[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-18":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":591},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,18,50,1856,[13,34,46,58,70,82,91,103,113,125,137,146,158,170,182,194,203,214,224,235,244,256,268,280,292,304,316,328,340,348,360,372,384,396,408,420,432,444,456,468,480,492,504,512,524,536,548,556,568,579],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},389066,1,"单选题","测试成本属于（ ）",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","内部失败成本",false,{"key":24,"text":25,"correct":22},"B","外部失败成本",{"key":27,"text":28,"correct":22},"C","预防成本",{"key":30,"text":31,"correct":32},"D","评价成本",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},389067,"（ ）是一种特殊的垂直条形图，用于识别造成大多数问题的少数重要原因。",[38,40,42,44],{"key":20,"text":39,"correct":22},"直方图",{"key":24,"text":41,"correct":32},"帕累托图",{"key":27,"text":43,"correct":22},"控制图",{"key":30,"text":45,"correct":22},"散点图",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},389068,"某项目质量管理的部分流程为：编制需求报告→编制测试计划→测试设计→批准测试设计→ 测试→编制测试报告→批准测试报告。新入职的测试人员小刘按照该流程对某系统进行了测试并产生了测试报告，客户对测试内容和结果不满意。该项目质量管理中存在的最主要问题是（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"测试人员素质不高",{"key":24,"text":53,"correct":22},"测试用例设计方法不当",{"key":27,"text":55,"correct":32},"缺少评审环节",{"key":30,"text":57,"correct":22},"缺少质量审计环节",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},389069,"在质量保证中，（ ）用来确定项目活动是否遵循了组织和项目的政策、过程与程序。",[62,64,66,68],{"key":20,"text":63,"correct":22},"实验设计",{"key":24,"text":65,"correct":22},"基准分析",{"key":27,"text":67,"correct":22},"过程分析",{"key":30,"text":69,"correct":32},"质量审计",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},389070,"以下关于质量保证的叙述中，不正确的是:（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"实施质量保证是确保采用合理的质量标准和操作性定义的过程",{"key":24,"text":77,"correct":32},"实施质量保证是通过执行产品检查并发现缺陷来实现的",{"key":27,"text":79,"correct":22},"质量测量指标是质量保证的输入",{"key":30,"text":81,"correct":22},"质量保证活动可由第三方团队进行监督，适当时提供服务支持",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},389071,"在质量规划中， （ ） 是一种统计分析技术，可用来帮助人们识别并找出哪些变量对项目结果的影响最大。",[86,88,89,90],{"key":20,"text":87,"correct":22},"成本\u002F效益分析",{"key":24,"text":65,"correct":22},{"key":27,"text":63,"correct":32},{"key":30,"text":69,"correct":22},{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":27,"analysis":33},389072,"在质量审计时，审计小组发现如下事实：一批计算机数量为50台的进货合同，在检验时抽检了其中8台计算机，发现两台不合格。该检验员把这两台抽出，其余48台放行，并已发放到施工现场。审计员的下列行为，恰当的是 （ ）",[95,97,99,101],{"key":20,"text":96,"correct":22},"判定检验过程没问题",{"key":24,"text":98,"correct":22},"判定检验过程存在问题，并要求检验员对50台计算机全检",{"key":27,"text":100,"correct":32},"判定检验过程存在问题，先下令停止使用其余计算机，并给检验部门下发纠正措施通知单",{"key":30,"text":102,"correct":22},"判定检验过程存在问题，并要求检验员分析原因，下令改进",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":27,"analysis":33},389073,"（ ）是质量保证的工具和技术",[107,109,110,111],{"key":20,"text":108,"correct":22},"统计抽样",{"key":24,"text":63,"correct":22},{"key":27,"text":69,"correct":32},{"key":30,"text":112,"correct":22},"质量成本",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":30,"analysis":33},389074,"A公司为某项目的总承包商，小江为该项目的项目经理，A公司有一个比较弱的质量方针，参与该项目的其他公司没有质量方针。小江应该 ______ 。",[117,119,121,123],{"key":20,"text":118,"correct":22},"用A公司的质量方针，因为A公司是总承包商",{"key":24,"text":120,"correct":22},"不考虑项目质量方面的事情，因为多数公司都没有质量方针",{"key":27,"text":122,"correct":22},"与来自各个公司的核心成员一起制订这个项目的质量方针，同时不告诉任何其他人以消除负面反应",{"key":30,"text":124,"correct":32},"从所有参与该项目的公司中寻找支持来建立一个质量计划",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":20,"analysis":33},389075,"有关质量计划的编制，______是正确的。",[129,131,133,135],{"key":20,"text":130,"correct":32},"在整个项目的生命周期，应当定期进行质量计划的编制工作",{"key":24,"text":132,"correct":22},"编制质量计划是编制范围说明书的前提",{"key":27,"text":134,"correct":22},"仅在编制项目计划时，进行质量计划的编制",{"key":30,"text":136,"correct":22},"在项目的执行阶段，不再考虑质量计划的编制",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":24,"analysis":33},389076,"某OA系统处于试运行阶段，用户反映不能登录，承建方现场工程师需要对导致该问题的各种原因进行系统分析，使用 （ ） 工具比较合适。",[141,142,144,145],{"key":20,"text":45,"correct":22},{"key":24,"text":143,"correct":32},"因果图",{"key":27,"text":41,"correct":22},{"key":30,"text":108,"correct":22},{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":27,"analysis":33},389077,"制定质量管理计划的主要依据是质量方针、项目范围说明书、产品描述以及（ ） 。",[150,152,154,156],{"key":20,"text":151,"correct":22},"质量检查表",{"key":24,"text":153,"correct":22},"过程改进计划",{"key":27,"text":155,"correct":32},"质量标准与规则",{"key":30,"text":157,"correct":22},"需求变更请求",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":20,"analysis":33},389078,"项目质量管理通过质量规划、质量保证、质量控制程序和过程以及连续的过程改进活动来实现，其中（ ）关注项目执行过程中的质量。",[162,164,166,168],{"key":20,"text":163,"correct":32},"质量保证",{"key":24,"text":165,"correct":22},"质量规划",{"key":27,"text":167,"correct":22},"质量控制",{"key":30,"text":169,"correct":22},"质量改进",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":24,"analysis":33},389079,"项目实施过程中，围绕对项目质量的监控、追踪管理，以下做法不正确的是 （ ）",[174,176,178,180],{"key":20,"text":175,"correct":22},"可采用控制图来对质量进行监控",{"key":24,"text":177,"correct":32},"使用挣值分析来对质量进行监控",{"key":27,"text":179,"correct":22},"通过分析测试报告来对质量进行监控",{"key":30,"text":181,"correct":22},"通过分析施工日志中的施工参数来对质量进行监控",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":20,"analysis":33},389080,"项目质量的形成过程，体现了从目标决策到目标细化再到目标实现的过程，而质量目标的决策是 （ ） 的职能",[186,188,190,192],{"key":20,"text":187,"correct":32},"建设单位",{"key":24,"text":189,"correct":22},"设计单位",{"key":27,"text":191,"correct":22},"监理单位",{"key":30,"text":193,"correct":22},"项目总承包单位",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":30,"analysis":33},389081,"质量控制的方法、技术和工具有很多，（ ）直观地反映了项目中可能出现的问题与各种潜在原因之间的关系。",[198,199,200,201],{"key":20,"text":45,"correct":22},{"key":24,"text":41,"correct":22},{"key":27,"text":43,"correct":22},{"key":30,"text":202,"correct":32},"鱼骨图",{"id":204,"libraryId":5,"type":15,"typeLabel":16,"stem":205,"options":206,"answer":30,"analysis":33},389082,"（ ）可以作为项目质量控制中问题识别和问题分析的工具。",[207,209,210,212],{"key":20,"text":208,"correct":22},"帕累托分析",{"key":24,"text":39,"correct":22},{"key":27,"text":211,"correct":22},"核对表",{"key":30,"text":213,"correct":32},"因果分析",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},389083,"下列选项中，不属于质量控制工具的是 （ ） 。",[218,220,222,223],{"key":20,"text":219,"correct":32},"甘特图",{"key":24,"text":221,"correct":22},"趋势分析",{"key":27,"text":43,"correct":22},{"key":30,"text":143,"correct":22},{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":30,"analysis":33},389084,"确定适用于项目的质量标准并决定如何满足这些标准是（ ）的过程。",[228,230,231,233],{"key":20,"text":229,"correct":22},"质量目标",{"key":24,"text":163,"correct":22},{"key":27,"text":232,"correct":22},"质量方针",{"key":30,"text":234,"correct":32},"质量计划",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":30,"analysis":33},389085,"对质量管理活动进行结构性审查，决定一个项目质量活动是否符合组织政策、过程和程序的独立的评估活动称为 （ ） 。",[239,240,241,243],{"key":20,"text":67,"correct":22},{"key":24,"text":65,"correct":22},{"key":27,"text":242,"correct":22},"整体审计",{"key":30,"text":69,"correct":32},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":24,"analysis":33},389086,"公司要求项目团队中的成员能够清晰地看到与自己相关的所有活动以及和某个活动相关的所有成员。项目经理在编制该项目人力资源计划时应该选用的组织结构图类型是 （ ） 。",[248,250,252,254],{"key":20,"text":249,"correct":22},"层次结构图",{"key":24,"text":251,"correct":32},"矩阵图",{"key":27,"text":253,"correct":22},"树形图",{"key":30,"text":255,"correct":22},"文本格式描述",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":24,"analysis":33},389087,"为了成功管理一个项目，项目经理必须承担管理者和领导者的双重角色。作为管理者的角色，下面的选项中，除______外，都是项目经理应重点关注的。",[260,262,264,266],{"key":20,"text":261,"correct":22},"制订流程",{"key":24,"text":263,"correct":32},"团结人员",{"key":27,"text":265,"correct":22},"为项目干系人提供所需要的成果",{"key":30,"text":267,"correct":22},"关注组织及其机构",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":27,"analysis":33},389088,"项目经理在选择团队建设具体活动时，可考虑专门的活动或个人行为。活动的首要目的是提高团队绩效。 （ ） 不属于团队建设活动。",[272,274,276,278],{"key":20,"text":273,"correct":22},"为平息冲突制订规则",{"key":24,"text":275,"correct":22},"项目经理在网上为团队成员组建一个工作群",{"key":27,"text":277,"correct":32},"定期召开会议，评价团队绩效",{"key":30,"text":279,"correct":22},"集中办公",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":24,"analysis":33},389089,"某公司项目经理在管理一个项目时，怀疑有项目组成员曾将客户内部信息泄露给客户的一个竞争对手，项目经理此时较恰当的做法是 （ ） 。",[284,286,288,290],{"key":20,"text":285,"correct":22},"与项目组成员讨论此问题",{"key":24,"text":287,"correct":32},"提醒团队成员注意并制订预防措施",{"key":27,"text":289,"correct":22},"与其他项目组经理讨论此问题",{"key":30,"text":291,"correct":22},"更换项目组成员",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":24,"analysis":33},389090,"一些公司为了满足公司员工社会交往的需要会经常组织一些聚会和社会活动，还为没有住房的员工提供住处。这种激励员工的理论属于（ ） 。",[296,298,300,302],{"key":20,"text":297,"correct":22},"赫茨伯格的双因素理论",{"key":24,"text":299,"correct":32},"马斯洛需要层次理论",{"key":27,"text":301,"correct":22},"期望理论",{"key":30,"text":303,"correct":22},"X理论和Y理论",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":24,"analysis":33},389091,"有效的团队建设的直接结果是_____ 。",[308,310,312,314],{"key":20,"text":309,"correct":22},"提高了项目绩效",{"key":24,"text":311,"correct":32},"建设成一个高效、运行良好的项目团队",{"key":27,"text":313,"correct":22},"使项目小组成员认识到对项目的绩效负责的是项目经理",{"key":30,"text":315,"correct":22},"提高了项目干系人和小组成员为项目贡献力量的能力",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":20,"analysis":33},389092,"冲突管理中最有效的解决冲突方法是 （ ） 。",[320,322,324,326],{"key":20,"text":321,"correct":32},"问题解决",{"key":24,"text":323,"correct":22},"求同存异",{"key":27,"text":325,"correct":22},"强迫",{"key":30,"text":327,"correct":22},"撤退",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":24,"analysis":33},389093,"（）不是组建项目团队的工具和技术。",[332,334,336,338],{"key":20,"text":333,"correct":22},"事先分派",{"key":24,"text":335,"correct":32},"资源日历",{"key":27,"text":337,"correct":22},"采购",{"key":30,"text":339,"correct":22},"虚拟团队",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":24,"analysis":33},389094,"（ ） 不是组建项目团队的工具和技术。",[344,345,346,347],{"key":20,"text":333,"correct":22},{"key":24,"text":335,"correct":32},{"key":27,"text":337,"correct":22},{"key":30,"text":339,"correct":22},{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":30,"analysis":33},389095,"某ERP项目的生产管理子系统进行安装调试时，项目经理发现车间操作员的实际操作方式与最初客户确定的操作方式有较大不同。为了解决这个问题，首先应 （ ） 。",[352,354,356,358],{"key":20,"text":353,"correct":22},"说服车间操作员按确定的操作方式实施",{"key":24,"text":355,"correct":22},"说服客户代表修改最初确定的需求",{"key":27,"text":357,"correct":22},"由项目经理汇报给高层领导决定",{"key":30,"text":359,"correct":32},"召开协调会议，请客户代表和车间操作员共同参加，分析原因协商解决",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":27,"analysis":33},389096,"在当今高科技环境下，为了成功激励一个团队，_____可以被项目管理者用来保持一个气氛活跃、高效的士气。",[364,366,368,370],{"key":20,"text":365,"correct":22},"马斯洛理论和X理论",{"key":24,"text":367,"correct":22},"Y理论和X理论",{"key":27,"text":369,"correct":32},"Y理论、马斯洛理论和赫兹伯格的卫生理论",{"key":30,"text":371,"correct":22},"赫兹伯格的卫生理论和X理论",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":24,"analysis":33},389097,"马斯洛需求理论中荣誉性的奖励，形象、地位的提升属于（ ）",[376,378,380,382],{"key":20,"text":377,"correct":22},"生理需求",{"key":24,"text":379,"correct":32},"受尊重的需求",{"key":27,"text":381,"correct":22},"自我实现的需求",{"key":30,"text":383,"correct":22},"社会交往的需求",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":27,"analysis":33},389098,"在组建项目团队时，人力资源要满足项目要求。以下说法， 是不妥当的。",[388,390,392,394],{"key":20,"text":389,"correct":22},"对关键岗位要有技能标准，人员达标后方可聘用",{"key":24,"text":391,"correct":22},"与技能标准有差距的员工进行培训，合格后可聘用",{"key":27,"text":393,"correct":32},"只要项目经理对团队成员认可就可以",{"key":30,"text":395,"correct":22},"在组建团队时要考虑能力、经验、兴趣、成本等人员因素",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":30,"analysis":33},389099,"团队建设一般要经历几个阶段，这几个阶段的大致顺序是（）。",[400,402,404,406],{"key":20,"text":401,"correct":22},"震荡期、形成期、正规期、表现期",{"key":24,"text":403,"correct":22},"形成期、震荡期、表现期、正规期",{"key":27,"text":405,"correct":22},"表现期、震荡期、形成期、正规期",{"key":30,"text":407,"correct":32},"形成期、震荡期、正规期、表现期",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":24,"analysis":33},389100,"赫兹伯格的双因素激励理论中的激励因素类似于马斯洛的需求层次理论中的“（ ）”。",[412,414,416,418],{"key":20,"text":413,"correct":22},"安全和自我实现",{"key":24,"text":415,"correct":32},"尊重和自我实现",{"key":27,"text":417,"correct":22},"安全和社会认可",{"key":30,"text":419,"correct":22},"社会认可和尊重",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":27,"analysis":33},389101,"在当今高科技环境下，为了成功激励一个IT项目团队， （ ） 可以被项目经理用来激励项目团队保持气氛活跃、高效率的士气。",[424,426,428,430],{"key":20,"text":425,"correct":22},"期望理论和X理论",{"key":24,"text":427,"correct":22},"Y理论和马斯洛理论",{"key":27,"text":429,"correct":32},"Y理论、期望理论和赫兹伯格的卫生理论",{"key":30,"text":431,"correct":22},"赫兹伯格的卫生理论和期望理论",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":24,"analysis":33},389102,"在某软件开发项目中，项目经理发现年轻开发人员流动的流失较为严重，导致项目进行中花费大量时间进行招聘、任务交接和善后处理。下列选项中无法改善人员流失状况的是（ ） 。",[436,438,440,442],{"key":20,"text":437,"correct":22},"通过了解项目团员的感情，预测其行动，了解其后顾之忧，并尽力帮助他们解决问题",{"key":24,"text":439,"correct":32},"为了项目的完成，考虑到有限的人力资源，将该项目分包，在时限内完成项目",{"key":27,"text":441,"correct":22},"拨出专门团队建设经费，并鼓励团队内非正式的沟通和活动",{"key":30,"text":443,"correct":22},"建立培训和知识共享机制，使得所有的团队成员都可以学习到新的知识以及能够互相帮助",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":30,"analysis":33},389103,"小王作为项目经理正在带领项目团队实施一个新的信息系统集成项目。项目团队已经共同工作了相当一段时间，正处于项目团队建设的发挥阶段，此时一个新成员加入了该团队，此时 （ ） 。",[448,450,452,454],{"key":20,"text":449,"correct":22},"团队建设将从震荡阶段重新开始",{"key":24,"text":451,"correct":22},"团队将继续处于发挥阶段",{"key":27,"text":453,"correct":22},"团队建设将从震荡阶段重新开始，但很快就会步入发挥阶段",{"key":30,"text":455,"correct":32},"团队建设将从形成阶段重新开始",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":20,"analysis":33},389104,"系统组织结构与功能分析中，可以采用多种工具，其中 （ ） 描述了业务和部门的关系。",[460,462,464,466],{"key":20,"text":461,"correct":32},"组织\u002F业务关系图",{"key":24,"text":463,"correct":22},"业务功能一览图",{"key":27,"text":465,"correct":22},"组织结构图",{"key":30,"text":467,"correct":22},"物资流图",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":24,"analysis":33},389105,"人力资源计划编制的输出不包括 （ ） 。",[472,474,476,478],{"key":20,"text":473,"correct":22},"角色和职责",{"key":24,"text":475,"correct":32},"人力资源模板",{"key":27,"text":477,"correct":22},"项目的组织结构图",{"key":30,"text":479,"correct":22},"人员配备管理计划",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":27,"analysis":33},389107,"项目经理小丁负责一个大型项目的管理工作，目前因人手紧张只有15个可用的工程师，因为其他工程师已经被别的项目占用。这15个工程师可用时间不足所需时间的一半，并且小丁也不能说服管理层改变这个大型项目的结束日期。在这种情况下，小丁应该 （ ） 。",[484,486,488,490],{"key":20,"text":485,"correct":22},"与团队成员协调必要的加班，以便完成工作",{"key":24,"text":487,"correct":22},"告诉团队成员他们正在从事一项很有意义的工作，以激发他们的积极性",{"key":27,"text":489,"correct":32},"征得管理层同意，适当削减工作范围，优先完成项目主要工作",{"key":30,"text":491,"correct":22},"使用更有经验的资源，以更快地完成工作",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":27,"analysis":33},389108,"某公司任命小王为某信息系统开发项目的项目经理。小王组建的团队经过一段时间的磨合，成员之间项目熟悉和了解。矛盾基本解决，项目经理能够得到团队的认可。由于项目进度落后，小王又向公司提出申请，项目组加入了2名新成员。此时项目团队处于（ ）。",[496,498,500,502],{"key":20,"text":497,"correct":22},"震荡阶段",{"key":24,"text":499,"correct":22},"发挥阶段",{"key":27,"text":501,"correct":32},"形成阶段",{"key":30,"text":503,"correct":22},"规范阶段",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":27,"analysis":33},389109,"在组建项目团队时，人力资源要满足项目要求。以下说法中，（ ） 是不妥当的。",[508,509,510,511],{"key":20,"text":389,"correct":22},{"key":24,"text":391,"correct":22},{"key":27,"text":393,"correct":32},{"key":30,"text":395,"correct":22},{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":30,"analysis":33},389110,"某机房工程公司承接了一个大型机房的UPS工程，公司项目经理组建了工作团队，施工过程中，项目经理发现了一个熟练电工一时大意，未按照规范端接电池连线，极可能造成严重的安全事故，从团队管理角度，此时项目经理最应该 （ ） 。",[516,518,520,522],{"key":20,"text":517,"correct":22},"开除该名员工，并组织相关人员进行安全教育和培训",{"key":24,"text":519,"correct":22},"与该名电工私下交流，使其认识该问题的严重性，促其自行改正",{"key":27,"text":521,"correct":22},"怕业主方知道后造成严重影响，因此私下通知其他电工改正",{"key":30,"text":523,"correct":32},"要求该电工立即改正，并召集相关人员，指出错误并批评教育，使大家引以为戒",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":30,"analysis":33},389111,"以下关于项目团队管理的叙述中，（ ）是不正确的。",[528,530,532,534],{"key":20,"text":529,"correct":22},"项目团队管理的目的是跟踪个人和团队的绩效，反馈和解决问题以提高项目绩效",{"key":24,"text":531,"correct":22},"可采用观察和交谈、项目绩效评估的方法实现对项目团队的管理",{"key":27,"text":533,"correct":22},"一个企业中的组织文化可能会影响团队管理的方式和结果",{"key":30,"text":535,"correct":32},"项目经理在团队发生冲突时应本着解决矛盾的原则进行调解",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":24,"analysis":33},389112,"组建团队是指获得人力资源的过程，项目管理团队应确保所选择的人力资源可以达到项目的要求。在此要求下，组建项目团队需要的输入应包括 （ ） 。① 角色和责任；② 资源日历；③ 项目的组织结构图；④ 环境和组织因素；⑤ 项目人员分配",[540,542,544,546],{"key":20,"text":541,"correct":22},"①②③",{"key":24,"text":543,"correct":32},"①③④",{"key":27,"text":545,"correct":22},"②③⑤",{"key":30,"text":547,"correct":22},"③④⑤",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":27,"analysis":33},389115,"在当今高科技环境下，为了成功激励一个团队， （ ） 可以被项目管理者用来保持一个气氛活跃、高效的士气。",[552,553,554,555],{"key":20,"text":365,"correct":22},{"key":24,"text":367,"correct":22},{"key":27,"text":369,"correct":32},{"key":30,"text":371,"correct":22},{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":27,"analysis":33},389116,"对于一个新分配来的项目团队成员，（）应该负责确保他得到适当的培训。",[560,562,564,566],{"key":20,"text":561,"correct":22},"项目发起人",{"key":24,"text":563,"correct":22},"职能经理",{"key":27,"text":565,"correct":32},"项目经理",{"key":30,"text":567,"correct":22},"培训协调员",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":20,"analysis":33},389117,"项目团队成员因项目优先级和资源分配等原因出现冲突时，项目经理首选的冲突的方法是 （ ） 。",[572,574,576,577],{"key":20,"text":573,"correct":32},"解决问题",{"key":24,"text":575,"correct":22},"妥协",{"key":27,"text":323,"correct":22},{"key":30,"text":578,"correct":22},"暂时搁置问题",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":24,"analysis":33},389119,"沟通、领导和磋商是属于 （ ） 的技能。",[583,585,587,589],{"key":20,"text":584,"correct":22},"项目管理",{"key":24,"text":586,"correct":32},"一般管理",{"key":27,"text":588,"correct":22},"团队管理",{"key":30,"text":590,"correct":22},"执行管理",[592,596,599,602,605,608],{"id":593,"name":594,"category":7,"favorite":595},136,"法律职业试卷二(客观题 )",2,{"id":597,"name":598,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":600,"name":601,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":603,"name":604,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":606,"name":607,"category":7,"favorite":8},28,"安全工程师",{"id":609,"name":610,"category":7,"favorite":8},112,"安全生产法律知识"]