[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":615},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,2,50,1856,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,297,307,319,331,343,355,367,379,390,402,414,425,437,449,461,473,485,497,508,520,532,544,556,567,579,591,603],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},388254,1,"单选题","针对信息系统，安全可以划分为以下四个层次：设备安全、数据安全、内容安全、行为安全，其中（ ）即是传统的信息安全",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","设备安全",false,{"key":24,"text":25,"correct":26},"B","数据安全",true,{"key":28,"text":29,"correct":22},"C","内容安全",{"key":31,"text":32,"correct":22},"D","行为安全","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},388255,"系统集成项目完成了需求分析阶段的工作并开发了原型系统，承建方应组织本方项目经理、建设方代表和相关干系人完成（ ）工作。",[38,40,42,44],{"key":20,"text":39,"correct":22},"代码走查",{"key":24,"text":41,"correct":22},"桌面检查",{"key":28,"text":43,"correct":22},"同行评审",{"key":31,"text":45,"correct":26},"阶段评审",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},388256,"（ ）不属于项目型组织的缺点",[50,52,54,56],{"key":20,"text":51,"correct":26},"目标单一",{"key":24,"text":53,"correct":22},"员工缺乏事业上的连续性和保障",{"key":28,"text":55,"correct":22},"不利于沟通、技术知识共享",{"key":31,"text":57,"correct":22},"难以监测和控制",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},388257,"在项目管理工作中，项目管理师认识到如果只有领导能力而没有管理能力或只有管理能力而没有领导能力，都可能带来不好的结果。以下这些能力中（ ）最能代表项目管理师的领导才能。",[62,64,66,68],{"key":20,"text":63,"correct":26},"确立方向，招募人员，激发和鼓励其他人",{"key":24,"text":65,"correct":22},"通过其他人来完成工作",{"key":28,"text":67,"correct":22},"运用超凡的人格魅力来激发其他人",{"key":31,"text":69,"correct":22},"运用各种适当的力量作为激发工具",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},388258,"在管理信息系统项目的实施过程中，不仅需要管理过程，也需要技术过程、支持过程、过程改进和商务过程等，它们分别来自项目管理知识、项目环境知识、通用的管理知识和技能、软技能或人际关系技能以及（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"软件开发方法体系的知识、标准和规定",{"key":24,"text":77,"correct":22},"软件工具和软件工程环境的知识、标准和规定",{"key":28,"text":79,"correct":22},"用户或客户业务领域的知识、标准和规定",{"key":31,"text":81,"correct":26},"信息技术及客户业务领域的知识、标准和规定",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},388259,"一般情况下，随着项目的逐渐进展，成本和人员投入水平呈现出（ ）的态势。",[86,88,90,92],{"key":20,"text":87,"correct":26},"先增后减",{"key":24,"text":89,"correct":22},"先减后增",{"key":28,"text":91,"correct":22},"逐渐增加",{"key":31,"text":93,"correct":22},"逐渐减少",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},388260,"在软件开发的V模型中，应该在（ ）阶段制定单元测试计划。",[98,100,102,104],{"key":20,"text":99,"correct":22},"需求分析",{"key":24,"text":101,"correct":22},"概要设计",{"key":28,"text":103,"correct":22},"详细设计",{"key":31,"text":105,"correct":26},"代码编写",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},388261,"沟通、领导和磋商是属于（ ）的技能。",[110,112,114,116],{"key":20,"text":111,"correct":22},"项目管理",{"key":24,"text":113,"correct":26},"一般管理",{"key":28,"text":115,"correct":22},"团队管理",{"key":31,"text":117,"correct":22},"执行管理",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},388262,"适用于项目事先不能完整定义产品所有需求、计划多期开发的软件生命周期模型是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"快速原型开发",{"key":24,"text":125,"correct":22},"快速创新开发",{"key":28,"text":127,"correct":22},"瀑布模型",{"key":31,"text":129,"correct":26},"迭代模型",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},388263,"在（ ）中，项目经理的权利最小",[134,136,138,140],{"key":20,"text":135,"correct":22},"强矩阵组织",{"key":24,"text":137,"correct":26},"弱矩阵组织",{"key":28,"text":139,"correct":22},"平衡矩阵组织",{"key":31,"text":141,"correct":22},"项目型组织",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},388264,"项目的特征不包括（ ）",[146,148,150,152],{"key":20,"text":147,"correct":22},"一次性",{"key":24,"text":149,"correct":22},"冲突性",{"key":28,"text":151,"correct":22},"唯一性",{"key":31,"text":153,"correct":26},"稳定性",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},388265,"在信息系统集成项目开发的开始阶段，如果项目存在很多不确定性因素且项目的参与人员还不能完全理解项目开发的范围和需求，那么采用（ ）作为此项目的开发模型更符合项目的实际情况。",[158,160,162,164],{"key":20,"text":159,"correct":26},"增量迭代模型或螺旋模型",{"key":24,"text":161,"correct":22},"面向过程的瀑布模型",{"key":28,"text":163,"correct":22},"面向对象的模型或快速模型",{"key":31,"text":165,"correct":22},"部分并行的瀑布模型",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},388266,"投资大、建设周期长、专业复杂、技术人员来自多个部门的大型项目，最好采用（ ）组织形式或近似的组织形式。",[170,172,174,176],{"key":20,"text":171,"correct":22},"职能型",{"key":24,"text":173,"correct":26},"项目型",{"key":28,"text":175,"correct":22},"弱矩阵型",{"key":31,"text":177,"correct":22},"紧密型",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},388267,"以下对项目管理和项目监理的理解中，正确的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"项目监理属于项目管理的监控过程组",{"key":24,"text":185,"correct":22},"项目监理属于项目管理的执行过程组",{"key":28,"text":187,"correct":22},"项目管理与项目监理是独立两个过程，没有任何关系",{"key":31,"text":189,"correct":26},"项目建设方和项目承建方都需要开展项目管理工作，而项目监理要由第三方负责",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},388268,"在项目计划阶段由于各种约束条件搞不清晰，所以在计划过程中会遵循基本的方法论以指导项目计划的规定（ ）属于项目管理方法论的一部分。",[194,196,198,200],{"key":20,"text":195,"correct":26},"计划的标准格式和模板",{"key":24,"text":197,"correct":22},"项目相关授权",{"key":28,"text":199,"correct":22},"项目干系人的性能",{"key":31,"text":201,"correct":22},"初步范围说明书",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},388269,"与组织日常的、例行的运营工作不同，项目具有些非常明显的特点。“没有完全一样的项目”体现了项目的（ ）",[206,208,210,212],{"key":20,"text":207,"correct":22},"临时性",{"key":24,"text":209,"correct":26},"独特性",{"key":28,"text":211,"correct":22},"差异性",{"key":31,"text":213,"correct":22},"系统性",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":28,"analysis":33},388270,"项目立项包括：项目建议、项目可行性分析、项目审批、项目招投标、项目合同谈判5个阶段、（ ）属于项目可行性分析阶段的内容",[218,220,222,224],{"key":20,"text":219,"correct":22},"编制立项申请",{"key":24,"text":221,"correct":22},"编制项目建议书",{"key":28,"text":223,"correct":26},"项目评估",{"key":31,"text":225,"correct":22},"重新报批可研性",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":28,"analysis":33},388271,"某企业针对“新一代网络操作系统”开发项目进行可行性论证。在论证的最初阶段，一般情况下不会涉及到（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"调研了解新一代网络操作系统的市场需求",{"key":24,"text":233,"correct":22},"分析论证是否具备相应的开发技术",{"key":28,"text":235,"correct":26},"详细估计系统开发周期",{"key":31,"text":237,"correct":22},"结合企业财务经济情况进行论证分析",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},388272,"项目论证一般分为机会研究、初步可行性研究和详细可行性研究三个阶段。以下叙述中（ ）是正确的。",[242,244,246,248],{"key":20,"text":243,"correct":22},"机会研究的内容为项目是否有生命力，能否盈利",{"key":24,"text":245,"correct":22},"详细可行性研究是要寻求投资机会，鉴别投资方向",{"key":28,"text":247,"correct":22},"初步可行性研究阶段在多方案比较的基础上选择出最优方案",{"key":31,"text":249,"correct":26},"项目论证是确定项目是否实施的前提",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},388273,"在编写项目可行性研究报告时，风险因素及对策主要是对项目的市场风险、（ ）法律风险，经济及社会风险等因素进行评价，制定规避风险的对策，为项目的全过程的管理提供依据。",[254,256,258,260],{"key":20,"text":255,"correct":22},"技术风险，财务风险，环境风险",{"key":24,"text":257,"correct":26},"技术风险，财务风险，组织风险",{"key":28,"text":259,"correct":22},"技术风险，组织风险，环境风险",{"key":31,"text":261,"correct":22},"财务风险，组织风险，环境风险",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},388274,"信息系统可行性研究包括很多方面的内容，（ ）中经常会用到敏感性分析。",[266,268,270,272],{"key":20,"text":267,"correct":22},"技术可行性分析",{"key":24,"text":269,"correct":26},"经济可行性分析",{"key":28,"text":271,"correct":22},"运行环境可行性分析",{"key":31,"text":273,"correct":22},"社会可行性分析",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":28,"analysis":33},388275,"制定合理的实施进度计划、设计合理的组织结构、选择经验丰富的管理人员、建立良好的协作关系、制定合适的培训计划等内容属于信息系统集成项目的可行性研究中（ ）研究的内容。",[278,280,282,284],{"key":20,"text":279,"correct":22},"经济及风险可行性",{"key":24,"text":281,"correct":22},"社会可行性",{"key":28,"text":283,"correct":26},"组织可行性",{"key":31,"text":285,"correct":22},"财务可行性",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},388276,"评估开发所需的成本和资源属于可行性研究中（ ）研究的主要内容。",[290,291,293,295],{"key":20,"text":281,"correct":22},{"key":24,"text":292,"correct":26},"经济可行性",{"key":28,"text":294,"correct":22},"技术可行性",{"key":31,"text":296,"correct":22},"实施可行性",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":31,"analysis":33},388277,"在信息系统项目可行性研究报告中，项目实施进度计划和项目招标方案一般属于（ ）研究的内容",[301,303,304,306],{"key":20,"text":302,"correct":22},"政策可行性",{"key":24,"text":292,"correct":22},{"key":28,"text":305,"correct":22},"市场可行性",{"key":31,"text":294,"correct":26},{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":31,"analysis":33},388278,"项目的可行性研究一般包括的内容有：投资必要性、技术可行性、财务可行性、经济可行性、组织可行性、社会可行性、风险因素及对策。以下关于项目可行性研究的叙述中（ ）是不正确的。",[311,313,315,317],{"key":20,"text":312,"correct":22},"投资必要性主要是根据市场调查及预测的结果，以及有关产业政策等因素，论证投资建设的必要性。",{"key":24,"text":314,"correct":22},"技术可行性是从技术角度，合理设计技术方案，并对有关内容进行比较、选择和评价。",{"key":28,"text":316,"correct":22},"财务可行性是指从项目及投资者的角度，设计合理的财务方案，并进行评价，做出投资决策。",{"key":31,"text":318,"correct":26},"经济可行性是分析项目对社会的影响，包括政治体制，方针政策，社会稳定性等。",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":31,"analysis":33},388279,"确定信息系统集成项目的需求是项目成功实施的保证，项目需求确定属于（ ）的内容。",[323,325,327,329],{"key":20,"text":324,"correct":22},"初步可行性研究",{"key":24,"text":326,"correct":22},"范围说明书",{"key":28,"text":328,"correct":22},"项目范围基准",{"key":31,"text":330,"correct":26},"详细可行性研究",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":24,"analysis":33},388280,"投标文件存在对招标文件响应的非实质性的微小偏差，则该投标文件应（ ）。",[335,337,339,341],{"key":20,"text":336,"correct":22},"不予淘汰，但需在订立合同前予以澄清",{"key":24,"text":338,"correct":26},"不予淘汰，但需在评估结束前予以澄清",{"key":28,"text":340,"correct":22},"不予淘汰，允许投标人重新投标",{"key":31,"text":342,"correct":22},"予以淘汰",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":28,"analysis":33},388281,"以下关于项目可行性研究内容的叙述，（ ）是不正确的。",[347,349,351,353],{"key":20,"text":348,"correct":22},"技术可行性是从项目实施的技术角度，合理设计技术方案，并进行评审和评价",{"key":24,"text":350,"correct":22},"经济可行性主要是从资源配置的角度衡量项目的价值，从项目的投资及所产生的经济效益进行分析",{"key":28,"text":352,"correct":26},"可行性研究不涉及合同责任、知识产权等法律方面的可行性问题",{"key":31,"text":354,"correct":22},"社会可行性主要分析项目对社会的影响，包括法律道德、民族宗教、社会稳定性等",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":31,"analysis":33},388282,"一般是项目初步可行性研究关注的问题（ ）",[359,361,363,365],{"key":20,"text":360,"correct":22},"合作方式",{"key":24,"text":362,"correct":22},"项目进度安排",{"key":28,"text":364,"correct":22},"技术合作计划",{"key":31,"text":366,"correct":26},"投资与成本估算",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":28,"analysis":33},388283,"项目建议书是项目建设单位进行项目申请时提交的文件，其中“项目建设目标与主要内容建设”出现在项目建议书的（ ）部分。",[371,373,375,377],{"key":20,"text":372,"correct":22},"项目建设单位概况",{"key":24,"text":374,"correct":22},"项目建设必要性",{"key":28,"text":376,"correct":26},"总体建设方案",{"key":31,"text":378,"correct":22},"业务分析",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":24,"analysis":33},388284,"立项管理是项目管理中的一项重要内容。从项目管理的角度看，立项管理主要是解决项目的（ ）问题。",[383,384,386,388],{"key":20,"text":294,"correct":22},{"key":24,"text":385,"correct":26},"组织战略符合性",{"key":28,"text":387,"correct":22},"高层偏好",{"key":31,"text":389,"correct":22},"需求收集和确认",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":20,"analysis":33},388285,"以下关于开标与评标的叙述中，不正确的是（ ）",[394,396,398,400],{"key":20,"text":395,"correct":26},"评标委员会的数量为单数，其中技术、经济等方面专家人数不得少于成员总数的1\u002F2",{"key":24,"text":397,"correct":22},"招标人自收到评价报告之日起3日内公示中标候选人，公示期不得少于3日",{"key":28,"text":399,"correct":22},"必须进行招标的项目，招标人应该确定排名第一的中标候选人为中标人",{"key":31,"text":401,"correct":22},"评标报告应当有评标委员会全体成员签字",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":20,"analysis":33},388286,"在评标过程中，（ ）是不符合招标投标法要求的。",[406,408,410,412],{"key":20,"text":407,"correct":26},"评标委员会委员由5人组成，其中招标人代表2人，经济、技术专家3人",{"key":24,"text":409,"correct":22},"评标委员会认为A投标单位的投标文件中针对某项技术的阐述不够清晰，要求A单位予以澄清",{"key":28,"text":411,"correct":22},"某单位的投标文件中某分项工程的报价存在个别漏项，评标委员会认为个别漏项属于细微偏差，投标标书有效",{"key":31,"text":413,"correct":22},"某单位虽然按招标文件要求编制了投标文件，但是个别页面没有编制页码，评标委员会认为投标标书有效。",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":20,"analysis":33},388287,"分析、讨论和验证项目计划和方案，并且给出明确的判断和意见，是项目立项阶段的（ ）工作中的内容",[418,420,421,423],{"key":20,"text":419,"correct":26},"项目论证",{"key":24,"text":223,"correct":22},{"key":28,"text":422,"correct":22},"项目建议",{"key":31,"text":424,"correct":22},"项目需求收集",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":28,"analysis":33},388288,"关于项目评估和项目论证的描述，不正确的是（ ）",[429,431,433,435],{"key":20,"text":430,"correct":22},"项目论证应该围绕市场需求、开发技术、财务经济三个方面展开调查和分析",{"key":24,"text":432,"correct":22},"项目论证一般可分为机会研究、初步可行性研究和详细可行性研究三个阶段",{"key":28,"text":434,"correct":26},"项目评估由项目建设单位实施，目的是审查在项目可行性研究的可靠性、真实性和客观性，为银行的贷款决策或行政主管部门的审批决策提供依据",{"key":31,"text":436,"correct":22},"项目评估的依据包括项目建议书及其批准文件、项目可行性研究报告、报送单位的申请报告及主管部门的初审意见等一系列文件",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":28,"analysis":33},388289,"有关可行性研究的叙述中错误的是（ ）。",[441,443,445,447],{"key":20,"text":442,"correct":22},"信息系统项目开发的可行性研究要从可能性、效益性和必要性入手",{"key":24,"text":444,"correct":22},"可行性研究要遵守科学性和客观性原则",{"key":28,"text":446,"correct":26},"信息系统项目的可行性研究，应对项目采用的技术、所处的环境进行全面的评价",{"key":31,"text":448,"correct":22},"项目可行性研究可采用投资估算法、增量净效益法等方法",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":28,"analysis":33},388290,"作为系统集成企业售前负责人，在说服本单位领导批准参加项目投标时，不需介绍（ ）。",[453,455,457,459],{"key":20,"text":454,"correct":22},"本企业技术可行性分析",{"key":24,"text":456,"correct":22},"企业人员能力和配置分析",{"key":28,"text":458,"correct":26},"项目的国民经济分析",{"key":31,"text":460,"correct":22},"项目财务可行性分析",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":28,"analysis":33},388292,"不属于监控项目工作的成果的是（ ）",[465,467,469,471],{"key":20,"text":466,"correct":22},"变更请求",{"key":24,"text":468,"correct":22},"问题日志",{"key":28,"text":470,"correct":26},"工作日志",{"key":31,"text":472,"correct":22},"成本基准",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":24,"analysis":33},388293,"小李作为项目经理需要从以下四个项目方案中选择项目，已知项目周期均为2年且期初投资额都是30.000元，折现率均为10%。项目情况如下:方案 A:第一年现金流为14，000元，第二年现金流19，000元方案 B:第年现金流为23，000元，第二年现金流20，000元方案 C:第一年现金流为18,000元，第二年现金流24,000元方案 D:第一年现金流为21,000元，第二年现金流22,000元则小李应该优先选择（ ） A.方案A B.方案B C.方案C D.方案D",[477,479,481,483],{"key":20,"text":478,"correct":22},"方案A",{"key":24,"text":480,"correct":26},"方案B",{"key":28,"text":482,"correct":22},"方案C",{"key":31,"text":484,"correct":22},"方案D",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":28,"analysis":33},388294,"某系统集成项目的项目经理在制定项目章程时，必须要考虑涉及并影响项目的环境和组织因素。（ ）不属于环境和组织因素的内容。",[489,491,493,495],{"key":20,"text":490,"correct":22},"公司文化和结构",{"key":24,"text":492,"correct":22},"员工绩效评估记录",{"key":28,"text":494,"correct":26},"变更控制流程",{"key":31,"text":496,"correct":22},"项目管理信息系统",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":24,"analysis":33},388295,"项目管理计划的内容不包括（ ）。",[501,503,505,507],{"key":20,"text":502,"correct":22},"沟通管理计划",{"key":24,"text":504,"correct":26},"选择的生命周期模型",{"key":28,"text":506,"correct":22},"资源日历",{"key":31,"text":472,"correct":22},{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":24,"analysis":33},388296,"（ ）属于组织过程资产。",[512,514,516,518],{"key":20,"text":513,"correct":22},"基础设施",{"key":24,"text":515,"correct":26},"组织的经验学习系统",{"key":28,"text":517,"correct":22},"组织劳务关系标准",{"key":31,"text":519,"correct":22},"招聘、培养、使用和解聘的指导方针",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":20,"analysis":33},388297,"以下关于项目管理计划编制的理解中，正确的是（ ）。",[524,526,528,530],{"key":20,"text":525,"correct":26},"项目经理应组织并主要参与项目管理计划的编制，但不应独立编制",{"key":24,"text":527,"correct":22},"项目管理计划的编制不能采用迭代的方法",{"key":28,"text":529,"correct":22},"让项目干系人参与项目计划的编制，增加了沟通成本，应尽量避免",{"key":31,"text":531,"correct":22},"项目管理计划不能是概括的，应该是详细、具体的",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":24,"analysis":33},388298,"项目章程的制定过程主要关注记录建设方的（ ）、项目立项的理由与背景、对客户需求的现有理解和满足这些需求的新产品、服务或成果。",[536,538,540,542],{"key":20,"text":537,"correct":22},"合同规定",{"key":24,"text":539,"correct":26},"商业需求",{"key":28,"text":541,"correct":22},"功能需求",{"key":31,"text":543,"correct":22},"产品需求",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":28,"analysis":33},388299,"项目经理在编制项目管理计划时，应（ ）。",[548,550,552,554],{"key":20,"text":549,"correct":22},"越简单越好",{"key":24,"text":551,"correct":22},"越详细越好",{"key":28,"text":553,"correct":26},"逐步细化",{"key":31,"text":555,"correct":22},"按照公司的模板编制，不能变更",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":20,"analysis":33},388300,"以下各项中，（ ）不是整体变更控制的输入。",[560,562,563,565],{"key":20,"text":561,"correct":26},"己批准的纠正措施",{"key":24,"text":466,"correct":22},{"key":28,"text":564,"correct":22},"实际的绩效数据",{"key":31,"text":566,"correct":22},"己批准的项目管理计划",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":20,"analysis":33},388302,"某项目经理要求采购管理员从外面供货商那里采购硬件设备时，需要准备一个（ ）以描述采购设备的相关质量技术指标、验收标准和付款方式与期限等内容。",[571,573,575,577],{"key":20,"text":572,"correct":26},"工作说明书",{"key":24,"text":574,"correct":22},"合同范围说明",{"key":28,"text":576,"correct":22},"项目章程",{"key":31,"text":578,"correct":22},"合同",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":24,"analysis":33},388303,"（ ）不属于项目监控的工作内容。",[583,585,587,589],{"key":20,"text":584,"correct":22},"随时收集干系人需求",{"key":24,"text":586,"correct":26},"分析项目风险",{"key":28,"text":588,"correct":22},"测量项目绩效",{"key":31,"text":590,"correct":22},"分发绩效信息",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":24,"analysis":33},388304,"项目收尾是项目管理的重要环节，为了指导收尾涉及的所有管理活动和安排相应资源，项目经理应制定（ ）。",[595,597,599,601],{"key":20,"text":596,"correct":22},"合同收尾规程",{"key":24,"text":598,"correct":26},"管理收尾规程",{"key":28,"text":600,"correct":22},"产品收尾计划",{"key":31,"text":602,"correct":22},"项目验收计划",{"id":604,"libraryId":5,"type":15,"typeLabel":16,"stem":605,"options":606,"answer":31,"analysis":33},388305,"项目章程发布的目标一般不包括（ ）。",[607,609,611,613],{"key":20,"text":608,"correct":22},"使项目与组织的日常经营联系起来",{"key":24,"text":610,"correct":22},"进一步确定客户的商业需求，以及对客户需求的理解",{"key":28,"text":612,"correct":22},"为项目经理使用组织资源进行项目活动进行授权",{"key":31,"text":614,"correct":26},"确认项目团队成员的具体任务分工",[616,619,622,625,628,631],{"id":617,"name":618,"category":7,"favorite":9},136,"法律职业试卷二(客观题 )",{"id":620,"name":621,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":623,"name":624,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":626,"name":627,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":629,"name":630,"category":7,"favorite":8},28,"安全工程师",{"id":632,"name":633,"category":7,"favorite":8},112,"安全生产法律知识"]