[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":583},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,13,50,1856,[13,34,46,58,70,82,94,106,118,128,140,152,164,176,188,200,212,224,235,247,259,271,283,291,303,315,327,339,347,359,371,382,390,398,409,421,429,439,451,463,471,483,494,503,511,523,535,547,559,571],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},388813,1,"单选题","下表给出了某信息系统建设项目的所有活动截止到2018年6月1日的成本绩效数据，项目完工预算BAC为30000元。 项目经理对项目偏差产生的原因进行了详细分析，预期未来还会发生类似偏差，请估算项目中的ETC为（）万元",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","0.96",false,{"key":24,"text":25,"correct":22},"B","0.97",{"key":27,"text":28,"correct":22},"C","0.98（解析第二种计算方法）",{"key":30,"text":31,"correct":32},"D","0.99（解析第一种计算方法）",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},388814,"某软件项目的活动图如下图所示，其中顶点表示项目里程碑，连接顶点的边表示包含的活动，边上的数字表示活动的持续时间（天），则完成该项目的最少时间为（ ）天。活动BD和HK最早可以从第（请作答此空）天开始。（活动A B、AE和AC最早从第1天开始）",[38,40,42,44],{"key":20,"text":39,"correct":22},"3和10",{"key":24,"text":41,"correct":32},"4和11",{"key":27,"text":43,"correct":22},"3和9",{"key":30,"text":45,"correct":22},"4和10",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},388815,"某项目由P1、P2、P3、P4、P5五个活动组成，五个活动全部完成之后项目才能够完成，每个活动都需要用到R1、R2、R3三种互斥资源，三种资源都必须达到活动的资源需求量，活动才能开始。已分配资源只有在完成本活动后才能被其他活动所用。目前项目经理能够调配的资源有限，R1、R2、R3的可用资源数分别为9、8、5。活动对资源的需求量、已分配资源数和各活动历时如下表所示(假设各活动之间没有依赖关系): 基于以上案例，请计算项目的完工时间为（）",[50,52,54,56],{"key":20,"text":51,"correct":22},"4",{"key":24,"text":53,"correct":22},"5",{"key":27,"text":55,"correct":22},"6",{"key":30,"text":57,"correct":32},"7",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},388816,"某项目工期为6个月，该项目的项目经理在第3个月末对项目进行了中期检查，检查结果表明完成了计划进度的90%，相关情况见下表（单位：万元），表中活动之间存在F-S关系。 计算中期检查时项目的CPI为（）",[62,64,66,68],{"key":20,"text":63,"correct":22},"0.82",{"key":24,"text":65,"correct":32},"0.83",{"key":27,"text":67,"correct":22},"0.73",{"key":30,"text":69,"correct":22},"0.72",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},388817,"某信息系统项目包括如下十个活动，各活动的历时、活动逻辑关系如下表所示： 该项目的总工期是（）",[74,76,78,80],{"key":20,"text":75,"correct":22},"19",{"key":24,"text":77,"correct":22},"20",{"key":27,"text":79,"correct":32},"21",{"key":30,"text":81,"correct":22},"22",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},388818,"下表给出了某信息系统建设项目的所有活动截止到2018年6月1日的成本绩效数据，项目完工预算BAC为30000元。 该项目的成本和进度执行情况（）",[86,88,90,92],{"key":20,"text":87,"correct":22},"成本超支与进度滞后",{"key":24,"text":89,"correct":22},"成本超支与进度超前",{"key":27,"text":91,"correct":32},"成本节约与进度滞后",{"key":30,"text":93,"correct":22},"成本节约与进度超前",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},388819,"项目绩效审计不包括（）。",[98,100,102,104],{"key":20,"text":99,"correct":32},"决算审计",{"key":24,"text":101,"correct":22},"经济审计",{"key":27,"text":103,"correct":22},"效率审计",{"key":30,"text":105,"correct":22},"效果审计",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},388820,"某软件项目包含8项活动，活动之间的依赖关系，以及各活动的工作量和所需的资源如下表所示。假设不同类型的工作人员之间不能互换，但是同一类型的人员都可以从事与其相关的所有工作。所有参与该项目的工作人员，从项目一开始就进入项目团队，并直到项目结束时才能离开，在项目过程中不能承担其他活动。（所有的工作都按照整天计算） 假设该项目团队有SA人员1人，SD人员2人，SC人员3人，如果A结束后，先投入2个SD完成 C，需要1天。C结束后，再投入2个SD完成 D，需要2天。C结束后，投入3个SC完成 F，需要1天。D结束后，投入SD完成B。 C、D结束后，投入3个SC完成 G，需要3天。G结束后，投入3个SC完成 E，需要1天。 E、 F、G完成后，投入1个SA完成 H，需要2天。请从下列选项中选出正确的答案。该项目的总工期是___天。",[110,112,114,116],{"key":20,"text":111,"correct":22},"11",{"key":24,"text":113,"correct":22},"12",{"key":27,"text":115,"correct":32},"13",{"key":30,"text":117,"correct":22},"14",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":30,"analysis":33},388821,"某软件项目的活动图如下图所示，其中顶点表示项目里程碑，连接顶点的边表示包含的活动，边上的数字表示活动的持续时间（天），则完成该项目的最少时间为（请作答此空）天。活动BD和HK最早可以从第（ ）天开始。（活动A B、AE和AC最早从第1天开始）",[122,124,126,127],{"key":20,"text":123,"correct":22},"17",{"key":24,"text":125,"correct":22},"18",{"key":27,"text":75,"correct":22},{"key":30,"text":77,"correct":32},{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":30,"analysis":33},388822,"某工程网络计划图如下所示，其各工作的持续时间压缩费率、正常持续时间和最短时间在箭线上下标出，该工程要求26d内完成，试进行网络计划调整，计算后该项目的赶工费用为（）元。",[132,134,136,138],{"key":20,"text":133,"correct":22},"1200",{"key":24,"text":135,"correct":22},"1310",{"key":27,"text":137,"correct":22},"1320",{"key":30,"text":139,"correct":32},"1350",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":20,"analysis":33},388823,"某软件项目包含8项活动，活动之间的依赖关系，以及各活动的工作量和所需的资源如下表所示。假设不同类型的工作人员之间不能互换，但是同一类型的人员都可以从事与其相关的所有工作。所有参与该项目的工作人员，从项目一开始就进入项目团队，并直到项目结束时才能离开，在项目过程中不能承担其他活动。（所有的工作都按照整天计算） 假设该项目团队有SA人员1人，SD人员2人，SC人员3人，如果A结束后，先投入2个SD完成 C，需要1天。C结束后，再投入2个SD完成 D，需要2天。C结束后，投入3个SC完成 F，需要1天。D结束后，投入SD完成B。 C、D结束后，投入3个SC完成 G，需要3天。G结束后，投入3个SC完成 E，需要1天。 E、 F、G完成后，投入1个SA完成 H，需要2天。请从下列选项中选出正确的答案。 假设现在市场上一名SA每天的成本为500元，一名SD每天的成本为500元，一名SC每天的成本为600元，项目要压缩至10天完成。则应__（请作答此空）_类型的资源,项目成本_（ ）__。",[144,146,148,150],{"key":20,"text":145,"correct":32},"增加SA",{"key":24,"text":147,"correct":22},"增加SD",{"key":27,"text":149,"correct":22},"减少SC",{"key":30,"text":151,"correct":22},"减少SD",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":27,"analysis":33},388824,"某企业拟建设一个面向生产管理的信息系统，以提高企业的生产管理水平。该项目的建设期为2年，运营期为7年。在某工程咨询单位编制的项目可行性研究方案中，项目各年预计净现金流量（NC F）、折现系数以及计算出的折现净现金流如下表所示（贴现率为10%）。建设单位要求监理对方案投资的可行性提出监理意见。 根据上表给出的数据，计算项目的净现值为（）",[156,158,160,162],{"key":20,"text":157,"correct":22},"410.46",{"key":24,"text":159,"correct":22},"411.46",{"key":27,"text":161,"correct":32},"411.52",{"key":30,"text":163,"correct":22},"411.62",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":24,"analysis":33},388825,"某项目各项工作的先后顺序及工作时间如下表所示，该项目的总工期为 （ ） 天。",[168,170,172,174],{"key":20,"text":169,"correct":22},"31",{"key":24,"text":171,"correct":32},"32",{"key":27,"text":173,"correct":22},"33",{"key":30,"text":175,"correct":22},"34",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":27,"analysis":33},388826,"下表给出了项目中各活动的乐观估计时间、最可能估计时间和悲观估计时间，则项目的期望完工总时间是 （ ） 天。",[180,182,184,186],{"key":20,"text":181,"correct":22},"36",{"key":24,"text":183,"correct":22},"38",{"key":27,"text":185,"correct":32},"40",{"key":30,"text":187,"correct":22},"42",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":24,"analysis":33},388827,"S-F型是（ ）",[192,194,196,198],{"key":20,"text":193,"correct":22},"开始-开始关系",{"key":24,"text":195,"correct":32},"开始-结束关系",{"key":27,"text":197,"correct":22},"结束-开始关系",{"key":30,"text":199,"correct":22},"结束-结束关系",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":30,"analysis":33},388828,"某工程的进度计划网络图如下图所示，其中包含了①～⑩10个节点，节点之间的剪线表示作业及其进度方向，箭线旁标注了作业所需的时间（单位：周）。设起始节点①的时间为0，则节点⑤的最早时间和最迟时间分别为 （ ） 周。",[204,206,208,210],{"key":20,"text":205,"correct":22},"9，19",{"key":24,"text":207,"correct":22},"9，18",{"key":27,"text":209,"correct":22},"15，17",{"key":30,"text":211,"correct":32},"15，16",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":30,"analysis":33},388830,"如果挣值EV是300万元，实际成本AC是350万元，计划值PV是375万元。进度执行指数显示：",[216,218,220,222],{"key":20,"text":217,"correct":22},"仅以原始计划速率的 86%进行项目",{"key":24,"text":219,"correct":22},"正在以原始计划速率的93%进行项目",{"key":27,"text":221,"correct":22},"正在以原始计划速率的107%进行项目",{"key":30,"text":223,"correct":32},"仅以原始计划速率的80%进行项目",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":24,"analysis":33},388831,"某工程包括 A、 B、 C、 D、 E、 F、 G、H八个作业，各个作业的紧前作业、所需时间和所需人数如下表所示（假设每个人均能承担各个作业）：按此工期，整个工程至少需要 （ ） 人。",[228,230,232,234],{"key":20,"text":229,"correct":22},"8",{"key":24,"text":231,"correct":32},"9",{"key":27,"text":233,"correct":22},"10",{"key":30,"text":111,"correct":22},{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":30,"analysis":33},388832,"如果项目受资源限制，往往需要项目经理进行资源平衡。但当（）时，不宜进行资源平衡。",[239,241,243,245],{"key":20,"text":240,"correct":22},"项目在时间上有一定的灵活性",{"key":24,"text":242,"correct":22},"项目团队成员一专多能",{"key":27,"text":244,"correct":22},"项目在成本上有一定的灵活性",{"key":30,"text":246,"correct":32},"项目团队处理应急风险",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":20,"analysis":33},388833,"某软件开发项目的实际进度已经大幅滞后于计划进度， （ ） 能够较为有效地缩短活动工期。",[251,253,255,257],{"key":20,"text":252,"correct":32},"请经验丰富的老程序员进行技术指导或协助完成工作",{"key":24,"text":254,"correct":22},"要求项目组成员每天加班2～3个小时进行赶工",{"key":27,"text":256,"correct":22},"招聘一批新的程序员到项目组中",{"key":30,"text":258,"correct":22},"购买最新版本的软件开发工具",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":27,"analysis":33},388835,"进度控制是避免工期拖延的一种方法。进度控制中的纠正行为通常加速某些活动以确保这些活动能够及时完成。为了重新编制和执行进度表，纠正行为通常要求_____。",[263,265,267,269],{"key":20,"text":264,"correct":22},"做大家都不喜欢的决策",{"key":24,"text":266,"correct":22},"及时调整基线",{"key":27,"text":268,"correct":32},"进行原因分析",{"key":30,"text":270,"correct":22},"资源平衡",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":30,"analysis":33},388836,"己知某系统由A B C D E F六个活动构成，项目实习人员根据活动逻辑关系及历时等信息绘制了该系统的网络图，并给出了该系统的工期为9周，项目组其他成员纷纷提出意见。以下意见中（ ）是正确的。",[275,277,279,281],{"key":20,"text":276,"correct":22},"逻辑关系错误，项目工期应为7周",{"key":24,"text":278,"correct":22},"有循环回路，项目工期是正确的",{"key":27,"text":280,"correct":22},"节点序号编排不对，项目工期正确",{"key":30,"text":282,"correct":32},"项目工期应为8周",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":24,"analysis":33},388837,"某项任务由子任务Ⅰ（计划编制和批准）和子任务Ⅱ（计划实施）组成。项目经理认为子任务Ⅰ的乐观历时为3天，最可能为4天，悲观历时为8天；子任务Ⅱ的乐观历时为5天，最可能6为天，悲观历时为10天。根据估算，该任务估算历时为 （ ） 天。",[287,288,289,290],{"key":20,"text":233,"correct":22},{"key":24,"text":111,"correct":32},{"key":27,"text":113,"correct":22},{"key":30,"text":115,"correct":22},{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":27,"analysis":33},388838,"在一个单CPU的计算机系统中，采用按优先级抢占的进程调度方案，且所有任务可以并行使用I\u002FO设备。现在有三个任务T1、T2和T3，其优先级分别为高、中、低，每个任务需要先占用CPU 10ms，然后再使用I\u002FO设备13ms，最后还需要再占用CPU 5ms。如果操作系统的开销忽略不计，这三个任务从开始到全部结束所用的总时间为 （ ） ms",[295,297,299,301],{"key":20,"text":296,"correct":22},"61",{"key":24,"text":298,"correct":22},"84",{"key":27,"text":300,"correct":32},"58",{"key":30,"text":302,"correct":22},"48",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":27,"analysis":33},388839,"监理工程师可以采用多种技术手段实施信息系统工程的进度控制。下面 （ ）不属于进度控制的技术手段。",[307,309,311,313],{"key":20,"text":308,"correct":22},"A. 图表控制法",{"key":24,"text":310,"correct":22},"网络图计划法",{"key":27,"text":312,"correct":32},"BC分析法",{"key":30,"text":314,"correct":22},"&ldquo;香蕉&rdquo;曲线图法",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":24,"analysis":33},388840,"关键路径法是多种项目进度分析方法的基础。 （52） 将关键路径法分析的结果应用到项目日程表中。",[319,321,323,325],{"key":20,"text":320,"correct":22},"PERT网络分析",{"key":24,"text":322,"correct":32},"甘特图",{"key":27,"text":324,"correct":22},"优先日程图法",{"key":30,"text":326,"correct":22},"启发式分析法",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":20,"analysis":33},388841,"对以下箭线图，理解正确的是：",[331,333,335,337],{"key":20,"text":332,"correct":32},"活动A和B可以同时进行；只有活动A和B都完成后，活动C才开始",{"key":24,"text":334,"correct":22},"活动A先于活动B进行；只有活动A和B都完成后，活动C才开始",{"key":27,"text":336,"correct":22},"活动A和B可以同时进行；A完成后C即可开始",{"key":30,"text":338,"correct":22},"活动A先于活动B进行；A完成后C即可开始",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":27,"analysis":33},388842,"根据以下某项目的网络图，在最佳的人力资源利用情况下，限定在最短时间内完成项目，则项目的人力资源要求至少为 （ ） 人。",[343,344,345,346],{"key":20,"text":231,"correct":22},{"key":24,"text":229,"correct":22},{"key":27,"text":57,"correct":32},{"key":30,"text":55,"correct":22},{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":27,"analysis":33},388843,"下表为同时开展的4个项目在某个时刻的计划值PV、实际成本AC和挣值EV，该时刻成本超出最多的项目和进度最为落后的项目分别是 （ ） 。",[351,353,355,357],{"key":20,"text":352,"correct":22},"项目1，项目1",{"key":24,"text":354,"correct":22},"项目3，项目2",{"key":27,"text":356,"correct":32},"项目4，项目4",{"key":30,"text":358,"correct":22},"项目2，项目4",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":27,"analysis":33},388844,"某公司承接了城市道路信息系统建设项目。由于施工日期正好是7 月份的雨季。项目团队为了管理好项目的进度，最好采用 _____ 进行进度管理",[363,365,367,369],{"key":20,"text":364,"correct":22},"进度比较横道图",{"key":24,"text":366,"correct":22},"资源平衡方法",{"key":27,"text":368,"correct":32},"假设情景分析方法",{"key":30,"text":370,"correct":22},"关键链法",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":24,"analysis":33},388845,"在进度管理中（ ）是通过增加资源，以最小的成本代价来压缩进度工期的一种技术。",[375,377,379,380],{"key":20,"text":376,"correct":22},"快速跟进",{"key":24,"text":378,"correct":32},"赶工",{"key":27,"text":270,"correct":22},{"key":30,"text":381,"correct":22},"资源平滑",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},388846,"某工程包括 A、 B、 C、 D、 E、 F、G七项工作，各工作的紧前工作、所需时间以及所需人数如下表所示（假设每个人均能承担各项工作），按此工期，整个工程最少需要 （ ） 人。",[386,387,388,389],{"key":20,"text":57,"correct":32},{"key":24,"text":229,"correct":22},{"key":27,"text":231,"correct":22},{"key":30,"text":233,"correct":22},{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":20,"analysis":33},388847,"关键路径法是多种项目进度分析方法的基础。（ ） 是关键路径法的延伸，为项目实施过程中引入活动持续期的变化。",[394,395,396,397],{"key":20,"text":320,"correct":32},{"key":24,"text":322,"correct":22},{"key":27,"text":324,"correct":22},{"key":30,"text":326,"correct":22},{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":27,"analysis":33},388848,"进度网络分析技术中的一种方法是 _____ ，它可以根据有限的资源对项目进度表进行调整。在确定了关键路线之后，将资源的有无与多寡考虑进去，确定资源制约进度表，并增加了持续时间缓冲段，这些持续时间缓冲段属于非工作计划活动",[402,404,406,407],{"key":20,"text":403,"correct":22},"关键路径法",{"key":24,"text":405,"correct":22},"假设情景分析法",{"key":27,"text":370,"correct":32},{"key":30,"text":408,"correct":22},"资源平衡法",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":27,"analysis":33},388849,"在进行进度安排时，PERT图不能清晰地描述（ ）",[413,415,417,419],{"key":20,"text":414,"correct":22},"每个任务从何时开始",{"key":24,"text":416,"correct":22},"每个任务到何时结束",{"key":27,"text":418,"correct":32},"各任务之间的并行情况",{"key":30,"text":420,"correct":22},"各任务之间的依赖关系",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":20,"analysis":33},388850,"某工程包括 A、 B、 C、 D、 E、 F、G七项工作，各工作的紧前工作、所需时间以及所需人数如下表所示（假设每个人均能承担各项工作）按此工期，整个工程最少需要（ ）人。",[425,426,427,428],{"key":20,"text":57,"correct":32},{"key":24,"text":229,"correct":22},{"key":27,"text":231,"correct":22},{"key":30,"text":233,"correct":22},{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":30,"analysis":33},388851,"某软件项目的活动图如下图所示，其中顶点表示项目里程碑，连接顶点的边表示包含的活动，边上的数字表示相应活动的持续时间（天），则完成该项目的最少时间为（17）天。",[433,434,436,438],{"key":20,"text":111,"correct":22},{"key":24,"text":435,"correct":22},"15",{"key":27,"text":437,"correct":22},"16",{"key":30,"text":125,"correct":32},{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":27,"analysis":33},388852,"项目经理小张对自己正在做的一个项目进行成本挣值分析后，画出了如下所示的一张图，当前时间为图中的检查日期。根据该图小张分析：该项目进度 （ ） 。",[443,445,447,449],{"key":20,"text":444,"correct":22},"正常",{"key":24,"text":446,"correct":22},"落后",{"key":27,"text":448,"correct":32},"超前",{"key":30,"text":450,"correct":22},"无法判断",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":30,"analysis":33},388853,"公式 （ ） 能最准确地计算项目活动的工作量。",[455,457,459,461],{"key":20,"text":456,"correct":22},"工作量 = 历时\u002F人员生产率",{"key":24,"text":458,"correct":22},"工作量 = 历时\u002F人力资源数量",{"key":27,"text":460,"correct":22},"工作量 =（最乐观时间+4最可能时间+最悲观时间）\u002F 6",{"key":30,"text":462,"correct":32},"工作量 = 项目规模\u002F人员生产率",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":24,"analysis":33},388854,"某工程包括 A、 B、 C、 D、 E、 F、G七个作业，各个作业的紧前作业、所需时间、所需人数如下表： 整个工程至少需要 （ ） 人。",[467,468,469,470],{"key":20,"text":231,"correct":22},{"key":24,"text":233,"correct":32},{"key":27,"text":113,"correct":22},{"key":30,"text":117,"correct":22},{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":30,"analysis":33},388855,"某信息系统集成项目包括7个作业（A～ G），各作业所需的时间、人数以及各作业之间的衔接关系如图所示（其中虚线表示不消耗资源的虚作业）。 作业都按最早时间开始，那么正确描述该工程每一天所需人数的图为 （ ） 。",[475,477,479,481],{"key":20,"text":476,"correct":22},"见题干A图",{"key":24,"text":478,"correct":22},"见题干B图",{"key":27,"text":480,"correct":22},"见题干C图",{"key":30,"text":482,"correct":32},"见题干D图",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":24,"analysis":33},388856,"图4是一个软件项目的活动图，其中顶点表示项目里程碑，边表示包含的活动，边上的权重表示活动的持续时间，则里程碑（）在关键路径上。",[487,489,491,493],{"key":20,"text":488,"correct":22},"1",{"key":24,"text":490,"correct":32},"2",{"key":27,"text":492,"correct":22},"3",{"key":30,"text":51,"correct":22},{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":24,"analysis":33},388857,"某监理单位承担了一个信息系统工程全过程的监理 工作在应用系统建设过程中，由于工期紧张，成本有限，监理工程师按照承建单位的进度计划严格进行跟踪检查，并要求承建单位对 A、 B、 C、D四个重要活动进行成本优化。监理工程师在检查承建单位项目经理的成本优化方案时，检查了如下网络图: 该项目的关键路径为（）",[498,500,502],{"key":20,"text":499,"correct":22},"A. 开始AB 结束",{"key":24,"text":501,"correct":32},"B. 开始CD 结束",{"key":27,"text":33,"correct":22},{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":27,"analysis":33},388858,"某监理单位承担了一个信息系统工程全过程的监理 工作在应用系统建设过程中，由于工期紧张，成本有限，监理工程师按照承建单位的进度计划严格进行跟踪检查，并要求承建单位对 A、 B、 C、D四个重要活动进行成本优化。监理工程师在检查承建单位项目经理的成本优化方案时，检查了如下网络图: 在正常工期下，如果将项目工期减少1周，则首先应该压缩哪个活动?",[507,508,509,510],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":32},{"key":30,"text":30,"correct":22},{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":30,"analysis":33},388859,"（ ）不是活动历时估算依据。",[515,517,519,521],{"key":20,"text":516,"correct":22},"项目范围说明书",{"key":24,"text":518,"correct":22},"活动资源需求",{"key":27,"text":520,"correct":22},"组织过程资产",{"key":30,"text":522,"correct":32},"项目进度计划",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":20,"analysis":33},388860,"项目进度控制是依据项目进度基准计划对项目的实际进度进行监控，使项目能够按时完成，以下关于项目进度的叙述中（ ）是不正确的。",[527,529,531,533],{"key":20,"text":528,"correct":32},"项目进度至关重要，因此进度控制需要在项目初期优先关注",{"key":24,"text":530,"correct":22},"进度控制必须与其他变化控制，包括成本控制与范围控制紧密结合",{"key":27,"text":532,"correct":22},"项目进度控制是项目整体控制的一个组成部分",{"key":30,"text":534,"correct":22},"对项目进度的控制，应重点关注项目进展报告和执行状态报告",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":20,"analysis":33},388861,"已知网络计划中，工作M有两项紧后工作，这两项紧后工作的最早开始开始时间分别为第16天和第17天，工作M的最早开始时间和最迟开始时间分别为第6天和第9天，如果工作M的持续时间为9天，则工作M的表述正确的是（ ）。",[539,541,543,545],{"key":20,"text":540,"correct":32},"总时差为3天",{"key":24,"text":542,"correct":22},"自由时差为0天",{"key":27,"text":544,"correct":22},"总时差为2天",{"key":30,"text":546,"correct":22},"自由时差为2天",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":24,"analysis":33},388862,"项目进度网络图是（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":22},"活动定义的结果和活动历时估算的输入",{"key":24,"text":554,"correct":32},"活动排序的结果和进度计划编制的输入",{"key":27,"text":556,"correct":22},"活动计划编制的结果和进度计划编制的输入",{"key":30,"text":558,"correct":22},"活动排序的结果和活动历时估算的输入",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":27,"analysis":33},388863,"估算活动的持续时间是估算在有限的资源内完成单项活动所需工作时间段数的过程，所需的工具技术不包括 （ ） 。",[563,565,567,569],{"key":20,"text":564,"correct":22},"专家判断",{"key":24,"text":566,"correct":22},"类比估算",{"key":27,"text":568,"correct":32},"需求跟踪矩阵",{"key":30,"text":570,"correct":22},"三点估算",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":20,"analysis":33},388864,"（ ）体现了项目计划过程的正确顺序。",[575,577,579,581],{"key":20,"text":576,"correct":32},"范围规划--范围定义--活动定义--活动历时估算",{"key":24,"text":578,"correct":22},"范围定义--范围规划--活动定义--活动排序--活动历时估算",{"key":27,"text":580,"correct":22},"范围规划--范围定义--活动排序--活动定义--活动历时估算",{"key":30,"text":582,"correct":22},"活动历时估算--范围规划--范围定义--活动定义--活动排序",[584,588,591,594,597,600],{"id":585,"name":586,"category":7,"favorite":587},136,"法律职业试卷二(客观题 )",2,{"id":589,"name":590,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":592,"name":593,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":595,"name":596,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":598,"name":599,"category":7,"favorite":8},28,"安全工程师",{"id":601,"name":602,"category":7,"favorite":8},112,"安全生产法律知识"]