[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":593},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,14,50,1856,[13,34,46,58,70,82,94,106,116,125,137,149,161,170,179,191,203,212,224,236,248,259,271,282,293,302,314,326,338,350,359,371,383,395,407,419,431,439,451,463,475,487,499,510,522,534,546,557,569,581],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},388865,1,"单选题","某企业拟建设一个面向生产管理的信息系统，以提高企业的生产管理水平。该项目的建设期为2年，运营期为7年。在某工程咨询单位编制的项目可行性研究方案中，项目各年预计净现金流量（NC F）、折现系数以及计算出的折现净现金流如下表所示（贴现率为10%）。建设单位要求监理对方案投资的可行性提出监理意见。 计算项目的动态投资回收期为（）",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","6.26",false,{"key":24,"text":25,"correct":22},"B","6.76",{"key":27,"text":28,"correct":29},"C","7.26",true,{"key":31,"text":32,"correct":22},"D","7.76","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},388866,"某监理单位承担了一个信息系统工程全过程的监理 工作在应用系统建设过程中，由于工期紧张，成本有限，监理工程师按照承建单位的进度计划严格进行跟踪检查，并要求承建单位对 A、 B、 C、D四个重要活动进行成本优化。监理工程师在检查承建单位项目经理的成本优化方案时，检查了如下网络图: 项目的总工期（）周",[38,40,42,44],{"key":20,"text":39,"correct":22},"17",{"key":24,"text":41,"correct":29},"18",{"key":27,"text":43,"correct":22},"19",{"key":31,"text":45,"correct":22},"20",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},388867,"某项目工期为6个月，该项目的项目经理在第3个月末对项目进行了中期检查，检查结果表明完成了计划进度的90%，相关情况见下表（单位：万元），表中活动之间存在F-S关系。 “概要设计”活动的SPI为（）",[50,52,54,56],{"key":20,"text":51,"correct":22},"0.2",{"key":24,"text":53,"correct":22},"0.3",{"key":27,"text":55,"correct":29},"0.4",{"key":31,"text":57,"correct":22},"0.5",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},388868,"某信息系统项目包括如下十个活动，各活动的历时、活动逻辑关系如下表所示： 该项目的关键路径是（）",[62,64,66,68],{"key":20,"text":63,"correct":22},"AFGEIJ",{"key":24,"text":65,"correct":22},"ABCEHJ",{"key":27,"text":67,"correct":29},"ADCEIJ",{"key":31,"text":69,"correct":22},"ADCEHJ",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},388869,"某软件项目包含8项活动，活动之间的依赖关系，以及各活动的工作量和所需的资源如下表所示。假设不同类型的工作人员之间不能互换，但是同一类型的人员都可以从事与其相关的所有工作。所有参与该项目的工作人员，从项目一开始就进入项目团队，并直到项目结束时才能离开，在项目过程中不能承担其他活动。（所有的工作都按照整天计算） 假设该项目团队有SA人员1人，SD人员2人，SC人员3人，如果A结束后，先投入2个SD完成 C，需要1天。C结束后，再投入2个SD完成 D，需要2天。C结束后，投入3个SC完成 F，需要1天。D结束后，投入SD完成B。 C、D结束后，投入3个SC完成 G，需要3天。G结束后，投入3个SC完成 E，需要1天。 E、 F、G完成后，投入1个SA完成 H，需要2天。请从下列选项中选出正确的答案。 假设现在市场上一名SA每天的成本为500元，一名SD每天的成本为500元，一名SC每天的成本为600元，项目要压缩至10天完成。则应__（ ）_类型的资源,项目成本_（请作答此空）__。",[74,76,78,80],{"key":20,"text":75,"correct":22},"增加4800元",{"key":24,"text":77,"correct":29},"减少4900元",{"key":27,"text":79,"correct":22},"减少4800",{"key":31,"text":81,"correct":22},"增加4900元",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},388870,"某监理单位承担了一个信息系统工程全过程的监理 工作在应用系统建设过程中，由于工期紧张，成本有限，监理工程师按照承建单位的进度计划严格进行跟踪检查，并要求承建单位对 A、 B、 C、D四个重要活动进行成本优化。监理工程师在检查承建单位项目经理的成本优化方案时，检查了如下网络图: 结合案例，如果全部活动均在它们各自的应急工期内完成，该项目工期为（ ）和项目总成本为（请作答此空）万元。",[86,88,90,92],{"key":20,"text":87,"correct":22},"25.7",{"key":24,"text":89,"correct":22},"25.8",{"key":27,"text":91,"correct":29},"26.7",{"key":31,"text":93,"correct":22},"26.8",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},388871,"某项目工期为6个月，该项目的项目经理在第3个月末对项目进行了中期检查，检查结果表明完成了计划进度的90%，相关情况见下表（单位：万元），表中活动之间存在F-S关系。 如果按照当前的绩效EAC为（）",[98,100,102,104],{"key":20,"text":99,"correct":22},"60.12",{"key":24,"text":101,"correct":29},"60.22",{"key":27,"text":103,"correct":22},"58.12",{"key":31,"text":105,"correct":22},"58.22",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},388872,"某监理单位承担了一个信息系统工程全过程的监理 工作在应用系统建设过程中，由于工期紧张，成本有限，监理工程师按照承建单位的进度计划严格进行跟踪检查，并要求承建单位对 A、 B、 C、D四个重要活动进行成本优化。监理工程师在检查承建单位项目经理的成本优化方案时，检查了如下网络图: 项目的总成本为（）万元",[110,111,112,114],{"key":20,"text":43,"correct":22},{"key":24,"text":45,"correct":29},{"key":27,"text":113,"correct":22},"21",{"key":31,"text":115,"correct":22},"22",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":20,"analysis":33},388873,"某监理单位承担了一个信息系统工程全过程的监理 工作在应用系统建设过程中，由于工期紧张，成本有限，监理工程师按照承建单位的进度计划严格进行跟踪检查，并要求承建单位对 A、 B、 C、D四个重要活动进行成本优化。监理工程师在检查承建单位项目经理的成本优化方案时，检查了如下网络图: 结合案例，如果全部活动均在它们各自的应急工期内完成，该项目工期为（请作答此空）和项目总成本为（ ）万元。",[120,122,123,124],{"key":20,"text":121,"correct":29},"16",{"key":24,"text":39,"correct":22},{"key":27,"text":41,"correct":22},{"key":31,"text":43,"correct":22},{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":31,"analysis":33},388874,"项目进行到某阶段时，项目经理进行了绩效分析，计算出CPI值为0.91。这表示（ ） 。",[129,131,133,135],{"key":20,"text":130,"correct":22},"项目的每91元人民币投资中可创造相当于100元的价值",{"key":24,"text":132,"correct":22},"当项目完成时将会花费投资额的91%",{"key":27,"text":134,"correct":22},"项目仅进展到计划进度的91%",{"key":31,"text":136,"correct":29},"项目的每100元人民币投资中只创造相当于91元的价值",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":24,"analysis":33},388875,"完成某信息系统集成项目中的一个最基本的工作单元A所需的时间，乐观的估计需8天，悲观的估计需38天，最可能的估计需20天，按照PERT方法进行估算，在26天以后完成的概率大致为（ ）。",[141,143,145,147],{"key":20,"text":142,"correct":22},"8.9%",{"key":24,"text":144,"correct":29},"15.9%",{"key":27,"text":146,"correct":22},"22.2%",{"key":31,"text":148,"correct":22},"28.6%",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":20,"analysis":33},388876,"下图是某项目的剪线图（时间单位：周），其关键路径的工期是（ ）周。",[153,155,157,159],{"key":20,"text":154,"correct":29},"14",{"key":24,"text":156,"correct":22},"12",{"key":27,"text":158,"correct":22},"11",{"key":31,"text":160,"correct":22},"13",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":31,"analysis":33},388877,"某项目完成估计需要12个月。在进一步分析后认为最少将花8个月，最糟糕的情况下将花28个月。那么，这个估计的PERT值是 _____个月",[165,167,168,169],{"key":20,"text":166,"correct":22},"9",{"key":24,"text":158,"correct":22},{"key":27,"text":160,"correct":22},{"key":31,"text":154,"correct":29},{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":24,"analysis":33},388878,"下图为某工程进度网络图，节点1为起点，节点11为终点，此工程最快 （ ） 天完成",[174,175,177,178],{"key":20,"text":41,"correct":22},{"key":24,"text":176,"correct":29},"28",{"key":27,"text":115,"correct":22},{"key":31,"text":45,"correct":22},{"id":180,"libraryId":5,"type":15,"typeLabel":16,"stem":181,"options":182,"answer":31,"analysis":33},388879,"一项任务的最早开始时间是第3天，最晚开始时间是第13天，最早完成时间是第9天，最晚完成时间是第19天。该任务（ ）。",[183,185,187,189],{"key":20,"text":184,"correct":22},"在关键路径上",{"key":24,"text":186,"correct":22},"有滞后",{"key":27,"text":188,"correct":22},"进展情况良好",{"key":31,"text":190,"correct":29},"不在关键路径上",{"id":192,"libraryId":5,"type":15,"typeLabel":16,"stem":193,"options":194,"answer":27,"analysis":33},388880,"（ ）是一种基于历史数据和项目参数，使用某种算法来计算成本或工期的估算技术",[195,197,199,201],{"key":20,"text":196,"correct":22},"类比估算",{"key":24,"text":198,"correct":22},"三点估算",{"key":27,"text":200,"correct":29},"参数估算",{"key":31,"text":202,"correct":22},"储备分析",{"id":204,"libraryId":5,"type":15,"typeLabel":16,"stem":205,"options":206,"answer":24,"analysis":33},388881,"完成某信息系统集成项目中的一个最基本的工作单元A所需的时间，乐观的估计需8天，悲观的估计需38天，最可能的估计需20天，按照PERT方法进行估算，项目的工期应该为 （ ） 。",[207,208,209,210],{"key":20,"text":45,"correct":22},{"key":24,"text":113,"correct":29},{"key":27,"text":115,"correct":22},{"key":31,"text":211,"correct":22},"23",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":27,"analysis":33},388882,"制定进度计划过程中，常用于评价项目进度风险的技术是 （ ） 。",[216,218,220,222],{"key":20,"text":217,"correct":22},"关键路径分析",{"key":24,"text":219,"correct":22},"网络图分析",{"key":27,"text":221,"correct":29},"PERT分析",{"key":31,"text":223,"correct":22},"关键链分析",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":20,"analysis":33},388883,"下图为某工程进度网络图，节点1为起点，节点11为终点，那么关键路径为 （ ） 。",[228,230,232,234],{"key":20,"text":229,"correct":29},"1—3—5—8—9—10—11",{"key":24,"text":231,"correct":22},"1—2—4—7—11",{"key":27,"text":233,"correct":22},"1—3—5—7—11",{"key":31,"text":235,"correct":22},"1—2—5—8—10—11",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":31,"analysis":33},388884,"某软件项目已经到了测试阶段，但是由于用户订购的硬件设备没有到货而不能实施测试。这种测试活动与硬件之间的依赖关系属于：",[240,242,244,246],{"key":20,"text":241,"correct":22},"强制性依赖关系",{"key":24,"text":243,"correct":22},"直接依赖关系",{"key":27,"text":245,"correct":22},"内部依赖关系",{"key":31,"text":247,"correct":29},"外部依赖关系",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":20,"analysis":33},388885,"某项目预计最快12天完成，最慢36天完成，21天完成的可能性最大。公司下达的计划是18天完成，要使计划完成的概率达到50%，在计划中需要增加 （ ） 天应急时间。",[252,254,256,258],{"key":20,"text":253,"correct":29},"4",{"key":24,"text":255,"correct":22},"6",{"key":27,"text":257,"correct":22},"8",{"key":31,"text":115,"correct":22},{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":27,"analysis":33},388886,"某市数字城市项目主要包括 A、 B、 C、 D、E等五项任务，且五项任务可同时开展。各项任务的预计建设时间以及人力投入如下表所示。以下安排中， （ ） 能较好地实现资源平衡，确保资源的有效利用。",[263,265,267,269],{"key":20,"text":264,"correct":22},"A. 五项任务同时开工",{"key":24,"text":266,"correct":22},"B. 待B任务完工后，再依次开展 A、 C、 D、E四项任务",{"key":27,"text":268,"correct":29},"C. 同时开展 A、D三项任务，待A任务完工后开展C任务、D任务完工后开展E任务同时开展",{"key":31,"text":270,"correct":22},"D三项任务，待A任务完工后开展E任务、D任务完工后开展C任务",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":24,"analysis":33},388887,"项目经理小李对一个小项目的工期进行估算时，发现开发人员的熟练程度对工期有较大的影响，如果都是经验丰富的开发人员，预计20天可以完成；如果都是新手，预计需要38天；按照公司的平均开发速度，一般26天可以完成。该项目的工期可以估算为 （ ） 天。",[275,277,279,280],{"key":20,"text":276,"correct":22},"26",{"key":24,"text":278,"correct":29},"27",{"key":27,"text":176,"correct":22},{"key":31,"text":281,"correct":22},"29",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":27,"analysis":33},388888,"某工程包括 A、 B、 C、 D、 E、F 六个作业，分别需要 5、7、3、4、15、12 天。A 必须在 C、D 开始之前完成， B、D 必须在 E 开始之前完成，C 必须在 F 开始之前完成，F 不能在 B、D 完成之前开始。若作业 E 缩短 4 天，则整个工期可以缩短（ ）天。",[286,288,290,292],{"key":20,"text":287,"correct":22},"1",{"key":24,"text":289,"correct":22},"2",{"key":27,"text":291,"correct":29},"3",{"key":31,"text":253,"correct":22},{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":27,"analysis":33},388889,"下图3是一个软件项目的活动图，其中顶点表示项目里程碑，连接顶点的边表示包含的活动，则里程碑（ ）在关键路径上。",[297,298,299,300],{"key":20,"text":24,"correct":22},{"key":24,"text":27,"correct":22},{"key":27,"text":31,"correct":29},{"key":31,"text":301,"correct":22},"I",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":20,"analysis":33},388890,"（ ）是借助网络图和各活动所需时间（估计值），计算每一项活动的最早或最迟开始和结束时间。",[306,308,310,312],{"key":20,"text":307,"correct":29},"A. CPM",{"key":24,"text":309,"correct":22},"CM",{"key":27,"text":311,"correct":22},"资源平衡",{"key":31,"text":313,"correct":22},"资源平滑",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":27,"analysis":33},388891,"以下工程进度网络图中，若结点0和6分别表示起点和终点，则关键路径为 （ ）。",[318,320,322,324],{"key":20,"text":319,"correct":22},"0→1→3→6",{"key":24,"text":321,"correct":22},"0→1→4→6",{"key":27,"text":323,"correct":29},"0→1→2→4→6",{"key":31,"text":325,"correct":22},"0→2→5→6",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":24,"analysis":33},388892,"在下面的项目网络图中（时间单位为天），活动B的自由时差和总时差分别为（ ）。",[330,332,334,336],{"key":20,"text":331,"correct":22},"0、0",{"key":24,"text":333,"correct":29},"0、1",{"key":27,"text":335,"correct":22},"1、0",{"key":31,"text":337,"correct":22},"1、1",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":27,"analysis":33},388893,"主要不关注网络路线的总时差，而是集中管理缓冲活动持续时间和用于计划活动资源的制订进度计划所采用的技术是 （ ） 。",[342,344,346,348],{"key":20,"text":343,"correct":22},"关键路线法",{"key":24,"text":345,"correct":22},"资源平衡法",{"key":27,"text":347,"correct":29},"关键链法",{"key":31,"text":349,"correct":22},"进度压缩法",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":31,"analysis":33},388894,"依据下面的项目活动网络图中，该项目历时为 （34） 天。",[354,356,357,358],{"key":20,"text":355,"correct":22},"10",{"key":24,"text":158,"correct":22},{"key":27,"text":160,"correct":22},{"key":31,"text":41,"correct":29},{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":31,"analysis":33},388895,"在项目某阶段的实施过程中，A活动需要2天2人完成，B活动需要2天2人完成，C活动需要5天4人完成，D活动需要3天2人完成，E活动需要1天1人完成，该阶段的时标网络图如下。该项目组共有8人，且负责 A、E活动的人因另有安排，无法帮助其他人完成相应工作，且项目整个工期刻不容缓。以下（）安排是恰当的，能够使实施任务顺利完成。",[363,365,367,369],{"key":20,"text":364,"correct":22},"B活动提前两天开始",{"key":24,"text":366,"correct":22},"B活动推迟两天开始",{"key":27,"text":368,"correct":22},"D活动提前两天开始",{"key":31,"text":370,"correct":29},"D活动推迟两天开始",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":24,"analysis":33},388896,"在进行项目活动历时估算时，如果很难获得项目工作的详细信息，可采用 （ ） 作为项目活动历时估算的工具。",[375,377,379,381],{"key":20,"text":376,"correct":22},"参数式估算法",{"key":24,"text":378,"correct":29},"类比估算法",{"key":27,"text":380,"correct":22},"预留时间估算法",{"key":31,"text":382,"correct":22},"历时的三点估算法",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":24,"analysis":33},388897,"某公司有50个正在进行的项目，张工是该公司的一个大项目经理，领导6个项目经理负责大项目或多项目的管理，每个项目级理至少负责两个项目，张工必须为每个项目合理安排进度和分配资源，则 （ ） 对张工至关重要。",[387,389,391,393],{"key":20,"text":388,"correct":22},"资源的使用和资源的评估",{"key":24,"text":390,"correct":29},"活动清单和WBS",{"key":27,"text":392,"correct":22},"时间的压缩和模拟",{"key":31,"text":394,"correct":22},"进度的滑移和待处理工作的数量",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":27,"analysis":33},388898,"在项目实施中间的某次周例会上，项目经理小王用下表向大家通报了目前的进度。根据这个表格，目前项目的进度（）",[399,401,403,405],{"key":20,"text":400,"correct":22},"提前于计划7%",{"key":24,"text":402,"correct":22},"落后于计划18%",{"key":27,"text":404,"correct":29},"落后于计划7%",{"key":31,"text":406,"correct":22},"落后于计划7.5%",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":27,"analysis":33},388899,"下图是某项目的剪线图（时间单位：周），其关键路径是（ ）。",[411,413,415,417],{"key":20,"text":412,"correct":22},"1-4-6-8-10-11",{"key":24,"text":414,"correct":22},"1-3-9-11",{"key":27,"text":416,"correct":29},"1-4-9-11",{"key":31,"text":418,"correct":22},"1-2-5-7-11",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":24,"analysis":33},388900,"在软件开发项目实施过程中，由于进度需要，有时要采取快速跟进措施。 （ ） 属于快速跟进范畴。",[423,425,427,429],{"key":20,"text":424,"correct":22},"压缩需求分析工作周期",{"key":24,"text":426,"correct":29},"设计图纸全部完成前就开始现场施工准备工作",{"key":27,"text":428,"correct":22},"使用最好的工程师，加班加点尽快完成需求分析说明书编制工作",{"key":31,"text":430,"correct":22},"与其他项目协调好关系以减少行政管理的摩擦",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":24,"analysis":33},388901,"完成某信息系统集成项目中的一个最基本的工作单元A所需的时间，乐观的估计需8天，悲观的估计需38天，最可能的估计需20天，按照PERT方法进行估算，项目在26天以后完成的概率大致为 （ ） 。",[435,436,437,438],{"key":20,"text":142,"correct":22},{"key":24,"text":144,"correct":29},{"key":27,"text":146,"correct":22},{"key":31,"text":148,"correct":22},{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":24,"analysis":33},388902,"在进行进度安排时，PERT图不能清晰地描述（3），但可以给出哪些任务完成后才能开始另一些任务。某项目X包含任务 A、 B、……、J，其中PERT图如下所示(A=1表示任务A的持续时间是1天)，则项目X的关键路径是（ ） (4)处填()。",[443,445,447,449],{"key":20,"text":444,"correct":22},"A-D-H-J",{"key":24,"text":446,"correct":29},"B-E-H-J",{"key":27,"text":448,"correct":22},"B-F-J",{"key":31,"text":450,"correct":22},"C-G-I-J",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":27,"analysis":33},388903,"某正在进行中的项目，当前的PV=2200元、EV=2000元、AC=2500元，该项目的CPI和成本绩效是 （ ） 。",[455,457,459,461],{"key":20,"text":456,"correct":22},"0.20；实际成本与计划的一致",{"key":24,"text":458,"correct":22},"0.80；实际成本比计划成本要低",{"key":27,"text":460,"correct":29},"0.80；实际成本超出了计划成本",{"key":31,"text":462,"correct":22},"1.25；实际成本超出了计划成本",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":31,"analysis":33},388904,"对项目的投资效果进行经济评价的方法主要有静态分析法和动态分析法。以下叙述中，不正确的是（ ） 。",[467,469,471,473],{"key":20,"text":468,"correct":22},"静态分析法对若干方案进行粗略评价，或对短期投资项目作经济分析时，不考虑资金的时间价值",{"key":24,"text":470,"correct":22},"动态分析法考虑资金的时间价值",{"key":27,"text":472,"correct":22},"静态分析法包括投资收益率法、投资回收期法、追加投资回收期法",{"key":31,"text":474,"correct":29},"动态分析法包括挣现值法、内部收益率法、最小费用法",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":27,"analysis":33},388905,"甲乙丙为三个独立项目，NPV甲=12万元，NPV乙=15万元，NPV丙=18万元，三个项目的初始投资额相同，并且回收期相同，则应优先选择 （ ） 项目进行投资。",[479,481,483,485],{"key":20,"text":480,"correct":22},"甲",{"key":24,"text":482,"correct":22},"乙",{"key":27,"text":484,"correct":29},"丙",{"key":31,"text":486,"correct":22},"甲或乙",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":31,"analysis":33},388906,"项目中每个成员都负有成本责任，以下关于成本控制对项目人员要求的叙述中，（ ）是不正确的。",[491,493,495,497],{"key":20,"text":492,"correct":22},"正确理解和使用成本控制信息",{"key":24,"text":494,"correct":22},"具有成本愿望和成本意识",{"key":27,"text":496,"correct":22},"关心成本控制的结果",{"key":31,"text":498,"correct":29},"成本控制是个人活动",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":27,"analysis":33},388907,"某项目各期的现金流量如表所示。 设贴现率为10%，则项目的净现值约为 （） 。",[503,505,507,509],{"key":20,"text":504,"correct":22},"140",{"key":24,"text":506,"correct":22},"70",{"key":27,"text":508,"correct":29},"34",{"key":31,"text":255,"correct":22},{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":31,"analysis":33},388908,"下列选项中，项目经理进行成本估算时不需要考虑的因素是 （ ）",[514,516,518,520],{"key":20,"text":515,"correct":22},"人力资源",{"key":24,"text":517,"correct":22},"工期长短",{"key":27,"text":519,"correct":22},"风险因素",{"key":31,"text":521,"correct":29},"盈利",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":27,"analysis":33},388909,"（ ）是指由于过去的决策已经发生了的，而不能由现在或将来的任何决策改变的成本。",[526,528,530,532],{"key":20,"text":527,"correct":22},"间接成本",{"key":24,"text":529,"correct":22},"直接成本",{"key":27,"text":531,"correct":29},"沉没成本",{"key":31,"text":533,"correct":22},"机会成本",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":20,"analysis":33},388910,"绩效评估实施过程的首要任务是 （ ） 。",[538,540,542,544],{"key":20,"text":539,"correct":29},"确定绩效评估项",{"key":24,"text":541,"correct":22},"组织评估队伍",{"key":27,"text":543,"correct":22},"收集审核被评价项目数据资料，进行定量评价，并参与定性评价",{"key":31,"text":545,"correct":22},"归纳、分析，撰写评价报告",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":27,"analysis":33},388911,"下列选项中，项目经理进行成本估算时不需要考虑的因素是 （ ） 。",[550,552,554,555],{"key":20,"text":551,"correct":22},"企业环境因素",{"key":24,"text":553,"correct":22},"员工管理计划",{"key":27,"text":521,"correct":29},{"key":31,"text":556,"correct":22},"风险事件",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":27,"analysis":33},388912,"项目经理向往在做软件项目成本估算时，先考虑了最不利的情况，估算出项目成本为120人日，又考虑了最有利的情况下项目成本为60人日，最后考虑一般情况下的项目成本可能为75人日，该项目最终的成本预算应为（）人日。",[561,563,565,567],{"key":20,"text":562,"correct":22},"100",{"key":24,"text":564,"correct":22},"90",{"key":27,"text":566,"correct":29},"80",{"key":31,"text":568,"correct":22},"75",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":24,"analysis":33},388913,"根据以下布线计划及完成进度表，在2010年6月2日完工后对工程进度和费用进行预测，按此进度，完成尚需估算（ET C）为 ：",[573,575,577,579],{"key":20,"text":574,"correct":22},"18000元",{"key":24,"text":576,"correct":29},"36000元",{"key":27,"text":578,"correct":22},"20000元",{"key":31,"text":580,"correct":22},"54000元",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":20,"analysis":33},388914,"以下最适合使用贴现现金流绩效评估方法进行评估的投资项目是 （ ） 。",[585,587,589,591],{"key":20,"text":586,"correct":29},"更新设备",{"key":24,"text":588,"correct":22},"新技术应用",{"key":27,"text":590,"correct":22},"开发新产品",{"key":31,"text":592,"correct":22},"拓展新市场",[594,598,601,604,607,610],{"id":595,"name":596,"category":7,"favorite":597},136,"法律职业试卷二(客观题 )",2,{"id":599,"name":600,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":602,"name":603,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":605,"name":606,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":608,"name":609,"category":7,"favorite":8},28,"安全工程师",{"id":611,"name":612,"category":7,"favorite":8},112,"安全生产法律知识"]