[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":614},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,16,50,1856,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,525,536,548,560,572,582,591,603],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},388965,1,"单选题","一份完整的项目绩效报告应该包含的内容有：项目的进展和执行情况、成本的使用情况、团队成员的绩效情况、 （ ） 。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","变更后的项目计划、项目存在的问题及解决措施",false,{"key":24,"text":25,"correct":22},"B","变更后的项目计划、对项目的预测",{"key":27,"text":28,"correct":22},"C","干系人沟通需求、需求变更",{"key":30,"text":31,"correct":32},"D","项目存在的问题及解决措施、对项目的预测",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},388967,"我公司承包了一个工程，项目总预算是100W，管理储备是20万，应急储备是20W，下列正确的是（ ）",[38,40,42,44],{"key":20,"text":39,"correct":22},"管理储备是用来应对已知未知风险的应急时间或应急资金。",{"key":24,"text":41,"correct":22},"应急储备是用来应对未知未知风险的应急时间或应急资金。",{"key":27,"text":43,"correct":32},"在项目进行中，项目经理可以动用应急储备。",{"key":30,"text":45,"correct":22},"BAC=100W",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},388968,"项目经理刚刚完成一个小项目的启动阶段，开始步入计划编制阶段，这时，公司主管经营的副总经理向项目经理索要项目预算和成本基准计划。该项目经理较恰当的回答是（ ） 。",[50,52,54,56],{"key":20,"text":51,"correct":22},"可以在项目章程中找到项目预算，项目章程刚刚做完",{"key":24,"text":53,"correct":32},"在计划编制阶段完成之前，项目预算和基准计划是不能最终确定的",{"key":27,"text":55,"correct":22},"项目计划将不包括项目预算和基准计划，这是个小项目",{"key":30,"text":57,"correct":22},"在制订项目计划之前不可能完成估算",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},388969,"王工是一个大型智能建设项目的造价工程师。为准备预算，基于类似项目创建了一个模板，可以用于3～25层建筑物成本预算。它把成本分解成每平方米墙壁、地面、窗户、公用工程的成本。这属于：",[62,64,66,68],{"key":20,"text":63,"correct":22},"以量化为基础的估算",{"key":24,"text":65,"correct":32},"参数模型估算",{"key":27,"text":67,"correct":22},"自上而下的估算",{"key":30,"text":69,"correct":22},"类比估算",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},388970,"项目经理在运行预算方案编制时，收集到的基础数据如下：工作包的成本估算为40万元；工作包的应急储备金为4万元；管理储备金为2万元。该项目的成本基准是（ ）万元。",[74,76,78,80],{"key":20,"text":75,"correct":22},"40",{"key":24,"text":77,"correct":32},"44",{"key":27,"text":79,"correct":22},"42",{"key":30,"text":81,"correct":22},"46",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},388971,"DIPP分析法可用于对处在不同阶段的项目进行比较，同时可以表明项目的资源利用情况DIPP=EMV\u002FETC。如果有 A、 B、 C、D四个项目，项目初期的DIPP值分别为：DIPP (A)=0.9、DIPP (B)=1.3、DIPP (C)=0.8、DIPP (D)=1.2，则优先选择的项目为（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"项目A",{"key":24,"text":89,"correct":32},"项目B",{"key":27,"text":91,"correct":22},"项目C",{"key":30,"text":93,"correct":22},"项目D",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},388972,"某信息系统集成项目的预算为5050000元，工期6周。某时间点，该项目花了1550000元完成了预计要花1690000元的工作，而计划成本是2110000元。则该项目的实际成本 （ ） 。",[98,100,102,104],{"key":20,"text":99,"correct":32},"低于预算",{"key":24,"text":101,"correct":22},"超出预算",{"key":27,"text":103,"correct":22},"符合预算",{"key":30,"text":105,"correct":22},"提供的信息不足，无法判断",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":30,"analysis":33},388973,"项目进行到某阶段时，项目经理进行了绩效分析，计算出CPI值为0.91。这表示：",[110,112,114,116],{"key":20,"text":111,"correct":22},"项目的每91元人民币投资中可创造相当于100元的价值",{"key":24,"text":113,"correct":22},"当项目完成时将会花费投资额的91%",{"key":27,"text":115,"correct":22},"项目仅进展到计划进度的91%",{"key":30,"text":117,"correct":32},"项目的每100元人民币投资中只创造相当于91元的价值",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},388974,"绩效报告是项目沟通管理中的重要过程，包括收集并分发有关项目绩效信息给干系人。收集和分发的绩效信息包括 （ ） 、进展报告和预测。",[122,124,126,128],{"key":20,"text":123,"correct":32},"状态报告",{"key":24,"text":125,"correct":22},"状态评审结果",{"key":27,"text":127,"correct":22},"问题日志",{"key":30,"text":129,"correct":22},"工作说明书",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":30,"analysis":33},388975,"甲公司生产急需5000个零件，承包给乙工厂进行加工，每个零件的加工费预算为20元，计划2周(每周工作5天)完成。甲公司负责人在开工后第9个工作日的早上到乙工厂检查进度，发现已完成加工3600个零件，支付款项81000元。经计算，______。",[134,136,138,140],{"key":20,"text":135,"correct":22},"该项目的费用偏差为-18000元",{"key":24,"text":137,"correct":22},"该项目的进度偏差为-18000元",{"key":27,"text":139,"correct":22},"该项目的CPI为0.80",{"key":30,"text":141,"correct":32},"该项目的SPI为0.90",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},388976,"为工作包建立控制账户，并根据“账户编码”分配标记号是创建工作分解结构的最后步预。控制账户 （ ）",[146,148,150,152],{"key":20,"text":147,"correct":22},"不是构成汇总成本、进度和资源信息的单元",{"key":24,"text":149,"correct":32},"是一种控制点，项目的范围、成本和进度在该点被整合",{"key":27,"text":151,"correct":22},"是设置在工作分解结构的特定技术节点",{"key":30,"text":153,"correct":22},"只包括一个工作包",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},388977,"项目经理小张对自己正在做的一个项目进行成本挣值分析后，画出了如下所示的一张图，当前时间为图中的检查日期。根据该图小张分析：该项目成本 （ ） 。",[158,160,162,164],{"key":20,"text":159,"correct":22},"正常",{"key":24,"text":161,"correct":32},"超支",{"key":27,"text":163,"correct":22},"节约",{"key":30,"text":165,"correct":22},"无法判断",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},388978,"下表是某项目执行过程中的输出表格， （ ） 说法是不正确的。",[170,172,174,176],{"key":20,"text":171,"correct":22},"该表是项目执行过程中的一份绩效报告",{"key":24,"text":173,"correct":22},"该表缺少对子项目进展的预测",{"key":27,"text":175,"correct":32},"根据此表可以分析出该项目的实际成本低于预算成本",{"key":30,"text":177,"correct":22},"根据此表可以分析出该项目的实际进度落后于计划",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":30,"analysis":33},388979,"某项目计划投资1000万元，经过估算，投产后每年的净收益为200万元，则该项目的静态投资回收期为5年，如果考虑到资金的时间价值，假设贴现率为10%，那么该项目的动态投资回收期 （ ） 。",[182,184,186,188],{"key":20,"text":183,"correct":22},"小于5年",{"key":24,"text":185,"correct":22},"大于5年，小于6年",{"key":27,"text":187,"correct":22},"大于6年，小于7年",{"key":30,"text":189,"correct":32},"大于7年",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},388980,"下表为一个即将投产项目的计划收益表，经计算，该项目的投资回收期是 （ ） 。",[194,196,198,200],{"key":20,"text":195,"correct":22},"4.30",{"key":24,"text":197,"correct":32},"5.73",{"key":27,"text":199,"correct":22},"4.73",{"key":30,"text":201,"correct":22},"5.30",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":30,"analysis":33},388981,"项目成本控制是指 （ ） 。",[206,208,210,212],{"key":20,"text":207,"correct":22},"对成本费用的趋势及可能达到的水平所做的分析和推断",{"key":24,"text":209,"correct":22},"预先规定计划期内项目施工的耗费和成本要达到的水平",{"key":27,"text":211,"correct":22},"确定各个成本项比预计要达到的目标成本的降低额和降低度",{"key":30,"text":213,"correct":32},"在项目过程中，对形成成本的要素进行监督和调节",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},388982,"某软件公司项目的利润分析如下表所示。设贴现率为10%，则第二年结束时的利润总额净现值为_____ 元",[218,220,222,224],{"key":20,"text":219,"correct":22},"231000",{"key":24,"text":221,"correct":32},"200000",{"key":27,"text":223,"correct":22},"220000",{"key":30,"text":225,"correct":22},"210000",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":27,"analysis":33},388983,"（ ） 不属于项目成本预算的输入。",[230,232,234,236],{"key":20,"text":231,"correct":22},"项目范围说明书",{"key":24,"text":233,"correct":22},"工作分解结构",{"key":27,"text":235,"correct":32},"项目资金需求",{"key":30,"text":237,"correct":22},"项目进度计划",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":30,"analysis":33},388984,"（ ） 不属于成本管理过程。",[242,244,246,248],{"key":20,"text":243,"correct":22},"资源计划过程",{"key":24,"text":245,"correct":22},"成本估计过程",{"key":27,"text":247,"correct":22},"成本预算过程",{"key":30,"text":249,"correct":32},"合同评审过程",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},388985,"当信息系统集成项目进入实施阶段后，一般不使用 （ ） 对项目进行监督和控制。",[254,256,258,260],{"key":20,"text":255,"correct":22},"挣值管理方法",{"key":24,"text":257,"correct":32},"收益分析方法",{"key":27,"text":259,"correct":22},"项目管理信息系统",{"key":30,"text":261,"correct":22},"专家判断方法",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":30,"analysis":33},388986,"项目由15个单独的子项目构成，为了便于管理，公司为这个项目成立了一个项目管理办公室（PMO），且给这个办公室配备了一个项目管理信息系统，这个系统要包括所有与项目有关的信息，并且系统中的数据可以随时更新，要完成这个管理信息系统，需要收集这15个项目所有工作的相关信息，这些信息构成了 （ ） 的全部内容。",[266,268,270,272],{"key":20,"text":267,"correct":22},"项目会计表",{"key":24,"text":269,"correct":22},"工作分解结构（WBS）词典",{"key":27,"text":271,"correct":22},"工作分解结构（WBS）模板",{"key":30,"text":273,"correct":32},"挣值管理报告",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":20,"analysis":33},388987,"下列各图描述了DIPP值随着项目进行时间的变化，其中正确的是 （ ） 。",[278,280,282,284],{"key":20,"text":279,"correct":32},"见题干A图",{"key":24,"text":281,"correct":22},"见题干B图",{"key":27,"text":283,"correct":22},"见题干C图",{"key":30,"text":285,"correct":22},"见题干D图",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":27,"analysis":33},388988,"绩效评价主要采用成本效益分析法、比较法、因素分析法、最低成本法、公众评判法等方法。下列叙述中属于成本效益分析法的是 （ ） 。",[290,292,294,296],{"key":20,"text":291,"correct":22},"通过综合分析影响绩效目标实现，实施效果的内外因素，评价绩效目标实现程度",{"key":24,"text":293,"correct":22},"通过专家评估，公众问卷及抽样调查等对项目支出效果进行评判，评价绩效目标实现程度",{"key":27,"text":295,"correct":32},"将一定时期内的支出与效益进行对比分析以评价绩效目标实现程度",{"key":30,"text":297,"correct":22},"通过对绩效目标与实施效果。历史或当前情况，不同部门和地区同类项目的比较，综合分析绩效目标实现程度",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},388989,"下图是一项布线工程计划和实际完成的示意图，2009年3月23日的PV、EV、AC分别是 ：",[302,304,306,308],{"key":20,"text":303,"correct":32},"PV=4000元、EV=2000元、AC=3800元",{"key":24,"text":305,"correct":22},"PV=4000元、EV=3800元、AC=2000元",{"key":27,"text":307,"correct":22},"PV=3800元、EV=4000元、AC=2000元",{"key":30,"text":309,"correct":22},"PV=3800元、EV=3800元、AC=2000元",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},388990,"某企业有一投资方案，每天生产某种设备1500台，生成成本每台700元，预计售价每台1800元，估算投资额为800万元，该投资方案寿命为7年，假设年产量，每台售价和投资额均有可能在?20%的范围内变动，就这三个不确定因素对投资回收期的敏感性分析得到了下表中的部分投资回收期数据（空缺部分尚未计算），根据投资回收期的计算结果可知，这三个不确定性因素中， （ ） 是高风险因素（可能导致投资风险）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"年产量",{"key":24,"text":317,"correct":32},"每台售价",{"key":27,"text":319,"correct":22},"投资额",{"key":30,"text":321,"correct":22},"全部",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},388991,"项目每个阶段结束时的一个重要工作是进行项目绩效评审，评审的主要目标是（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":32},"决定项目是否能够进入下一个阶段",{"key":24,"text":329,"correct":22},"根据过去的绩效调整项目的进度和成本基准",{"key":27,"text":331,"correct":22},"评定员工业绩和能力",{"key":30,"text":333,"correct":22},"得到客户对项目绩效认同",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":30,"analysis":33},388992,"（ ） 不是绩效报告应当包含的内容。",[338,340,342,344],{"key":20,"text":339,"correct":22},"绩效目标及其设立依据",{"key":24,"text":341,"correct":22},"分析说明为完成项目目标及其原因",{"key":27,"text":343,"correct":22},"对预算年度内目标完成情况进行总结",{"key":30,"text":345,"correct":32},"项目计划网络图",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":27,"analysis":33},388993,"下表为同时开展的4个项目在某个时刻的计划值PV、实际成本AC和挣值EV，该时刻成本超出最多的项目和进度最为落后的项目分别是_____。",[350,352,354,356],{"key":20,"text":351,"correct":22},"项目1，项目1",{"key":24,"text":353,"correct":22},"项目3，项目2",{"key":27,"text":355,"correct":32},"项目4，项目4",{"key":30,"text":357,"correct":22},"项目2，项目4",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":30,"analysis":33},388994,"某项目计划分为立项、实施和运维三个阶段。财务部给该项目的预算金额不超过80万元。项目经理估算立项阶段的成本为20万元，实施阶段的成本为50万元，运维阶段的成本为30万元。若用自底向上法对该项目的成本进行估算，则估算值应为 （ ） 万元。",[362,364,366,368],{"key":20,"text":363,"correct":22},"70",{"key":24,"text":365,"correct":22},"80",{"key":27,"text":367,"correct":22},"90",{"key":30,"text":369,"correct":32},"100",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},388995,"用于信息系统开发的各类资源总是有限的，当这些有限资源无法同时满足全部应用项目的实施时，就应该对这些应用项目的优先顺序给予合理分配。人们提出了若干用于分配开发信息系统稀少资源的方法，并对每种方法都提出了相应的决策基本标准。其中 （ ） 的基本思想是对各应用项目不仅要分别进行评价，而且还应该把他们作为实现系统总体方案的组成部分去评价。该方法应该考虑项目的风险性、对组织的战略方向的支持等因素。",[374,376,378,380],{"key":20,"text":375,"correct":32},"全面评审法",{"key":24,"text":377,"correct":22},"成本或效益比较法",{"key":27,"text":379,"correct":22},"收费法",{"key":30,"text":381,"correct":22},"指导委员会法",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":27,"analysis":33},388996,"在进行挣值管理时，如果实际进度点位于PV曲线的左侧，则该点与PV曲线的垂直距离表示实际进度比计划进度 （ ） 。",[386,388,390,392],{"key":20,"text":387,"correct":22},"超前的时间",{"key":24,"text":389,"correct":22},"拖后的时间",{"key":27,"text":391,"correct":32},"超额完成的任务量",{"key":30,"text":393,"correct":22},"拖欠的任务量",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":24,"analysis":33},388997,"现有一项目投资12万元，在3月末时进行评估时发现，完成30%的工作量，花费了2万元，项目计划工期1年。下列描述中正确的是 （ ） 。",[398,400,402,404],{"key":20,"text":399,"correct":22},"成本已经超支",{"key":24,"text":401,"correct":32},"节约了成本",{"key":27,"text":403,"correct":22},"不能判断",{"key":30,"text":405,"correct":22},"以上都不正确",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":30,"analysis":33},388998,"某个项目的预算是3000万元，工期为5个月，现在过去了3个月，实际成本1800万元，项目进度和绩效都符合计划，而且这种情况也会持续下去，则再过3个月，项目的EV是（45）万元。",[410,412,414,416],{"key":20,"text":411,"correct":22},"1800",{"key":24,"text":413,"correct":22},"2400",{"key":27,"text":415,"correct":22},"1200",{"key":30,"text":417,"correct":32},"3000",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":27,"analysis":33},388999,"以下关于成本估算的说法错误的是 （ ） 。",[422,424,426,428],{"key":20,"text":423,"correct":22},"成本一般用货币单位（人民币、美元、欧元、日元）来表示",{"key":24,"text":425,"correct":22},"针对项目使用的所有资源来估算计划活动成本",{"key":27,"text":427,"correct":32},"一般不考虑关于风险应对方面的信息",{"key":30,"text":429,"correct":22},"估算完成每项计划活动所需的资源的近似成本",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":24,"analysis":33},389000,"某一项目，初始投资为2000万元，该项目从投产年开始每年的净收益如下表所示，则该项目的静态投资回收期约为（ ）年。",[434,436,438,440],{"key":20,"text":435,"correct":22},"2.9",{"key":24,"text":437,"correct":32},"3.9",{"key":27,"text":439,"correct":22},"2.7",{"key":30,"text":441,"correct":22},"3.8",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":20,"analysis":33},389001,"成本基准是用来度量与检测项目成本绩效的按时间分配预算，下图中给出了某项目期望现金流、成本基准、资金需求情况，图中区间A应为 （ ） 。",[446,448,450,452],{"key":20,"text":447,"correct":32},"管理储备",{"key":24,"text":449,"correct":22},"成本偏差",{"key":27,"text":451,"correct":22},"进度偏差",{"key":30,"text":453,"correct":22},"超出成本",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":20,"analysis":33},389002,"以下关于项目绩效评估的表述，不正确的是_____ 。",[458,460,462,464],{"key":20,"text":459,"correct":32},"项目经理需要收集来源于项目内部和外部资源的正式和非正式的项目绩效评估",{"key":24,"text":461,"correct":22},"项目经理必须评估每一个团队成员",{"key":27,"text":463,"correct":22},"作为绩效评估的结果，一些团队成员在RAM（责任分配矩阵）中的角色将被调整",{"key":30,"text":465,"correct":22},"即使项目组织是临时的，项目评估也应列入到组织绩效评估中",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":27,"analysis":33},389003,"一个自动化设计团队应该熟悉最新的自动装配技术。团队可通过一系列的途径得到这种知识。它可以雇佣一个专门的项目问题专家，可以请一个顾问，可以将一个现有的工程师送去参加一个有关机器人的讲座或者请一个制造部门的人加入团队。每一种方法的相关成本必须在项目计划中给予考虑。这显示了 （ ） 的重要性。",[470,472,474,476],{"key":20,"text":471,"correct":22},"在完成活动定义前完成资源计划",{"key":24,"text":473,"correct":22},"保证一个资源分配矩阵被准备好并用做控制工具",{"key":27,"text":475,"correct":32},"通过活动资源估计和成本估计来准确地调整资源计划",{"key":30,"text":477,"correct":22},"将资源计划用做挣值的输入值",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":27,"analysis":33},389004,"对于系统集成企业而言，在进行项目核算时，一般将 （ ） 列入项目生命周期间发生的直接成本。 ①可行性研究费用 ②项目投标费用 ③监理费用 ④需求开发费用⑤设计费用 ⑥实施费用 ⑦验收费用",[482,484,486,488],{"key":20,"text":483,"correct":22},"①②④⑤⑥⑦",{"key":24,"text":485,"correct":22},"①③④⑤⑥⑦",{"key":27,"text":487,"correct":32},"④⑤⑥⑦",{"key":30,"text":489,"correct":22},"②④⑤⑥⑦",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},389005,"某软件企业2006年初计划投资2000万人民币开发某产品，预计从2007年开始盈利，各年产品销售额如表所示。根据表中的数据，该产品的动态投资回收期是 （ ） 年。（提示：设贴现率为0.1）",[494,496,498,500],{"key":20,"text":495,"correct":22},"2",{"key":24,"text":497,"correct":32},"2.1",{"key":27,"text":499,"correct":22},"2.4",{"key":30,"text":501,"correct":22},"3",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":30,"analysis":33},389006,"某正在进行中的项目，当前的PV=2200元、EV=2000元、AC=2500元，当前项目的SV和项目状态是 （ ）",[506,508,510,512],{"key":20,"text":507,"correct":22},"-300元；项目提前完成",{"key":24,"text":509,"correct":22},"+200元；项目提前完成",{"key":27,"text":511,"correct":22},"+8000元；项目按时完成",{"key":30,"text":513,"correct":32},"-200元；项目比原计划滞后",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":20,"analysis":33},389007,"某项目包含 A、 B、C三项主要活动，项目经理在成本估算时采用自下而上的方法，分别估算出三项活动的成本分别为13万元，23万元和8万元，同时为了应对未来可能遇到的不确定因素，预留了10万元的管理储备，同时为每个活动预留了2万元的准备金。项目进行到第二个月时，实际花费为20万元，完成总工作量的30%。如果项目按照当前绩效继续进展下去，预测项目的完工尚需成本ETC约为（ ）万元。",[518,520,522,524],{"key":20,"text":519,"correct":32},"46.7",{"key":24,"text":521,"correct":22},"40.7",{"key":27,"text":523,"correct":22},"45",{"key":30,"text":81,"correct":22},{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":20,"analysis":33},389008,"某软件企业2006年初计划投资2000万人民币开发某产品，预计从2007年开始盈利，各年产品销售额如表所示。根据表中的数据，该产品的静态投资回收期是 （ ） 年。（提示：设贴现率为0.1）",[529,531,533,534],{"key":20,"text":530,"correct":32},"1.8",{"key":24,"text":532,"correct":22},"1.9",{"key":27,"text":495,"correct":22},{"key":30,"text":535,"correct":22},"2.2",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":20,"analysis":33},389009,"根据下图，表示竣工费用超支情况的是 （ ） 。",[540,542,544,546],{"key":20,"text":541,"correct":32},"①",{"key":24,"text":543,"correct":22},"②",{"key":27,"text":545,"correct":22},"③",{"key":30,"text":547,"correct":22},"④",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":30,"analysis":33},389010,"公司承接了一个大型信息系统集成项目，项目参加人员121人，估计这一项目将在3年内建成。公司在开始这一项目之前，要决定这个项目的财务经济效益，并考虑资金的时间价值，则采用 （ ） 对项目进行财务绩效评估最合适。",[552,554,556,558],{"key":20,"text":553,"correct":22},"投资收益率法",{"key":24,"text":555,"correct":22},"投资回收期法",{"key":27,"text":557,"correct":22},"追加投资回收期法",{"key":30,"text":559,"correct":32},"内部收益率法",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":20,"analysis":33},389011,"某项目的利润预期（单位：元）如下表所示，贴现率为1 0%，则第三年结束时利润总额的净现值约为（ ）元",[564,566,568,570],{"key":20,"text":565,"correct":32},"30000",{"key":24,"text":567,"correct":22},"33000",{"key":27,"text":569,"correct":22},"36000",{"key":30,"text":571,"correct":22},"40444",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":27,"analysis":33},389012,"某项目包含 A、 B、C三项主要活动，项目经理在成本估算时采用自下而上的方法，分别估算出三项活动的成本分别为13万元，23万元和8万元，同时为了应对未来可能遇到的不确定因素，预留了10万元的管理储备，同时为每个活动预留了2万元的准备金。该项目的总预算为（57）万元。",[576,577,579,581],{"key":20,"text":77,"correct":22},{"key":24,"text":578,"correct":22},"54",{"key":27,"text":580,"correct":32},"60",{"key":30,"text":81,"correct":22},{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":27,"analysis":33},389013,"对项目的投资效果进行经济评价的方法，有静态分析法和动态分析法。 （ ） 属于动态分析法。",[586,587,588,589],{"key":20,"text":553,"correct":22},{"key":24,"text":555,"correct":22},{"key":27,"text":559,"correct":32},{"key":30,"text":590,"correct":22},"最小费用法",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":20,"analysis":33},389014,"（ ） 属于项目财务绩效评估的基本方法。",[595,597,599,601],{"key":20,"text":596,"correct":32},"动态分析法",{"key":24,"text":598,"correct":22},"预期效益分析法",{"key":27,"text":600,"correct":22},"风险调整贴现率法",{"key":30,"text":602,"correct":22},"因果图",{"id":604,"libraryId":5,"type":15,"typeLabel":16,"stem":605,"options":606,"answer":20,"analysis":33},389015,"某项目预计费用现值是1000万元人民币，效益现值是980万元人民币。如果采用“费用效益分析法”，可得出结论： （ ） 。",[607,609,611,612],{"key":20,"text":608,"correct":32},"不可投资",{"key":24,"text":610,"correct":22},"可投资",{"key":27,"text":403,"correct":22},{"key":30,"text":613,"correct":22},"费用效益分析法不适合项目论证",[615,619,622,625,628,631],{"id":616,"name":617,"category":7,"favorite":618},136,"法律职业试卷二(客观题 )",2,{"id":620,"name":621,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":623,"name":624,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":626,"name":627,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":629,"name":630,"category":7,"favorite":8},28,"安全工程师",{"id":632,"name":633,"category":7,"favorite":8},112,"安全生产法律知识"]