[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":613},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,15,50,1856,[13,34,46,58,70,82,94,106,118,129,141,153,165,177,189,201,213,225,237,249,261,273,285,296,308,320,332,344,356,368,380,392,400,412,424,436,446,458,470,482,494,506,518,530,542,554,566,578,590,602],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},388915,1,"单选题","项目经理在执行过程中收集了工作绩效数据，EV=3万，PV=6万，AC=4万，当前SPI和CPI分别是（ ）",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","SPI=50%，CPI=75%",true,{"key":24,"text":25,"correct":26},"B","SPI=50%，CPI=67%",false,{"key":28,"text":29,"correct":26},"C","SPI=67%，CPI=50%",{"key":31,"text":32,"correct":26},"D","SPI=67%，CPI=5%","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},388916,"项目Ⅰ、Ⅱ、Ⅲ、Ⅳ的工期都是三年，在第二年末其挣值分析数据如下表所示，按照趋势最早完工的应是项目 （ ） 。",[38,40,42,44],{"key":20,"text":39,"correct":26},"Ⅰ",{"key":24,"text":41,"correct":22},"Ⅱ",{"key":28,"text":43,"correct":26},"Ⅲ",{"key":31,"text":45,"correct":26},"Ⅳ",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},388917,"对项目进行审计是项目绩效评估的重要内容，以下关于项目绩效评估和审计的叙述中， （ ） 是不正确的。",[50,52,54,56],{"key":20,"text":51,"correct":26},"绩效审计是经济审计、效率审计、效果审计的合称",{"key":24,"text":53,"correct":26},"按审计时间分为事前审计、事中审计和事后审计",{"key":28,"text":55,"correct":22},"项目绩效评估主要通过定性对比分析，对项目运营效益进行综合评判",{"key":31,"text":57,"correct":26},"绩效评估以授权或委托的形式让独立的机构或个人来进行就是绩效审计",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},388918,"以下各项中，不能作为项目成本预算工具或技术的是：",[62,64,66,68],{"key":20,"text":63,"correct":26},"参数估算",{"key":24,"text":65,"correct":26},"资金限制平衡",{"key":28,"text":67,"correct":22},"净值分析",{"key":31,"text":69,"correct":26},"储备分析",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},388919,"任何组织的能力都是有限的，任何组织的资源也都是有限的。公司在选择项目优先级时经常用到DIPP分析法。以下关于DIPP的理解中，不正确的是（ ） 。",[74,76,78,80],{"key":20,"text":75,"correct":26},"DIPP值越高的项目资源利用率越高",{"key":24,"text":77,"correct":26},"DIPP值衡量了企业的资源利用效率",{"key":28,"text":79,"correct":22},"DIPP值越低的项目资源利用率越高",{"key":31,"text":81,"correct":26},"DIPP值是项目的期望货币值和完工尚需成本之比",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},388920,"分析成本构成结果，找出各种可以相互替代的成本，协调各种成本之间的关系，属于（ ） 的内容。",[86,88,90,92],{"key":20,"text":87,"correct":26},"识别和分析项目成本构成科目",{"key":24,"text":89,"correct":22},"成本估算",{"key":28,"text":91,"correct":26},"成本预算",{"key":31,"text":93,"correct":26},"成本审计",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},388921,"成本管理分为成本估算、成本预算和成本控制三个过程。以关于成本预算的叙述中，不正确的是（ ） 。",[98,100,102,104],{"key":20,"text":99,"correct":26},"成本预算过程完成后，可能会引起项目管理计划的更新",{"key":24,"text":101,"correct":22},"管理储备视为范围和成本的潜在变化而预留的预算，需要体现在项目成本基线里",{"key":28,"text":103,"correct":26},"成本基准计划可以作为度量项目绩效的依据",{"key":31,"text":105,"correct":26},"成本基准按时间分段计算，通常以S曲线的形式表示",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},388922,"按照沟通计划安排，项目经理在某财务控制点要根据挣值分析理论向财务总监提交绩效报告，下列绩效报告内容正确的是 （ ） 。",[110,112,114,116],{"key":20,"text":111,"correct":26},"按照控制账户中财务指标，对CPI CV BAC进行计算和分析并提出措施",{"key":24,"text":113,"correct":26},"根据控制点基线，对CPI CV SPI SV BAC进行计算和分析并提出措施",{"key":28,"text":115,"correct":26},"根据控制点基线，对CPI CV SPI SV ETC进行计算和分析并提出措施",{"key":31,"text":117,"correct":22},"按照控制账户中财务指标，汇报财务状态、进展报告，进行状态分析",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},388923,"能用于成本估算和成本预算的工具和技术是（ ）",[122,123,125,127],{"key":20,"text":69,"correct":22},{"key":24,"text":124,"correct":26},"群体决策技术",{"key":28,"text":126,"correct":26},"自上而下估算",{"key":31,"text":128,"correct":26},"自下而上估算",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":31,"analysis":33},388924,"（ ） 不属于项目财务绩效评估方法。",[133,135,137,139],{"key":20,"text":134,"correct":26},"投资收益率法",{"key":24,"text":136,"correct":26},"净现值法",{"key":28,"text":138,"correct":26},"内部收益率法",{"key":31,"text":140,"correct":22},"挣值分析法",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":28,"analysis":33},388925,"某软件企业2004年初计划投资1000万人民币开发一套中间件产品，预计从2005年开始，年实现产品销售收入1500万元，年市场销售成本1000万元。该产品的系统分析员张工根据财务总监提供的贴现率，制作了如下的产品销售现金流量表。根据表中的数据，该产品的动态投资回收期是 （ ） 年。",[145,147,149,151],{"key":20,"text":146,"correct":26},"1",{"key":24,"text":148,"correct":26},"2",{"key":28,"text":150,"correct":22},"2.27",{"key":31,"text":152,"correct":26},"2.73",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":31,"analysis":33},388926,"绩效报告的步骤包括收集并分发有关项目绩效的信息给项目干系人，这些步骤包括进度和状态报告、预测等。以下关于绩效报告的说法， （ ） 是错误的。",[157,159,161,163],{"key":20,"text":158,"correct":26},"状态报告介绍项目在某一特定时间点上所处的位置，要从达到的范围、时间和成本三项目标上讲明目前所处的状态",{"key":24,"text":160,"correct":26},"进度报告介绍项目组在一定时间内完成的工作",{"key":28,"text":162,"correct":26},"绩效报告通常需要提供有关范围、进度、成本和质量的信息",{"key":31,"text":164,"correct":22},"状态报告除了需要列出基本的绩效指标，同时需要分析进度滞后（或提前）和成本超出（或结余）的原因",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":24,"analysis":33},388927,"为了加强预算控制，成本估算建设在WBS的 （ ） 层进行。",[169,171,173,175],{"key":20,"text":170,"correct":26},"最高",{"key":24,"text":172,"correct":22},"最低",{"key":28,"text":174,"correct":26},"核心",{"key":31,"text":176,"correct":26},"第三",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":20,"analysis":33},388928,"下列关于项目投资回收期的说法中， （ ） 是正确的。",[181,183,185,187],{"key":20,"text":182,"correct":22},"项目投资回收期是指以项目的净收益回收项目投资所需要的时间",{"key":24,"text":184,"correct":26},"项目投资回收期一般以年为单位，并从项目投产开始年算起",{"key":28,"text":186,"correct":26},"投资回收期越长，则项目的盈利和抗风险能力越好",{"key":31,"text":188,"correct":26},"投资回收期的判别基准是基本投资回收期",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":20,"analysis":33},388929,"某项目投资额为190万元，实施后的利润分析如下表所示。 假设贴现率为0.1，则项目的投资收益率为 （ ） 。",[193,195,197,199],{"key":20,"text":194,"correct":22},"0.34",{"key":24,"text":196,"correct":26},"0.41",{"key":28,"text":198,"correct":26},"0.58",{"key":31,"text":200,"correct":26},"0.67",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":31,"analysis":33},388930,"项目甲、乙、丙、丁的工期都是三年，在第二年末其挣值分析数据如下表所示，按照趋势最早完工的应是 （ ） 。",[205,207,209,211],{"key":20,"text":206,"correct":26},"甲",{"key":24,"text":208,"correct":26},"乙",{"key":28,"text":210,"correct":26},"丙",{"key":31,"text":212,"correct":22},"丁",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},388931,"某项目通过提高信息表、物流、资金流速度，使得资金占用降低10%，按目前8.58亿流动资金，5%年利率计算，该项目经济收益约为 （ ） 万元。",[217,219,221,223],{"key":20,"text":218,"correct":26},"600",{"key":24,"text":220,"correct":22},"400",{"key":28,"text":222,"correct":26},"800",{"key":31,"text":224,"correct":26},"300",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":31,"analysis":33},388932,"超出项目经理控制的成本增加因素，除了存款利率、贷款利息和税率外，还包括（ ） 。",[229,231,233,235],{"key":20,"text":230,"correct":26},"项目日常开支的速度和生产率",{"key":24,"text":232,"correct":26},"项目日常开支的速度和工期拖延",{"key":28,"text":234,"correct":26},"项目补贴和加班",{"key":31,"text":236,"correct":22},"原材料成本和运输成本",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":28,"analysis":33},388933,"关于绩效评估的叙述中， （ ） 是错误的。",[241,243,245,247],{"key":20,"text":242,"correct":26},"绩效评估是按照一定的评价标准来衡量、考核、评价项目的绩效水平",{"key":24,"text":244,"correct":26},"评估人员一般要包括财务人员、管理人员、信息技术人员等",{"key":28,"text":246,"correct":22},"绩效评估主要是对项目做定性评价",{"key":31,"text":248,"correct":26},"评估实施过程中，需要归纳、分析、撰写评估报告",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":20,"analysis":33},388934,"假设需要把25盒磁带数据（每盒磁带数据量40G B）从甲地转送到乙地，甲、乙相距1km，可以采用的方法有汽车运输和TCP\u002FIP网络传输，网络传输介质可选用双绞线、单模光纤、多模光纤等。通常情况下，采用 （ ） 介质，所用时间最短。",[253,255,257,259],{"key":20,"text":254,"correct":22},"汽车",{"key":24,"text":256,"correct":26},"双绞线",{"key":28,"text":258,"correct":26},"多模光纤",{"key":31,"text":260,"correct":26},"单模光纤",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":31,"analysis":33},388935,"某公司拟将5百万元资金投放下属 A、 B、C三个子公司（以百万元的倍数分配投资），各子公司获得部分投资后的收益如下表所示（以百万元为单位）。该公司投资的总收益至多为 （ ） 百万元。",[265,267,269,271],{"key":20,"text":266,"correct":26},"4.8",{"key":24,"text":268,"correct":26},"5.3",{"key":28,"text":270,"correct":26},"5.4",{"key":31,"text":272,"correct":22},"5.5",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":24,"analysis":33},388936,"某项目被分解成10项工作，每项工作的预计花费为10万元，工期为10个月，按照进度计划，前三个月应该完成其中的3项工作，但是到第三个月底的时候，项目实际只完成了2项工作，实际花费为30万元。项目经理采用了挣值分析的方法对该项目的绩效情况进行了分析，以下结论中， （ ） 是正确的。",[277,279,281,283],{"key":20,"text":278,"correct":26},"根据预算，前三个月的计划成本为30万元，实际花费也是30万元，说明项目的成本控制的还不错，只是进度上有滞后",{"key":24,"text":280,"correct":22},"如果该项目按此成本效率执行下去，到整个项目完成时，实际花费的成本将超过预算50%",{"key":28,"text":282,"correct":26},"如果该项目不采取任何措施继续执行下去，实际的完工工期将会超期1个月",{"key":31,"text":284,"correct":26},"该项目目前的绩效状况不理想，但只要继续采用挣值分析的方法对项目进行监控，将会有效的防止成本超支",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":31,"analysis":33},388937,"（ ） 不是成本估算的方法。",[289,291,293,295],{"key":20,"text":290,"correct":26},"类比法",{"key":24,"text":292,"correct":26},"确定资源费率",{"key":28,"text":294,"correct":26},"工料清单法",{"key":31,"text":140,"correct":22},{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":24,"analysis":33},388938,"某项目成本偏差（CV）大于0，进度偏差（SV）小于0，则该项目的状态是 （ ） 。",[300,302,304,306],{"key":20,"text":301,"correct":26},"成本节省、进度超前",{"key":24,"text":303,"correct":22},"成本节省、进度落后",{"key":28,"text":305,"correct":26},"成本超支、进度超前",{"key":31,"text":307,"correct":26},"成本超支、进度落后",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":28,"analysis":33},388939,"某系统集成项目包含了三个软件模块，现在估算项目成本时，项目经理考虑到其中的模块 A技术成熟，已在以前类似项目中多次使用并成功支付，所有项目经理忽略了 A 的开发成本，只给 A 预留了 5 万元，以防意外发生。然后估算了 B 的成本为 50 万元，C 成本为 30 万元，应急储备为 10 万元，三者集成成本为 5 万元，并预留了项目的 10 万元管理储备。如果你是项目组成员，项目开始执行后，当项目的进度绩效指数 SPI 为 0.6 时，项目实际花费为 70 万元，超出预算 10万元，如果不加以纠偏，请根据当前项目进展，估算该项目的完工估算值(EA C)为（ ）万元",[312,314,316,318],{"key":20,"text":313,"correct":26},"64",{"key":24,"text":315,"correct":26},"134",{"key":28,"text":317,"correct":22},"194.4",{"key":31,"text":319,"correct":26},"124.4",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":20,"analysis":33},388940,"成本控制过程主要内容不包括（ ） 。",[324,326,328,330],{"key":20,"text":325,"correct":22},"将目的成本分配到项目的各项具体工作上",{"key":24,"text":327,"correct":26},"识别可能引起项目成本基准计划发生变动的因素，并对这些因素施加影响",{"key":28,"text":329,"correct":26},"对发生成本偏差的工作包实施管理，有针对性地采取纠正措施",{"key":31,"text":331,"correct":26},"对项目的最终成本进行预测",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":24,"analysis":33},388941,"单位在项目执行过程中，由于质量管理方面的问题造成了局部范围的返工，单位失去了承建另外一个项目的机会，这属于 （ ）",[336,338,340,342],{"key":20,"text":337,"correct":26},"质量成本",{"key":24,"text":339,"correct":22},"机会成本",{"key":28,"text":341,"correct":26},"时间成本",{"key":31,"text":343,"correct":26},"无形成本",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":20,"analysis":33},388942,"在某项目进行的第三个月，累计计划费用是25万元人民币，而实际支出为28万元，以下关于这个项目进展的叙述，正确的是：",[348,350,352,354],{"key":20,"text":349,"correct":22},"提供的信息不全，无法评估",{"key":24,"text":351,"correct":26},"由于成本超支，项目面临困难",{"key":28,"text":353,"correct":26},"项目将在原预算内完成",{"key":31,"text":355,"correct":26},"项目计划提前",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":24,"analysis":33},388943,"以下关于成本基准特点的叙述中，不正确的是 （ ） 。",[360,362,364,366],{"key":20,"text":361,"correct":26},"按时间分段计算，用做度量和监督成本绩效的基准",{"key":24,"text":363,"correct":22},"成本基准反映整个项目生命期的实际成本支出",{"key":28,"text":365,"correct":26},"按时段汇总估算的成本编制而成",{"key":31,"text":367,"correct":26},"通常以S曲线的形式表示",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":24,"analysis":33},388944,"某软件企业2004年初计划投资1000万人民币开发一套中间件产品，预计从2005年开始，年实现产品销售收入1500万元，年市场销售成本1000万元。该产品的系统分析员张工根据财务总监提供的贴现率，制作了如下的产品销售现金流量表。根据表中的数据，投资收益率是 （ ） 。",[372,374,376,378],{"key":20,"text":373,"correct":26},"42%",{"key":24,"text":375,"correct":22},"44%",{"key":28,"text":377,"correct":26},"50%",{"key":31,"text":379,"correct":26},"100%",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":31,"analysis":33},388945,"（ ） 一般不属于项目绩效报告的内容",[384,386,388,390],{"key":20,"text":385,"correct":26},"团队成员考核",{"key":24,"text":387,"correct":26},"项目预测",{"key":28,"text":389,"correct":26},"项目主要效益",{"key":31,"text":391,"correct":22},"变更请求",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":24,"analysis":33},388946,"项目Ⅰ.Ⅱ.Ⅲ.Ⅳ的工期都是三年，在第二年末其挣值分析数据如下表所示。按此趋势，项目 （ ） 应最早完工。",[396,397,398,399],{"key":20,"text":39,"correct":26},{"key":24,"text":41,"correct":22},{"key":28,"text":43,"correct":26},{"key":31,"text":45,"correct":26},{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":31,"analysis":33},388947,"某系统集成项目包含了三个软件模块，现在估算项目成本时，项目经理考虑到其中的模块 A技术成熟，已在以前类似项目中多次使用并成功支付，所有项目经理忽略了 A 的开发成本，只给 A 预留了 5 万元，以防意外发生。然后估算了 B 的成本为 50 万元，C 成本为 30 万元，应急储备为 10 万元，三者集成成本为 5 万元，并预留了项目的 10 万元管理储备。如果你是项目组成员，该项目的项目预算是（ ）万元。",[404,406,408,410],{"key":20,"text":405,"correct":26},"90",{"key":24,"text":407,"correct":26},"95",{"key":28,"text":409,"correct":26},"100",{"key":31,"text":411,"correct":22},"110",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":20,"analysis":33},388948,"在对项目内部各成员制定绩效任务时，首先应（ ） 。",[416,418,420,422],{"key":20,"text":417,"correct":22},"对每个岗位的工作内容进行分解",{"key":24,"text":419,"correct":26},"对每个岗位的工作在进度、成本、质量等上设定K P I值",{"key":28,"text":421,"correct":26},"确定K P I的评分标准",{"key":31,"text":423,"correct":26},"确定考核频率",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":31,"analysis":33},388949,"以下关于绩效报告的说法中， （ ） 是错误的",[428,430,432,434],{"key":20,"text":429,"correct":26},"绩效报告应包含项目的状态报告和进展报告，以及对项目的未来状况的预测",{"key":24,"text":431,"correct":26},"形成绩效报告之前应收集项目的各种数据，进行分析和汇总，这些数据来源于项目执行过程中的记录",{"key":28,"text":433,"correct":26},"通过对项目绩效的分析可能会产生项目变更的需求",{"key":31,"text":435,"correct":22},"绩效报告应该关注项目的重要目标方面的内容，主要是对进度、质量和成本方面的绩效情况的量化分析，风险、采购等定性方面的内容不必纳入绩效报告中",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":28,"analysis":33},388950,"项目计划工期为4年，预算总成本为800万元。在项目的实施过程中，通过对成本的核算和有关成本与进度的记录得知，开工后第2年末实际成本发生额为200万元，所完成工作的计划预算成本额为100万元。与项目预算成本比较可知：当工期过半时，项目的计划成本发生额应该为400万元。此时如果不采取任何纠正措施，照此速度发展下去，那么到开工后第4年末项目会出现 （ ） 万元的成本超支。",[440,442,443,445],{"key":20,"text":441,"correct":26},"50",{"key":24,"text":409,"correct":26},{"key":28,"text":444,"correct":22},"200",{"key":31,"text":220,"correct":26},{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":31,"analysis":33},388951,"某软件开发项目，预算为40万元，计划在40个工作日内完成，当项目进行到第30个工作日时，项目经理对项目进行了绩效评估，结果是：项目完成当期计划进度的70%，花费了23万，按此绩效还需投入大约 （ ） 万元才能完成该项目。",[450,452,454,456],{"key":20,"text":451,"correct":26},"10",{"key":24,"text":453,"correct":26},"12",{"key":28,"text":455,"correct":26},"19",{"key":31,"text":457,"correct":22},"21",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":28,"analysis":33},388952,"假设某项目任务已进行了充分细化分解，任务安排及完成情况如下图，已获价值适用50\u002F50规则（活动开始执行即获得一半价值），则下图中项目监控点的PV、EV、BAC分别为 （ ） 。",[462,464,466,468],{"key":20,"text":463,"correct":26},"PV=4200,EV=3000,BAC=5200",{"key":24,"text":465,"correct":26},"PV=4200,EV=3300,BAC=4600",{"key":28,"text":467,"correct":22},"PV=3600,EV=3300,BAC=5200",{"key":31,"text":469,"correct":26},"PV=3600,EV=3000,BAC=4600",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":31,"analysis":33},388953,"在项目每个阶段结束时进行项目绩效评审是很重要的，评审的目标______。",[474,476,478,480],{"key":20,"text":475,"correct":26},"根据项目的基准计划来决定完成该项目需要多少资源",{"key":24,"text":477,"correct":26},"根据上一阶段的绩效调整下一阶段的进度和成本基准",{"key":28,"text":479,"correct":26},"得到客户对项目绩效认同",{"key":31,"text":481,"correct":22},"决定项目是否可以进入下一个阶段",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":24,"analysis":33},388954,"某项目在进行进度计划管理时，计算得出CPI小于1，SPI小于1,该项目是（ ）",[486,488,490,492],{"key":20,"text":487,"correct":26},"成本节约，进度落后",{"key":24,"text":489,"correct":22},"成本超支，进度落后",{"key":28,"text":491,"correct":26},"成本节约，进度超前",{"key":31,"text":493,"correct":26},"成本超支，进度超前",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":28,"analysis":33},388955,"关于系统建设项目成本预算，下列说法中不正确的是 （ ） 。",[498,500,502,504],{"key":20,"text":499,"correct":26},"成本总计、管理储备、参数模型和支出合理化原则用于成本预算",{"key":24,"text":501,"correct":26},"成本基准计划是用来衡量差异和未来项目绩效的",{"key":28,"text":503,"correct":22},"成本预算过程对现在的项目活动及未来的运营活动分配资金",{"key":31,"text":505,"correct":26},"成本基准计划计算的是项目的预计成本",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":28,"analysis":33},388956,"在 （ ） 情况下，可使用储备金",[510,512,514,516],{"key":20,"text":511,"correct":26},"需要添加额外资金以弥补初始预算",{"key":24,"text":513,"correct":26},"当协商劳动合同时，潜在劳动力价格会发生波动",{"key":28,"text":515,"correct":22},"确定发生了预算的问题但没有估计完全",{"key":31,"text":517,"correct":26},"当客户要求项目高质量完成时",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":20,"analysis":33},388957,"某信息系统集成项目采用净值分析技术进行成本控制，假设当前状况数据如下表所示，则该项目的CPI、EA C、当前项目的状态分别是 （46） 。",[522,524,526,528],{"key":20,"text":523,"correct":22},"0.8，12 500元，进度滞后且成本超支",{"key":24,"text":525,"correct":26},"0.8，10 000元，进度提前且成本超支",{"key":28,"text":527,"correct":26},"1.25，12 500元，进度滞后且成本低于预算",{"key":31,"text":529,"correct":26},"1.25，10 000元，进度提前且成本低于预算",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":28,"analysis":33},388958,"某软件公司项目A的利润分析如下表所示。设贴现率为10％，第二年的利润净现值是 （ ） 元。",[534,536,538,540],{"key":20,"text":535,"correct":26},"1,378,190",{"key":24,"text":537,"correct":26},"949,167",{"key":28,"text":539,"correct":22},"941,322",{"key":31,"text":541,"correct":26},"922,590",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":28,"analysis":33},388959,"以下关于项目成本控制的叙述中， （ ） 是不正确的。",[546,548,550,552],{"key":20,"text":547,"correct":26},"成本控制可提前识别可能引起项目成本基准变化的因素，并对其影响",{"key":24,"text":549,"correct":26},"成本控制的关键是经常并及时分析项目成本绩效",{"key":28,"text":551,"correct":22},"成本控制的单位一般为项目的具体活动",{"key":31,"text":553,"correct":26},"进行成本控制是要防范因成本失控产生的各种可能风险",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":28,"analysis":33},388960,"（ ） 不是项目成本估算的输入。",[558,560,562,564],{"key":20,"text":559,"correct":26},"项目进度管理计划",{"key":24,"text":561,"correct":26},"项目管理计划",{"key":28,"text":563,"correct":22},"项目成本绩效报告",{"key":31,"text":565,"correct":26},"风险事件",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":31,"analysis":33},388961,"某企业今年用于信息系统安全工程师的培训费用为5万元，其中有8000元计入A项目成本，该成本属于A项目的 （ ） 。",[570,572,574,576],{"key":20,"text":571,"correct":26},"A. 可变成本",{"key":24,"text":573,"correct":26},"沉没成本",{"key":28,"text":575,"correct":26},"实际成本",{"key":31,"text":577,"correct":22},"间接成本",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":24,"analysis":33},388962,"项目进行到某阶段时，项目经理进行绩效分析，计算出CPI值为1.09，这表示（ ） 。",[582,584,586,588],{"key":20,"text":583,"correct":26},"每花费109元人民币，只创造相当于100元的价值",{"key":24,"text":585,"correct":22},"每花费100元人民币，只创造相当于109元的价值",{"key":28,"text":587,"correct":26},"项目进展到计划进度的109%",{"key":31,"text":589,"correct":26},"项目超额支出9%的成本",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":20,"analysis":33},388963,"对项目的投资效果进行经济评价的方法，包含静态分析法合动态分析法，这两种方法的区别主要体现在（ ）。",[594,596,598,600],{"key":20,"text":595,"correct":22},"是否考虑了资金的时间价值",{"key":24,"text":597,"correct":26},"是否考虑了投资效益",{"key":28,"text":599,"correct":26},"是否考虑了投资回收期",{"key":31,"text":601,"correct":26},"是否考虑了投资总额和差额",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":28,"analysis":33},388964,"已知某综合布线工程的挣值曲线如下图所示：总预算为1230万元，到目前为止已支出900万元，实际完成了总工作量的60%，该阶段的预算费用是850万元。按目前的状况继续发展，要完成剩余的工作还需要 （ ） 万元。",[606,608,610,611],{"key":20,"text":607,"correct":26},"330",{"key":24,"text":609,"correct":26},"492",{"key":28,"text":218,"correct":22},{"key":31,"text":612,"correct":26},"738",[614,618,621,624,627,630],{"id":615,"name":616,"category":7,"favorite":617},136,"法律职业试卷二(客观题 )",2,{"id":619,"name":620,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":622,"name":623,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":625,"name":626,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":628,"name":629,"category":7,"favorite":8},28,"安全工程师",{"id":631,"name":632,"category":7,"favorite":8},112,"安全生产法律知识"]