515,517,519,521],{"key":20,"text":516,"correct":22},"配置项、标识符、版本、流程",{"key":24,"text":518,"correct":22},"配置项、名称、流程、日期",{"key":27,"text":520,"correct":32},"名称、标识符、版本、日期",{"key":30,"text":522,"correct":22},"配置计划、版本、状态、流程",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":30,"analysis":33},389213,"在开发的软件产品完成系统测试之后，作为最终产品应将其存入 （ ） ，等待交付用户或现场安装。",[527,528,529,530],{"key":20,"text":465,"correct":22},{"key":24,"text":461,"correct":22},{"key":27,"text":139,"correct":22},{"key":30,"text":463,"correct":32},{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":24,"analysis":33},389214,"某软件开发项目的《概要设计说明书》版本号为V2. 13，该配置项的状态是（ ）",[535,537,538,540],{"key":20,"text":536,"correct":22},"首次发布",{"key":24,"text":252,"correct":32},{"key":27,"text":539,"correct":22},"正在发布",{"key":30,"text":229,"correct":22},{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":30,"analysis":33},389215,"配置管理是软件生命周期中的重要控制过程，在软件开发过程中扮演着重要的角色，根据GB\u002FT 11457-2006《软件工程术语》的描述，以下关于配置管理基线的叙述中，（ ）是不正确的。",[545,547,549,551],{"key":20,"text":546,"correct":22},"配置管理基线包括功能基线，即最初通过的功能的配置",{"key":24,"text":548,"correct":22},"配置管理基线包括分配基线，即最初通过的分配的配置",{"key":27,"text":550,"correct":22},"配置管理基线包括产品基线，即最初通过的或有条件通过的产品的配置",{"key":30,"text":552,"correct":32},"配置管理基线包括时间基线，即最初通过的时间的安排",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":27,"analysis":33},389216,"某软件开发项目的需求规格说明书第一次正式发布，命名为《需求规格说明书 V1.0》，此后经过两次较小的升级，版本号升至 V1.2，此时客户提出一次需求变更，项目组接受了变更，按客户的要求对需求规格说明书进行了较大的改动并通过评审，此时版本号应升级为 （ ） 。",[557,559,561,562],{"key":20,"text":558,"correct":22},"V1.3",{"key":24,"text":560,"correct":22},"V1.5",{"key":27,"text":428,"correct":32},{"key":30,"text":563,"correct":22},"V3.0",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":20,"analysis":33},389217,"某开发项目配置管理计划中定义了三条基线，分别是需求基线、设计基线和产品基线， （ ） 应该是需求基线、设计基线和产品基线均包含的内容。",[568,570,572,574],{"key":20,"text":569,"correct":32},"需求规格说明书",{"key":24,"text":571,"correct":22},"详细设计说明书",{"key":27,"text":573,"correct":22},"用户手册",{"key":30,"text":575,"correct":22},"概要设计说明书",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":30,"analysis":33},389218,"在需求开发中，完成 （ ） 过程后将确定需求基线。",[580,582,584,586],{"key":20,"text":581,"correct":22},"需求获取",{"key":24,"text":583,"correct":22},"需求分析",{"key":27,"text":585,"correct":22},"需求定义",{"key":30,"text":587,"correct":32},"需求验证",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":30,"analysis":33},389219,"某个配置项的版本号是2.01，按照配置项版本号规则表明 （ ） 。",[592,593,594,595],{"key":20,"text":201,"correct":22},{"key":24,"text":208,"correct":22},{"key":27,"text":199,"correct":22},{"key":30,"text":211,"correct":32},[597,601,604,607,610,613],{"id":598,"name":599,"category":7,"favorite":600},136,"法律职业试卷二(客观题 )",2,{"id":602,"name":603,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":605,"name":606,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":608,"name":609,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":611,"name":612,"category":7,"favorite":8},28,"安全工程师",{"id":614,"name":615,"category":7,"favorite":8},112,"安全生产法律知识"]